{"bekendtgoerelseNoegle":{"noticeId":{"value":"e8161bb8-4f08-49b0-a2a8-d842b4b30e2a"},"noticeVersion":{"value":"01"},"noticePublicationNumber":{"value":"00194846-2025"}},"htmlDA":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Køber</span><section>1.1&nbsp;<span class=\"label\">Køber</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">DIN Forsyning Overskudsvarme/Køl A/S</span></section>\n            <section><span class=\"label\">Køberens retlige status</span><span class=\"text\">: </span><span class=\"dynamic-label\">Offentligretligt organ</span></section>\n            <section><span class=\"label\">Den ordregivende myndigheds aktiviteter</span><span class=\"text\">: </span><span class=\"dynamic-label\">Generelle offentlige tjenesteydelser</span></section>\n            <section><span class=\"label\">Den ordregivende enheds aktiviteter</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vandrelaterede aktiviteter</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Excess heating/cooling in Esbjerg</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">The City of Esbjerg is at the forefront of the green transition in Denmark. This project\n                  has been undertaken by DIN Forsyning with the purpose of securing a circular and sector\n                  coupled approach to the undergoing PtX development locally in the City of Esbjerg.\n                  Efficient cooling is a necessity for PtX and DIN Forsyning intends to ensure that\n                  as much excess heat from PtX production as possible, finds its way to reutilization\n                  as district heating, supplied to homes and industry in the City of Esbjerg. DIN Forsyning\n                  shall deliver a system capable of integrating excess heat from the PtX Facilities\n                  into the district heating system and/or cooling the excess heat effi-ciently from\n                  the facility that cannot be utilized in the district heating System. The Contract\n                  is for the delivery of a turnkey process cooling plant for rejection of the excess\n                  heat from two Power-to-X plants (PtX plants) located on two different sites in the\n                  Måde area of Esbjerg, as well as supplying these PtX-plants with cooling water at\n                  specified maximum cooling water temperature to the Contract-ing Entity (the “Project”).\n                  The Project is a further development and expansion of the Contracting Entity’s district\n                  heating portfolio. The Contract consist of a common infrastructure project as specified\n                  in Employer’s Technical Requirements tender conditions section 2.1 and 2.2. Besides\n                  the common infrastructure, the Contract consist of different options as further listed\n                  in tender conditions section 1.3. The two PtX-plants have slightly different time\n                  schedules and to handle this within the project, the process cooling systems of the\n                  Works are split up into two options (option 1 and 2) designated Velbæk and Måde. The\n                  excess heat from the PtX-plants to be handled are approx. 250 MW from option 1: Cooling\n                  plant 20 Sahara, and 600 MW from option 2: Cooling plant 21 Måde The expected start\n                  date for construction is 10 June 2026 and with a completion date of 1 March 2029.</span></section>\n            <section><span class=\"label\">Identifikator for proceduren</span><span class=\"text\">: </span><span class=\"value\">b3ace001-5910-49f6-b9e4-6801d83b85f5</span></section>\n            <section><span class=\"label\">Tidligere bekendtgørelse</span><span class=\"text\">: </span><span class=\"value\">4f739fcb-d1e9-4824-b4c4-00d00e6143bd-01</span></section>\n            <section><span class=\"label\">Intern identifikator</span><span class=\"text\">: </span><span class=\"value\">384820</span></section>\n            <section><span class=\"label\">Udbudsprocedure</span><span class=\"text\">: </span><span class=\"dynamic-label\">Konkurrencepræget dialog</span></section>\n            <section><span class=\"label\">Hovedpunkterne i proceduren</span><span class=\"text\">: </span><span class=\"value\">The Contracting Entity will invite each of the prequalified Tenderers to dialogue\n                  meetings. Initially, the Contracting Entity has planned for three (3) rounds of dialogue\n                  meetings as well as the Tenderer to propose a solution description to form the basis\n                  for the last dialogue round. The purpose of each of the dialogue meetings are expected\n                  to be: First meeting to present the Contracting Entity’s current ideas for the solution\n                  and the Tenderer to provide feedback; to have a dialogue about the solution in separate\n                  breakout sessions in respective disciplines a. This could e.g. include cooling towers,\n                  legionella control, technical requirements in general, civil works including building\n                  design, limitations, electrical requirements, SCADA, contractual terms etc. to clarify\n                  any misunderstandings, concerns and/or uncertainties the Tenderer or the Contracting\n                  Entity might have Second meeting to have an in-depth dialogue about the Contracting\n                  Entity’s adapted material, including any opportunities for improvement or suggestions\n                  for changes to the material to have a dialogue about the solution in separate break\n                  outs in respective disciplines to clarify any misunderstandings, concerns and/or uncertainties\n                  the Tenderer or the Contracting Entity might have Third meeting to have a presentation\n                  and a dialogue about the Tenderers initial proposed solution and price breakout sessions\n                  for each discipline a review of the solution description, including any ambigui-ties\n                  for the Contracting Entity Next step in the process Prior to each meeting, the Tenderer\n                  will receive an invitation containing an agenda with specific topics for that meeting.\n                  At each meeting, the Contracting Entity reserves the right to request and determine\n                  which people with specific knowledge from the Tenderers that must participate in the\n                  meeting. The Contracting Entity reserves the right to call for additional rounds of\n                  dialogue meetings, if the Contracting Entity deems this relevant and necessary. When\n                  the Contracting Entity considers that the dialogue phase shall end, it will notify\n                  the Tenderers and call for Tenders based on the final tender documents submitted by\n                  the Contracting Entity. Therefore, all three (3) meetings will not necessarily be\n                  held. The Tenderer should note that the tender documents form the Contracting Entity’s\n                  proposal for dialogue during the dialogue process and does not constitute the final\n                  material with the final requirements. Requirements are dialogue requirements that\n                  the Contracting Entity has in principle decided on, but the Tenderers may as part\n                  of the dialogue meetings propose the requirements to be adjusted in accordance with\n                  Tender conditions section 9.3. When submitting a Tender, the requirements will no\n                  longer be understood as dialogue requirements, and if a Tenderer has reservations\n                  about a requirement in its Tender, this will be handled in accordance with tender\n                  conditions section 8.9.</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens art</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bygge og anlæg</span></section>\n               <section><span class=\"label\">Primær klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251150</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejde i forbindelse med køletårne</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">09323000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Fjernvarme (indenbys)</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31140000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Køletårne</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">34931000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Havneudstyr</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">39715210</span><span class=\"text\"> </span><span class=\"dynamic-label\">Udstyr til centralvarme</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">42131320</span><span class=\"text\"> </span><span class=\"dynamic-label\">Reduktionsventilarrangementer</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">44161700</span><span class=\"text\"> </span><span class=\"dynamic-label\">Rørrensere</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45111291</span><span class=\"text\"> </span><span class=\"dynamic-label\">Byggemodning</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45213250</span><span class=\"text\"> </span><span class=\"dynamic-label\">Arbejder i forbindelse med industribygninger</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45223000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge-anlægsarbejder: forskellige bygværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45231110</span><span class=\"text\"> </span><span class=\"dynamic-label\">Rørlægningsarbejde</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45231300</span><span class=\"text\"> </span><span class=\"dynamic-label\">Arbejder i forbindelse med vand- og kloakrørledninger</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45232140</span><span class=\"text\"> </span><span class=\"dynamic-label\">Anlægsarbejde: hovedledninger til fjernvarme</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45244100</span><span class=\"text\"> </span><span class=\"dynamic-label\">Havanlæg</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejde i forbindelse med kraftværker og varmeværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251140</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge-anlægsarbejde: varmekraftværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251200</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge-anlægsarbejde: varmeværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251250</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge-anlægsarbejde: fjernvarmeværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45300000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Udførelse af bygningsinstallationer</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45331000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Installation af varme-, ventilations- og klimaanlæg</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Esbjerg</span></section>\n               <section><span class=\"label\">Landespecifik underafdeling (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            </section>\n            <section>2.1.3&nbsp;<span class=\"label\">Værdi</span><section><span class=\"label\">Anslået værdi eksklusiv moms</span><span class=\"text\">: </span><span class=\"value\">1.000.000.000</span><span class=\"text\"> </span><span class=\"label\">Dansk krone</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Indkaldelse af tilbud er afsluttet</span></section>\n               <section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\">Information on the value of the tendered contract is based on DIN Forsyning Overskudsvarme/Køl\n                     A/S' estimated estimate including options and any extra work. The application must\n                     consist of the European Single Procurement Document (ESPD), in which the requested\n                     information must be provided. The ESPD is a self-declaration form which serves as\n                     initial documentation that the Applicant, Supporting Entities or the Consortium meets\n                     the criteria for exclusion, suitability and selection. This information must subsequently\n                     be verified. If you intend to participate in the Tender Procedure as a member of a\n                     Consortium, a separate eESPD must be submitted for each member of the Consortium.\n                     If you intend to participate in the Tender Procedure with any Supporting Entity, a\n                     separate eESPD must be submitted for each Supporting Entity. Any eESPD from any Supporting\n                     Entity must be signed. The Contracting Entity reserves the right to obtain missing\n                     signatures after the Prequalification Deadline but prior to Prequalification The Applicant\n                     may rely on one or more Supporting Entities for the purpose of being prequalified\n                     and for executing the Contract. If the Applicant relies on any Supporting Entity,\n                     the Contracting Entity encourages the Applicant to submit a Declaration of Support\n                     from each such Supporting Entity together with the Application and to use the template\n                     made available in Annex C - Declaration of Support. Any Declaration of Support must\n                     be submitted at the latest when submitting the final ESPD documentation. If the Applicant\n                     relies on a Supporting Entity’s economic and financial capacity, the Supporting Entity\n                     will be requested a Declaration of Support to undertake that it will act as a guarantor\n                     for the Applicant to the benefit of the Contracting Entity if the Applicant is awarded\n                     the Contract The Applicant must confirm that the Applicant is not covered by the mandatory\n                     exclusion grounds stated in section 135(1)-(3) and Section 136 of the Danish Pro-curement\n                     Act. Otherwise, the Contracting Entity is obliged to exclude the Applicant. The Applicant\n                     must further confirm that the Applicant is not covered by the optional exclusion grounds\n                     at stated section 137(1) no. 1-5 of the Danish Procurement Act. Please submit you\n                     answer to the exclusion grounds mentioned. An Applicant is not excluded if the Applicant\n                     can provide sufficient documentation that the Applicant is reliable according to section\n                     138 (self-cleaning) of the Danish Procurement Act If the Application is submitted\n                     by a group of undertakings (e.g., a Consortium), the Applicant is encouraged to sign\n                     the Consortium Declaration in the form of Annex B - Consortium Declaration and to\n                     submit it together with the Application. If the Applicant is a consortium; a) the\n                     members of the Consortium shall be jointly and severally liable to the Contracting\n                     Entity for the performance of the Consortiums’ obligations under of the Contract;\n                     and b) neither the members nor (if known) the scope and parts of the Contract to be\n                     carried out by each member nor the legal status of the Consortium shall be altered\n                     without the prior consent of the Contracting Entity. DIN Forsyning Overskudsvarme/køl\n                     A/S reserves the right to request an applicant/tenderer to provide documentation for\n                     the information at any stage of the tender process if this is necessary to ensure\n                     that the procedure is carried out correctly. For Danish tenderers, documentation may,\n                     for example, consist of a serial certificate issued by the Danish Business Authority.\n                     Due to Council Regulation (EU) 2022/576 of 8 April 2022 amending Regulation (EU) No\n                     833/2014 concerning restrictive measures in view of Russia’s actions destabilizing\n                     the situation in Ukraine, the Contracting Entity can and will not award the Contract\n                     to a tenderer with certain relations to Russia. The prohibited relations to Russia\n                     are further outlined in Annex D - Declaration regarding relations to Russia. Therefore,\n                     the Applicant is encouraged to sign the Declaration regarding relations to Russia\n                     in the form of Annex D - Declaration regarding relations to Russia and to submit it\n                     together with the Application. Before the Contract is awarded, the Contracting Entity\n                     will require that the tenderer who has submitted the most economically advantageous\n                     tender based on the criteria set out in the Tender Procedure declares that the tenderer\n                     does not have relations to Russia that are prohibited according to Council Regulation\n                     (EU) 2022/576. The tender is not divided into successive phases and DIN Forsyning\n                     Overskudsvarme/Køl A/S does not intend to shortlist the number of tenderers during\n                     the dialog process.</span></section>\n               <section><span class=\"label\">Retsgrundlag</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Direktiv 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>5&nbsp;<span class=\"label\">Delkontrakt</span><section>5.1&nbsp;<span class=\"label\">Teknisk ID for partiet</span><span class=\"text\">: </span><span class=\"value\">LOT-0000</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Excess heating/cooling in Esbjerg</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">The City of Esbjerg is at the forefront of the green transition in Denmark. This project\n                  has been undertaken by DIN Forsyning with the purpose of securing a circular and sector\n                  coupled approach to the undergoing PtX development locally in the City of Esbjerg.\n                  Efficient cooling is a necessity for PtX and DIN Forsyning intends to ensure that\n                  as much excess heat from PtX production as possible, finds its way to reutilization\n                  as district heating, supplied to homes and industry in the City of Esbjerg. DIN Forsyning\n                  shall deliver a system capable of integrating excess heat from the PtX Facilities\n                  into the district heating system and/or cooling the excess heat effi-ciently from\n                  the facility that cannot be utilized in the district heating System. The Contract\n                  is for the delivery of a turnkey process cooling plant for rejection of the excess\n                  heat from two Power-to-X plants (PtX plants) located on two different sites in the\n                  Måde area of Esbjerg, as well as supplying these PtX-plants with cooling water at\n                  specified maximum cooling water temperature to the Contract-ing Entity (the “Project”).\n                  The Project is a further development and expansion of the Contracting Entity’s district\n                  heating portfolio. The Contract consist of a common infrastructure project as specified\n                  in Employer’s Technical Requirements tender conditions section 2.1 and 2.2. Besides\n                  the common infrastructure, the Contract consist of different options as further listed\n                  in tender conditions section 1.3. The two PtX-plants have slightly different time\n                  schedules and to handle this within the project, the process cooling systems of the\n                  Works are split up into two options (option 1 and 2) designated Velbæk and Måde. The\n                  excess heat from the PtX-plants to be handled are approx. 250 MW from option 1: Cooling\n                  plant 20 Sahara, and 600 MW from option 2: Cooling plant 21 Måde The expected start\n                  date for construction is 10 June 2026 and with a completion date of 1 March 2029.</span></section>\n            <section><span class=\"label\">Intern identifikator</span><span class=\"text\">: </span><span class=\"value\">384820</span></section>\n            <section>5.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens art</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bygge og anlæg</span></section>\n               <section><span class=\"label\">Primær klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251150</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejde i forbindelse med køletårne</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">09323000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Fjernvarme (indenbys)</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31140000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Køletårne</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">34931000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Havneudstyr</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">39715210</span><span class=\"text\"> </span><span class=\"dynamic-label\">Udstyr til centralvarme</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">42131320</span><span class=\"text\"> </span><span class=\"dynamic-label\">Reduktionsventilarrangementer</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">44161700</span><span class=\"text\"> </span><span class=\"dynamic-label\">Rørrensere</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45111291</span><span class=\"text\"> </span><span class=\"dynamic-label\">Byggemodning</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45213250</span><span class=\"text\"> </span><span class=\"dynamic-label\">Arbejder i forbindelse med industribygninger</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45223000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge-anlægsarbejder: forskellige bygværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45231110</span><span class=\"text\"> </span><span class=\"dynamic-label\">Rørlægningsarbejde</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45231300</span><span class=\"text\"> </span><span class=\"dynamic-label\">Arbejder i forbindelse med vand- og kloakrørledninger</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45232140</span><span class=\"text\"> </span><span class=\"dynamic-label\">Anlægsarbejde: hovedledninger til fjernvarme</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45244100</span><span class=\"text\"> </span><span class=\"dynamic-label\">Havanlæg</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejde i forbindelse med kraftværker og varmeværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251140</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge-anlægsarbejde: varmekraftværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251200</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge-anlægsarbejde: varmeværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251250</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge-anlægsarbejde: fjernvarmeværker</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45300000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Udførelse af bygningsinstallationer</span></section>\n               <section><span class=\"label\">Yderligere klassificering</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45331000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Installation af varme-, ventilations- og klimaanlæg</span></section>\n               <section><span class=\"label\">Valgmuligheder</span><span class=\"text\">:</span><section><span class=\"label\">Beskrivelse af optioner</span><span class=\"text\">: </span><span class=\"value\">Option 1: Cooling plant 20 Sahara The Contracting Entity requests an option for a\n                        cooling plant to Sahara. The requirements for Option 1: Cooling plant 20 Sahara are\n                        described in more detail in the Contract document ‘Employer’s Technical Requirements’\n                        section 2.1 and 2.3. Option 2: Cooling plant 21 Måde The Contracting Entity requests\n                        an option for a cooling plant to Måde. The requirements for Option 2: Cooling plant\n                        21 Måde are described in more detail in the Contract document ‘Employer’s Technical\n                        Requirements’ section 2.1 and 2.4. Option 3: Seawater intake 20C The Contracting Entity\n                        requests an option for seawater intake. The requirements for Option 3: Seawater intake\n                        is described in more detail in the Contract document ‘Employer’s Technical Requirements’\n                        section 2.1 and 2.5. Option 4: Extended DNP The Contracting Entity requests an option\n                        for an extension of the general DNP from two (2) years to five (5) years. This is\n                        further described in the Contract document ‘B.00C Particular Conditions – Part A Contract\n                        Data’ under Sub-Clause 1.1.27.</span></section>\n               </section>\n            </section>\n            <section>5.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Esbjerg</span></section>\n               <section><span class=\"label\">Landespecifik underafdeling (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n               <section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\"></span></section>\n            </section>\n            <section>5.1.3&nbsp;<span class=\"label\">Anslået varighed</span><section><span class=\"label\">Anden varighed</span><span class=\"text\">: </span><span class=\"dynamic-label\">Ukendt</span></section>\n            </section>\n            <section>5.1.4&nbsp;<span class=\"label\">Fornyelse</span><section><span class=\"label\">Højeste antal fornyelser</span><span class=\"text\">: </span><span class=\"value\">0</span></section>\n            </section>\n            <section>5.1.5&nbsp;<span class=\"label\">Værdi</span><section><span class=\"label\">Anslået værdi eksklusiv moms</span><span class=\"text\">: </span><span class=\"value\">1.000.000.000</span><span class=\"text\"> </span><span class=\"label\">Dansk krone</span></section>\n            </section>\n            <section>5.1.6&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"dynamic-label\">Indkøbsprojekt, der ikke finansieres med EU-midler</span></section>\n               <section><span class=\"label\">Udbuddet er omfattet af aftalen om offentlige udbud (GPA)</span><span class=\"text\">: </span><span class=\"label\">ja</span></section>\n               <section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\">Information on the value of the tendered contract is based on DIN Forsyning Overskudsvarme/Køl\n                     A/S' estimated estimate including options and any extra work. The application must\n                     consist of the European Single Procurement Document (ESPD), in which the requested\n                     information must be provided. The ESPD is a self-declaration form which serves as\n                     initial documentation that the Applicant, Supporting Entities or the Consortium meets\n                     the criteria for exclusion, suitability and selection. This information must subsequently\n                     be verified. If you intend to participate in the Tender Procedure as a member of a\n                     Consortium, a separate eESPD must be submitted for each member of the Consortium.\n                     If you intend to participate in the Tender Procedure with any Supporting Entity, a\n                     separate eESPD must be submitted for each Supporting Entity. Any eESPD from any Supporting\n                     Entity must be signed. The Contracting Entity reserves the right to obtain missing\n                     signatures after the Prequalification Deadline but prior to Prequalification The Applicant\n                     may rely on one or more Supporting Entities for the purpose of being prequalified\n                     and for executing the Contract. If the Applicant relies on any Supporting Entity,\n                     the Contracting Entity encourages the Applicant to submit a Declaration of Support\n                     from each such Supporting Entity together with the Application and to use the template\n                     made available in Annex C - Declaration of Support. Any Declaration of Support must\n                     be submitted at the latest when submitting the final ESPD documentation. If the Applicant\n                     relies on a Supporting Entity’s economic and financial capacity, the Supporting Entity\n                     will be requested a Declaration of Support to undertake that it will act as a guarantor\n                     for the Applicant to the benefit of the Contracting Entity if the Applicant is awarded\n                     the Contract The Applicant must confirm that the Applicant is not covered by the mandatory\n                     exclusion grounds stated in section 135(1)-(3) and Section 136 of the Danish Pro-curement\n                     Act. Otherwise, the Contracting Entity is obliged to exclude the Applicant. The Applicant\n                     must further confirm that the Applicant is not covered by the optional exclusion grounds\n                     at stated section 137(1) no. 1-5 of the Danish Procurement Act. Please submit you\n                     answer to the exclusion grounds mentioned. An Applicant is not excluded if the Applicant\n                     can provide sufficient documentation that the Applicant is reliable according to section\n                     138 (self-cleaning) of the Danish Procurement Act If the Application is submitted\n                     by a group of undertakings (e.g., a Consortium), the Applicant is encouraged to sign\n                     the Consortium Declaration in the form of Annex B - Consortium Declaration and to\n                     submit it together with the Application. If the Applicant is a consortium; a) the\n                     members of the Consortium shall be jointly and severally liable to the Contracting\n                     Entity for the performance of the Consortiums’ obligations under of the Contract;\n                     and b) neither the members nor (if known) the scope and parts of the Contract to be\n                     carried out by each member nor the legal status of the Consortium shall be altered\n                     without the prior consent of the Contracting Entity. DIN Forsyning Overskudsvarme/køl\n                     A/S reserves the right to request an applicant/tenderer to provide documentation for\n                     the information at any stage of the tender process if this is necessary to ensure\n                     that the procedure is carried out correctly. For Danish tenderers, documentation may,\n                     for example, consist of a serial certificate issued by the Danish Business Authority.\n                     Due to Council Regulation (EU) 2022/576 of 8 April 2022 amending Regulation (EU) No\n                     833/2014 concerning restrictive measures in view of Russia’s actions destabilizing\n                     the situation in Ukraine, the Contracting Entity can and will not award the Contract\n                     to a tenderer with certain relations to Russia. The prohibited relations to Russia\n                     are further outlined in Annex D - Declaration regarding relations to Russia. Therefore,\n                     the Applicant is encouraged to sign the Declaration regarding relations to Russia\n                     in the form of Annex D - Declaration regarding relations to Russia and to submit it\n                     together with the Application. Before the Contract is awarded, the Contracting Entity\n                     will require that the tenderer who has submitted the most economically advantageous\n                     tender based on the criteria set out in the Tender Procedure declares that the tenderer\n                     does not have relations to Russia that are prohibited according to Council Regulation\n                     (EU) 2022/576. The tender is not divided into successive phases and DIN Forsyning\n                     Overskudsvarme/Køl A/S does not intend to shortlist the number of tenderers during\n                     the dialog process.</span></section>\n            </section>\n            <section>5.1.10&nbsp;<span class=\"label\">Tildelingskriterier</span><section><span class=\"label\">Kriterium</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Pris</span></section>\n                  <section><span class=\"label\">Navn</span><span class=\"text\">: </span><span class=\"value\">Evaluated price</span></section>\n                  <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">The Evaluated Price consists of the following amounts: (a) the Total Contract Price\n                        which includes the following; a. Price of the works b. Price of the listed options\n                        c. Price of evaluated guaranteed performance/consumption parameters d. Schedule of\n                        rates &amp; materials (b) and the converted monetary value of reservations to the Schedule\n                        of Payment and payments terms under the Contract Data. The Tenderer shall with its\n                        Tender submit rates and prices in the form provided in Annex F (Schedule of Rates)\n                        and the Contracting Entity will base its evaluation on the amount set out in Annex\n                        F. Note: When calculating the total evaluation price, the price of the works is corrected\n                        with additions or deductions for the performance of the solution in ques-tion. This\n                        means that the total evaluation price is only used for the evaluation and is therefore\n                        not an expression of the actual contract sum. Note: If the Tenderer does not complete\n                        all requested input for the Evaluated Price, the Contracting Entity will complete\n                        the missing input in Annex F – Schedule of Rates and Prices with the highest bid received\n                        from a Tenderer for the rel-evant input plus 20%. If an item in Annex F is deliberately\n                        priced at DKK 0, the Tenderer is asked to state this in order to avoid pricing of\n                        the relevant input plus 20%.</span></section>\n                  <section><span class=\"dynamic-label\">Vægtning (procentdel, præcis)</span><span class=\"text\">: </span><span class=\"value\">30</span></section>\n               </section>\n               <section><span class=\"label\">Kriterium</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Kvalitet</span></section>\n                  <section><span class=\"label\">Navn</span><span class=\"text\">: </span><span class=\"value\">Quality</span></section>\n                  <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Apart from Evaluated Price the evaluation consists of the sub-criterion Quality. The\n                        sub-criterion Quality consist of the following sub-sub-criteria; 1) Technical solution\n                        2) Project solution; Process- and time schedule, Organizations, culture and competences\n                        3) Contractual terms Evaluation of Technical solution In the assessment of the sub-criterion,\n                        the Contracting Entity will regard the following as positive; a) That the Tenderer's\n                        proposal is suitable to support the Project's success criteria and at the same time\n                        demonstrates an understanding of the outline proposal's choice and functional requirements.\n                        b) That the Tenderer's commissioning plan demonstrates knowledge and understanding\n                        of the commissioning requirements set out in the Contract and is suitable for ensuring\n                        that the facility will immediately meet the agreed requirements and be fully functional\n                        after delivery and commissioning. c) That the description and evaluation of the collaboration\n                        demonstrates knowledge and understanding of engage in an integrated collaboration\n                        as described in the cooperation agreement, including i. in particular utilization\n                        of the competencies of the key persons involved, ii. how sustainability can enrich\n                        the decisions in the early phases of the design as concretely as possible, iii. how\n                        the Tenderer's knowledge of process, constructability and economy can enrich decisions\n                        in the early phases of the project, and iv. whether the evaluation contains concrete\n                        suggestions for improving the collaboration between the Tenderer and the Contracting\n                        Entity Evaluation of Project solution; Process- and Time schedule, Organization, culture\n                        and competences 7.3.2 In the assessment of the sub-criterion, the Contracting Entity\n                        will regard the follow positive; a. A process- and time schedule showing a detailed\n                        program and test, which appears responsible and well described. Furthermore, a plan\n                        that supports the fastest possible delivery and supports a high degree of quality\n                        management during the delivery and test phases. b. An organizational plan showing\n                        a robust organization with clear and logical competencies and responsibilities, which\n                        through the phases supports the collaboration model and the Contracting Entity’s organization\n                        as described in the Contract, including Collaboration Agreement. i. The more detailed,\n                        project specific (and relevant), coherent, and designed for continuous implementation\n                        the management and les-sons learned procedures are, the better. It is also considered\n                        posi-tive if the proposal includes examples from previous projects and how this is\n                        applied to this project. c. That the key personnel offered have as specific and relevant\n                        education, experience and skills as possible in relation to their role in the organization,\n                        and that these are utilized in the organization, including through the assumed allocation\n                        to the Project. The Contracting Entity will pay particular attention to the key persons\n                        performing the following roles and tasks: i. The Tenderer's project managers (primary\n                        contact persons for the Contracting Entity) ii. The Tenderer's engineering design,\n                        including in particular regarding seawater and cooling tower systems and handling\n                        of biological fouling and legionella. iii. Overall responsibility for design carried\n                        out by the Tenderer or its subcontractors/suppliers iv. The Tenderer's construction\n                        management d. That the description of the collaboration between the Contracting Entity\n                        and the Tenderer in both the design and execution phases shows an understanding of\n                        and provides concrete proposals for solving the challenges and opportunities presented\n                        by the form of collaboration offered, including in particular: i. how the right skills,\n                        including from the Tenderer's key subcontractors and suppliers, are involved at the\n                        right time - without unnecessarily complicating or delaying the processes, - how,\n                        in the period from the Contracting Entity approval of the project proposal to de-livery,\n                        it is ensured that the intentions of the outline proposal and project proposal realized,\n                        including in particular how the Contracting Entity and the Tenderer are ensured real\n                        influence on how the Tenderer works with the project's finances without this leading\n                        to unclear roles and responsibilities, and; ii. how the Tenderer will, towards the\n                        milestones work together to ensure that the delivered material appears coordinated\n                        and coherent, without leading to unclear roles and responsibilities The Contracting\n                        Entity will make an overall evaluation under this sub-sub-criterion. Evaluation of\n                        Contractual Terms The documents listed below (the “Draft Contract Documents”) will\n                        be included in the evaluation of “Contractual Terms”: B.00A Contract Agreement B.00B\n                        General Conditions of Contract (FIDIC Conditions of Contract for Plant and Design-Build)\n                        B.00C Particular Conditions, Part A - Contract Data B.00D Particular Conditions, Part\n                        B – Special provisions B.03 Schedule 3 - Parent Company Guarantee B.04 Schedule 4\n                        - Performance Security B.05 Schedule 5 - Advance Payment Guarantee B.07 Schedule 7\n                        – Schedule of Rates and Prices B.08 Schedule 8 – Collaboration Agreement If the Tender\n                        includes proposed changes: - to any other contract documents than listed above as\n                        a Draft Contract Document; - to the payment terms under the Contract; or - to any\n                        clauses listed in Section 7.4.3 such proposed changes will not be subject to evaluation\n                        under Contractual Terms</span></section>\n                  <section><span class=\"dynamic-label\">Vægtning (procentdel, præcis)</span><span class=\"text\">: </span><span class=\"value\">70</span></section>\n               </section>\n            </section>\n            <section>5.1.12&nbsp;<span class=\"label\">Udbudsvilkår</span><section><span class=\"label\">Oplysninger om undersøgelsesfrister</span><span class=\"text\">: </span><span class=\"value\">Klagevejledning: https://naevneneshus.dk/start-din-klage/klagenaevnet-for-udbud/vejledning/\n                     Nævnets klagefrister: Ved et udbud med prækvalifikation efter udbudsloven, ved forsyningsvirksomhedsdirektivet\n                     eller tilbudsloven skal en klage over ikke at være blevet prækvalificeret indgives\n                     inden for 20 kalenderdage. Dette er regnet fra dagen efter ordregivers afsendelse\n                     af underretning om prækvalifikation. Andre klager over udbud eller beslutninger, f.eks.\n                     tildeling af kontrakter, omfattet af udbudslovens afsnit II eller III eller forsyningsvirksomhedsdirektivet\n                     skal indgives 45 kalenderdage regnet fra dagen efter ordregiverens offentliggørelse\n                     af en bekendtgørelse i EU-Tidende om indgåelse af kontrakt. Hvis klagen handler om\n                     overtrædelser af tilbudsloven eller udbudslovens §§ 191 og 192, er klagefristen på\n                     45 kalenderdage regnet fra dagen efter ordregiverens underretning om tildelingsbeslutningen.\n                     Klager over indgåelse af rammeaftale efter udbudsloven (afsnit II, III og §§ 191 og\n                     192), forsyningsvirksomhedsdirektivet eller tilbudsloven skal være indgivet til klagenævnet\n                     inden 6 måneder regnet fra dagen efter ordregiverens underretning om tildelingsbeslutningen.\n                     Klager over indgåelse af en kontrakt baseret på en rammeaftale med genåbning af konkurrence\n                     eller et dynamisk indkøbssystem omfattet af udbudslovens afsnit II eller III eller\n                     forsyningsvirksomhedsdirektivet skal være indgivet til klagenævnet inden 30 kalenderdage\n                     regnet fra dagen efter ordregiverens underretning om tildelingsbeslutningen. Klager\n                     over en ordregivers beslutning om at videreføre en kontrakt (udbudslovens § 185, stk.\n                     2) skal indgives til klagenævnet inden 20 kalenderdage regnet fra dagen efter, at\n                     ordregiveren har offentliggjort sin beslutning (udbudslovens § 185, stk. 2, 3. pkt.).\n                     Har ordregiveren fulgt proceduren i lov om Klagenævnet for Udbud § 4, skal en klage\n                     over, at ordregiveren i strid med udbudsdirektivet eller forsyningsvirksomhedsdirektivet\n                     har indgået en kontrakt uden forudgående offentliggørelse af en udbudsbekendtgørelse\n                     indgives til klagenævnet inden 30 kalenderdage regnet fra dagen efter ordregiverens\n                     offentliggørelse af en bekendtgørelse i EU-Tidende om indgåelse af kontrakt. Reglerne\n                     om klagefrister findes i § 7 i lov om Klagenævnet for Udbud.</span></section>\n            </section>\n            <section>5.1.15&nbsp;<span class=\"label\">Teknikker</span><section><span class=\"label\">Rammeaftale</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Ingen rammeaftale</span></section>\n               </section>\n               <section><span class=\"label\">Oplysninger om det dynamiske indkøbssystem</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Intet dynamisk indkøbssystem</span></section>\n               </section>\n            </section>\n            <section>5.1.16&nbsp;<span class=\"label\">Yderligere oplysninger, mægling og gennemgang</span><section><span class=\"label\">Organisation med ansvar for klager</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for Udbud</span></section>\n               <section><span class=\"label\">Organisation, der leverer supplerende oplysninger om udbudsproceduren</span><span class=\"text\">: </span><span class=\"value\">DIN Forsyning Overskudsvarme/Køl A/S</span></section>\n               <section><span class=\"label\">Organisation, der sikrer adgang til udbudsdokumenterne offline</span><span class=\"text\">: </span><span class=\"value\">DIN Forsyning Overskudsvarme/Køl A/S</span></section>\n               <section><span class=\"label\">Organisation, der leverer yderligere oplysninger om klageprocedurerne</span><span class=\"text\">: </span><span class=\"value\">Konkurrence- og Forbrugerstyrelsen</span></section>\n               <section><span class=\"label\">TED eSender</span><span class=\"text\">: </span><span class=\"value\">Mercell Holding ASA</span></section>\n            </section>\n         </section>\n      </section>\n      <section>6&nbsp;<span class=\"label\">Resultater</span><section>6.1&nbsp;<span class=\"label\">Resultat delkontrakt-ID</span><span class=\"text\">: </span><span class=\"value\">LOT-0000</span><section><span class=\"dynamic-label\">Der er ikke udvalgt en vinder, og konkurrencen er afsluttet.</span></section>\n            <section><span class=\"label\">Begrundelsen for ikke at udvælge en vinder</span><span class=\"text\">: </span><span class=\"dynamic-label\">Alle tilbud, ansøgninger om deltagelse eller projekter blev trukket tilbage eller eller ikke fundet antagelige</span></section>\n            <section>6.1.4&nbsp;<span class=\"label\">Statistiske oplysninger</span><section><span class=\"label\">Modtagne tilbud og ansøgninger om deltagelse</span><span class=\"text\">:</span><section><span class=\"label\">Type modtagne indgivelser</span><span class=\"text\">: </span><span class=\"dynamic-label\">Ansøgning om deltagelse</span><section><span class=\"label\">Antal modtagne tilbud og ansøgninger om deltagelse</span><span class=\"text\">: </span><span class=\"value\">1</span></section>\n                  </section>\n               </section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisationer</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">DIN Forsyning Overskudsvarme/Køl A/S</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">43898396</span></section>\n            <section><span class=\"label\">Afdeling</span><span class=\"text\">: </span><span class=\"value\">Indkøbsafdelingen</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Ulvsundvej 1</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Esbjerg N</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">6715</span></section>\n            <section><span class=\"label\">Landespecifik underafdeling (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Kontaktpunkt</span><span class=\"text\">: </span><span class=\"value\">Line Sørensen</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">ls@energylegalpartners.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 51586066</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://dinforsyning.dk</span></section>\n            <section><span class=\"label\">Køberprofil</span><span class=\"text\">: </span><span class=\"value\">https://eu.eu-supply.com/ctm/company/companyinformation/index/269437</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Køber</span></section>\n               <section><span class=\"label\">Organisation, der leverer supplerende oplysninger om udbudsproceduren</span></section>\n               <section><span class=\"label\">Organisation, der sikrer adgang til udbudsdokumenterne offline</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0002</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for Udbud</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Landespecifik underafdeling (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vestjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK041</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">klfu@naevneneshus.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 72405600</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://naevneneshus.dk/start-din-klage/klagenaevnet-for-udbud/</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation med ansvar for klager</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0003</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Konkurrence- og Forbrugerstyrelsen</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">10294818</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Carl Jacobsens Vej 35</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Valby</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2500</span></section>\n            <section><span class=\"label\">Landespecifik underafdeling (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Københavns omegn</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK012</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">kfst@kfst.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 41715000</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://kfst.dk</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation, der leverer yderligere oplysninger om klageprocedurerne</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0004</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Mercell Holding ASA</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">980921565</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Askekroken 11</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Oslo</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">0277</span></section>\n            <section><span class=\"label\">Landespecifik underafdeling (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Oslo</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">NO081</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Norge</span></section>\n            <section><span class=\"label\">Kontaktpunkt</span><span class=\"text\">: </span><span class=\"value\">eSender</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">publication@mercell.com</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+47 21018800</span></section>\n            <section><span class=\"label\">Fax</span><span class=\"text\">: </span><span class=\"value\">+47 21018801</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">http://mercell.com/</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n      </section>\n      <section>11&nbsp;<span class=\"label\">Oplysninger om bekendtgørelsen</span><section>11.1&nbsp;<span class=\"label\">Oplysninger om bekendtgørelsen</span><section><span class=\"label\">Identifikator for bekendtgørelsen</span><span class=\"text\">: </span><span class=\"value\">e8161bb8-4f08-49b0-a2a8-d842b4b30e2a</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n            <section><span class=\"label\">Formulartype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Resultater</span></section>\n            <section><span class=\"label\">Bekendtgørelsestype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bekendtgørelse om indgåede kontrakter eller koncessionstildeling – standardordningen</span></section>\n            <section><span class=\"label\">Afsendelsesdato for bekendtgørelsen</span><span class=\"text\">: </span><span class=\"value\">25-03-2025</span><span class=\"text\"> </span><span class=\"value\">09:49 +00:00</span></section>\n            <section><span class=\"label\">Dato for afsendelse af bekendtgørelse (eSender)</span><span class=\"text\">: </span><span class=\"value\">25-03-2025</span><span class=\"text\"> </span><span class=\"value\">11:58 +00:00</span></section>\n            <section><span class=\"label\">Sprog, som denne bekendtgørelse er officielt tilgængelig på</span><span class=\"text\">: </span><span class=\"dynamic-label\">engelsk</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         </section>\n         <section>11.2&nbsp;<span class=\"label\">Oplysninger om offentliggørelsen</span><section><span class=\"label\">Bekendtgørelsesnummer</span><span class=\"text\">: </span><span class=\"value\">00194846-2025</span></section>\n            <section><span class=\"label\">EUT-S-nummer</span><span class=\"text\">: </span><span class=\"value\">60/2025</span></section>\n            <section><span class=\"label\">Offentliggørelsesdato</span><span class=\"text\">: </span><span class=\"value\">26-03-2025</span></section>\n         </section>\n      </section>\n   </body>\n</html>","htmlEN":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Buyer</span><section>1.1&nbsp;<span class=\"label\">Buyer</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">DIN Forsyning Overskudsvarme/Køl A/S</span></section>\n            <section><span class=\"label\">Legal type of the buyer</span><span class=\"text\">: </span><span class=\"dynamic-label\">Body governed by public law</span></section>\n            <section><span class=\"label\">Activity of the contracting authority</span><span class=\"text\">: </span><span class=\"dynamic-label\">General public services</span></section>\n            <section><span class=\"label\">Activity of the contracting entity</span><span class=\"text\">: </span><span class=\"dynamic-label\">Water-related activities</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Excess heating/cooling in Esbjerg</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">The City of Esbjerg is at the forefront of the green transition in Denmark. This project\n                  has been undertaken by DIN Forsyning with the purpose of securing a circular and sector\n                  coupled approach to the undergoing PtX development locally in the City of Esbjerg.\n                  Efficient cooling is a necessity for PtX and DIN Forsyning intends to ensure that\n                  as much excess heat from PtX production as possible, finds its way to reutilization\n                  as district heating, supplied to homes and industry in the City of Esbjerg. DIN Forsyning\n                  shall deliver a system capable of integrating excess heat from the PtX Facilities\n                  into the district heating system and/or cooling the excess heat effi-ciently from\n                  the facility that cannot be utilized in the district heating System. The Contract\n                  is for the delivery of a turnkey process cooling plant for rejection of the excess\n                  heat from two Power-to-X plants (PtX plants) located on two different sites in the\n                  Måde area of Esbjerg, as well as supplying these PtX-plants with cooling water at\n                  specified maximum cooling water temperature to the Contract-ing Entity (the “Project”).\n                  The Project is a further development and expansion of the Contracting Entity’s district\n                  heating portfolio. The Contract consist of a common infrastructure project as specified\n                  in Employer’s Technical Requirements tender conditions section 2.1 and 2.2. Besides\n                  the common infrastructure, the Contract consist of different options as further listed\n                  in tender conditions section 1.3. The two PtX-plants have slightly different time\n                  schedules and to handle this within the project, the process cooling systems of the\n                  Works are split up into two options (option 1 and 2) designated Velbæk and Måde. The\n                  excess heat from the PtX-plants to be handled are approx. 250 MW from option 1: Cooling\n                  plant 20 Sahara, and 600 MW from option 2: Cooling plant 21 Måde The expected start\n                  date for construction is 10 June 2026 and with a completion date of 1 March 2029.</span></section>\n            <section><span class=\"label\">Procedure identifier</span><span class=\"text\">: </span><span class=\"value\">b3ace001-5910-49f6-b9e4-6801d83b85f5</span></section>\n            <section><span class=\"label\">Previous notice</span><span class=\"text\">: </span><span class=\"value\">4f739fcb-d1e9-4824-b4c4-00d00e6143bd-01</span></section>\n            <section><span class=\"label\">Internal identifier</span><span class=\"text\">: </span><span class=\"value\">384820</span></section>\n            <section><span class=\"label\">Type of procedure</span><span class=\"text\">: </span><span class=\"dynamic-label\">Competitive dialogue</span></section>\n            <section><span class=\"label\">Main features of the procedure</span><span class=\"text\">: </span><span class=\"value\">The Contracting Entity will invite each of the prequalified Tenderers to dialogue\n                  meetings. Initially, the Contracting Entity has planned for three (3) rounds of dialogue\n                  meetings as well as the Tenderer to propose a solution description to form the basis\n                  for the last dialogue round. The purpose of each of the dialogue meetings are expected\n                  to be: First meeting to present the Contracting Entity’s current ideas for the solution\n                  and the Tenderer to provide feedback; to have a dialogue about the solution in separate\n                  breakout sessions in respective disciplines a. This could e.g. include cooling towers,\n                  legionella control, technical requirements in general, civil works including building\n                  design, limitations, electrical requirements, SCADA, contractual terms etc. to clarify\n                  any misunderstandings, concerns and/or uncertainties the Tenderer or the Contracting\n                  Entity might have Second meeting to have an in-depth dialogue about the Contracting\n                  Entity’s adapted material, including any opportunities for improvement or suggestions\n                  for changes to the material to have a dialogue about the solution in separate break\n                  outs in respective disciplines to clarify any misunderstandings, concerns and/or uncertainties\n                  the Tenderer or the Contracting Entity might have Third meeting to have a presentation\n                  and a dialogue about the Tenderers initial proposed solution and price breakout sessions\n                  for each discipline a review of the solution description, including any ambigui-ties\n                  for the Contracting Entity Next step in the process Prior to each meeting, the Tenderer\n                  will receive an invitation containing an agenda with specific topics for that meeting.\n                  At each meeting, the Contracting Entity reserves the right to request and determine\n                  which people with specific knowledge from the Tenderers that must participate in the\n                  meeting. The Contracting Entity reserves the right to call for additional rounds of\n                  dialogue meetings, if the Contracting Entity deems this relevant and necessary. When\n                  the Contracting Entity considers that the dialogue phase shall end, it will notify\n                  the Tenderers and call for Tenders based on the final tender documents submitted by\n                  the Contracting Entity. Therefore, all three (3) meetings will not necessarily be\n                  held. The Tenderer should note that the tender documents form the Contracting Entity’s\n                  proposal for dialogue during the dialogue process and does not constitute the final\n                  material with the final requirements. Requirements are dialogue requirements that\n                  the Contracting Entity has in principle decided on, but the Tenderers may as part\n                  of the dialogue meetings propose the requirements to be adjusted in accordance with\n                  Tender conditions section 9.3. When submitting a Tender, the requirements will no\n                  longer be understood as dialogue requirements, and if a Tenderer has reservations\n                  about a requirement in its Tender, this will be handled in accordance with tender\n                  conditions section 8.9.</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Works</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251150</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work for cooling towers</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">09323000</span><span class=\"text\"> </span><span class=\"dynamic-label\">District heating</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31140000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Cooling towers</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">34931000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Harbour equipment</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">39715210</span><span class=\"text\"> </span><span class=\"dynamic-label\">Central-heating equipment</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">42131320</span><span class=\"text\"> </span><span class=\"dynamic-label\">Choke manifolds</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">44161700</span><span class=\"text\"> </span><span class=\"dynamic-label\">Pipeline pigs</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45111291</span><span class=\"text\"> </span><span class=\"dynamic-label\">Site-development work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45213250</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work for industrial buildings</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45223000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Structures construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45231110</span><span class=\"text\"> </span><span class=\"dynamic-label\">Pipelaying construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45231300</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work for water and sewage pipelines</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45232140</span><span class=\"text\"> </span><span class=\"dynamic-label\">District-heating mains construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45244100</span><span class=\"text\"> </span><span class=\"dynamic-label\">Marine installations</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction works for power plants and heating plants</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251140</span><span class=\"text\"> </span><span class=\"dynamic-label\">Thermal power plant construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251200</span><span class=\"text\"> </span><span class=\"dynamic-label\">Heating plant construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251250</span><span class=\"text\"> </span><span class=\"dynamic-label\">District-heating plant construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45300000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Building installation work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45331000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Heating, ventilation and air-conditioning installation work</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Esbjerg</span></section>\n               <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            </section>\n            <section>2.1.3&nbsp;<span class=\"label\">Value</span><section><span class=\"label\">Estimated value excluding VAT</span><span class=\"text\">: </span><span class=\"value\">1.000.000.000</span><span class=\"text\"> </span><span class=\"label\">Danish krone</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Call for competition is terminated</span></section>\n               <section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\">Information on the value of the tendered contract is based on DIN Forsyning Overskudsvarme/Køl\n                     A/S' estimated estimate including options and any extra work. The application must\n                     consist of the European Single Procurement Document (ESPD), in which the requested\n                     information must be provided. The ESPD is a self-declaration form which serves as\n                     initial documentation that the Applicant, Supporting Entities or the Consortium meets\n                     the criteria for exclusion, suitability and selection. This information must subsequently\n                     be verified. If you intend to participate in the Tender Procedure as a member of a\n                     Consortium, a separate eESPD must be submitted for each member of the Consortium.\n                     If you intend to participate in the Tender Procedure with any Supporting Entity, a\n                     separate eESPD must be submitted for each Supporting Entity. Any eESPD from any Supporting\n                     Entity must be signed. The Contracting Entity reserves the right to obtain missing\n                     signatures after the Prequalification Deadline but prior to Prequalification The Applicant\n                     may rely on one or more Supporting Entities for the purpose of being prequalified\n                     and for executing the Contract. If the Applicant relies on any Supporting Entity,\n                     the Contracting Entity encourages the Applicant to submit a Declaration of Support\n                     from each such Supporting Entity together with the Application and to use the template\n                     made available in Annex C - Declaration of Support. Any Declaration of Support must\n                     be submitted at the latest when submitting the final ESPD documentation. If the Applicant\n                     relies on a Supporting Entity’s economic and financial capacity, the Supporting Entity\n                     will be requested a Declaration of Support to undertake that it will act as a guarantor\n                     for the Applicant to the benefit of the Contracting Entity if the Applicant is awarded\n                     the Contract The Applicant must confirm that the Applicant is not covered by the mandatory\n                     exclusion grounds stated in section 135(1)-(3) and Section 136 of the Danish Pro-curement\n                     Act. Otherwise, the Contracting Entity is obliged to exclude the Applicant. The Applicant\n                     must further confirm that the Applicant is not covered by the optional exclusion grounds\n                     at stated section 137(1) no. 1-5 of the Danish Procurement Act. Please submit you\n                     answer to the exclusion grounds mentioned. An Applicant is not excluded if the Applicant\n                     can provide sufficient documentation that the Applicant is reliable according to section\n                     138 (self-cleaning) of the Danish Procurement Act If the Application is submitted\n                     by a group of undertakings (e.g., a Consortium), the Applicant is encouraged to sign\n                     the Consortium Declaration in the form of Annex B - Consortium Declaration and to\n                     submit it together with the Application. If the Applicant is a consortium; a) the\n                     members of the Consortium shall be jointly and severally liable to the Contracting\n                     Entity for the performance of the Consortiums’ obligations under of the Contract;\n                     and b) neither the members nor (if known) the scope and parts of the Contract to be\n                     carried out by each member nor the legal status of the Consortium shall be altered\n                     without the prior consent of the Contracting Entity. DIN Forsyning Overskudsvarme/køl\n                     A/S reserves the right to request an applicant/tenderer to provide documentation for\n                     the information at any stage of the tender process if this is necessary to ensure\n                     that the procedure is carried out correctly. For Danish tenderers, documentation may,\n                     for example, consist of a serial certificate issued by the Danish Business Authority.\n                     Due to Council Regulation (EU) 2022/576 of 8 April 2022 amending Regulation (EU) No\n                     833/2014 concerning restrictive measures in view of Russia’s actions destabilizing\n                     the situation in Ukraine, the Contracting Entity can and will not award the Contract\n                     to a tenderer with certain relations to Russia. The prohibited relations to Russia\n                     are further outlined in Annex D - Declaration regarding relations to Russia. Therefore,\n                     the Applicant is encouraged to sign the Declaration regarding relations to Russia\n                     in the form of Annex D - Declaration regarding relations to Russia and to submit it\n                     together with the Application. Before the Contract is awarded, the Contracting Entity\n                     will require that the tenderer who has submitted the most economically advantageous\n                     tender based on the criteria set out in the Tender Procedure declares that the tenderer\n                     does not have relations to Russia that are prohibited according to Council Regulation\n                     (EU) 2022/576. The tender is not divided into successive phases and DIN Forsyning\n                     Overskudsvarme/Køl A/S does not intend to shortlist the number of tenderers during\n                     the dialog process.</span></section>\n               <section><span class=\"label\">Legal basis</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Directive 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>5&nbsp;<span class=\"label\">Lot</span><section>5.1&nbsp;<span class=\"label\">Lot technical ID</span><span class=\"text\">: </span><span class=\"value\">LOT-0000</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Excess heating/cooling in Esbjerg</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">The City of Esbjerg is at the forefront of the green transition in Denmark. This project\n                  has been undertaken by DIN Forsyning with the purpose of securing a circular and sector\n                  coupled approach to the undergoing PtX development locally in the City of Esbjerg.\n                  Efficient cooling is a necessity for PtX and DIN Forsyning intends to ensure that\n                  as much excess heat from PtX production as possible, finds its way to reutilization\n                  as district heating, supplied to homes and industry in the City of Esbjerg. DIN Forsyning\n                  shall deliver a system capable of integrating excess heat from the PtX Facilities\n                  into the district heating system and/or cooling the excess heat effi-ciently from\n                  the facility that cannot be utilized in the district heating System. The Contract\n                  is for the delivery of a turnkey process cooling plant for rejection of the excess\n                  heat from two Power-to-X plants (PtX plants) located on two different sites in the\n                  Måde area of Esbjerg, as well as supplying these PtX-plants with cooling water at\n                  specified maximum cooling water temperature to the Contract-ing Entity (the “Project”).\n                  The Project is a further development and expansion of the Contracting Entity’s district\n                  heating portfolio. The Contract consist of a common infrastructure project as specified\n                  in Employer’s Technical Requirements tender conditions section 2.1 and 2.2. Besides\n                  the common infrastructure, the Contract consist of different options as further listed\n                  in tender conditions section 1.3. The two PtX-plants have slightly different time\n                  schedules and to handle this within the project, the process cooling systems of the\n                  Works are split up into two options (option 1 and 2) designated Velbæk and Måde. The\n                  excess heat from the PtX-plants to be handled are approx. 250 MW from option 1: Cooling\n                  plant 20 Sahara, and 600 MW from option 2: Cooling plant 21 Måde The expected start\n                  date for construction is 10 June 2026 and with a completion date of 1 March 2029.</span></section>\n            <section><span class=\"label\">Internal identifier</span><span class=\"text\">: </span><span class=\"value\">384820</span></section>\n            <section>5.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Works</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251150</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work for cooling towers</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">09323000</span><span class=\"text\"> </span><span class=\"dynamic-label\">District heating</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31140000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Cooling towers</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">34931000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Harbour equipment</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">39715210</span><span class=\"text\"> </span><span class=\"dynamic-label\">Central-heating equipment</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">42131320</span><span class=\"text\"> </span><span class=\"dynamic-label\">Choke manifolds</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">44161700</span><span class=\"text\"> </span><span class=\"dynamic-label\">Pipeline pigs</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45111291</span><span class=\"text\"> </span><span class=\"dynamic-label\">Site-development work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45213250</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work for industrial buildings</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45223000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Structures construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45231110</span><span class=\"text\"> </span><span class=\"dynamic-label\">Pipelaying construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45231300</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work for water and sewage pipelines</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45232140</span><span class=\"text\"> </span><span class=\"dynamic-label\">District-heating mains construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45244100</span><span class=\"text\"> </span><span class=\"dynamic-label\">Marine installations</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction works for power plants and heating plants</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251140</span><span class=\"text\"> </span><span class=\"dynamic-label\">Thermal power plant construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251200</span><span class=\"text\"> </span><span class=\"dynamic-label\">Heating plant construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45251250</span><span class=\"text\"> </span><span class=\"dynamic-label\">District-heating plant construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45300000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Building installation work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45331000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Heating, ventilation and air-conditioning installation work</span></section>\n               <section><span class=\"label\">Options</span><span class=\"text\">:</span><section><span class=\"label\">Description of the options</span><span class=\"text\">: </span><span class=\"value\">Option 1: Cooling plant 20 Sahara The Contracting Entity requests an option for a\n                        cooling plant to Sahara. The requirements for Option 1: Cooling plant 20 Sahara are\n                        described in more detail in the Contract document ‘Employer’s Technical Requirements’\n                        section 2.1 and 2.3. Option 2: Cooling plant 21 Måde The Contracting Entity requests\n                        an option for a cooling plant to Måde. The requirements for Option 2: Cooling plant\n                        21 Måde are described in more detail in the Contract document ‘Employer’s Technical\n                        Requirements’ section 2.1 and 2.4. Option 3: Seawater intake 20C The Contracting Entity\n                        requests an option for seawater intake. The requirements for Option 3: Seawater intake\n                        is described in more detail in the Contract document ‘Employer’s Technical Requirements’\n                        section 2.1 and 2.5. Option 4: Extended DNP The Contracting Entity requests an option\n                        for an extension of the general DNP from two (2) years to five (5) years. This is\n                        further described in the Contract document ‘B.00C Particular Conditions – Part A Contract\n                        Data’ under Sub-Clause 1.1.27.</span></section>\n               </section>\n            </section>\n            <section>5.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Esbjerg</span></section>\n               <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n               <section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\"></span></section>\n            </section>\n            <section>5.1.3&nbsp;<span class=\"label\">Estimated duration</span><section><span class=\"label\">Other duration</span><span class=\"text\">: </span><span class=\"dynamic-label\">Unknown</span></section>\n            </section>\n            <section>5.1.4&nbsp;<span class=\"label\">Renewal</span><section><span class=\"label\">Maximum renewals</span><span class=\"text\">: </span><span class=\"value\">0</span></section>\n            </section>\n            <section>5.1.5&nbsp;<span class=\"label\">Value</span><section><span class=\"label\">Estimated value excluding VAT</span><span class=\"text\">: </span><span class=\"value\">1.000.000.000</span><span class=\"text\"> </span><span class=\"label\">Danish krone</span></section>\n            </section>\n            <section>5.1.6&nbsp;<span class=\"label\">General information</span><section><span class=\"dynamic-label\">Procurement Project not financed with EU Funds.</span></section>\n               <section><span class=\"label\">The procurement is covered by the Government Procurement Agreement (GPA)</span><span class=\"text\">: </span><span class=\"label\">yes</span></section>\n               <section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\">Information on the value of the tendered contract is based on DIN Forsyning Overskudsvarme/Køl\n                     A/S' estimated estimate including options and any extra work. The application must\n                     consist of the European Single Procurement Document (ESPD), in which the requested\n                     information must be provided. The ESPD is a self-declaration form which serves as\n                     initial documentation that the Applicant, Supporting Entities or the Consortium meets\n                     the criteria for exclusion, suitability and selection. This information must subsequently\n                     be verified. If you intend to participate in the Tender Procedure as a member of a\n                     Consortium, a separate eESPD must be submitted for each member of the Consortium.\n                     If you intend to participate in the Tender Procedure with any Supporting Entity, a\n                     separate eESPD must be submitted for each Supporting Entity. Any eESPD from any Supporting\n                     Entity must be signed. The Contracting Entity reserves the right to obtain missing\n                     signatures after the Prequalification Deadline but prior to Prequalification The Applicant\n                     may rely on one or more Supporting Entities for the purpose of being prequalified\n                     and for executing the Contract. If the Applicant relies on any Supporting Entity,\n                     the Contracting Entity encourages the Applicant to submit a Declaration of Support\n                     from each such Supporting Entity together with the Application and to use the template\n                     made available in Annex C - Declaration of Support. Any Declaration of Support must\n                     be submitted at the latest when submitting the final ESPD documentation. If the Applicant\n                     relies on a Supporting Entity’s economic and financial capacity, the Supporting Entity\n                     will be requested a Declaration of Support to undertake that it will act as a guarantor\n                     for the Applicant to the benefit of the Contracting Entity if the Applicant is awarded\n                     the Contract The Applicant must confirm that the Applicant is not covered by the mandatory\n                     exclusion grounds stated in section 135(1)-(3) and Section 136 of the Danish Pro-curement\n                     Act. Otherwise, the Contracting Entity is obliged to exclude the Applicant. The Applicant\n                     must further confirm that the Applicant is not covered by the optional exclusion grounds\n                     at stated section 137(1) no. 1-5 of the Danish Procurement Act. Please submit you\n                     answer to the exclusion grounds mentioned. An Applicant is not excluded if the Applicant\n                     can provide sufficient documentation that the Applicant is reliable according to section\n                     138 (self-cleaning) of the Danish Procurement Act If the Application is submitted\n                     by a group of undertakings (e.g., a Consortium), the Applicant is encouraged to sign\n                     the Consortium Declaration in the form of Annex B - Consortium Declaration and to\n                     submit it together with the Application. If the Applicant is a consortium; a) the\n                     members of the Consortium shall be jointly and severally liable to the Contracting\n                     Entity for the performance of the Consortiums’ obligations under of the Contract;\n                     and b) neither the members nor (if known) the scope and parts of the Contract to be\n                     carried out by each member nor the legal status of the Consortium shall be altered\n                     without the prior consent of the Contracting Entity. DIN Forsyning Overskudsvarme/køl\n                     A/S reserves the right to request an applicant/tenderer to provide documentation for\n                     the information at any stage of the tender process if this is necessary to ensure\n                     that the procedure is carried out correctly. For Danish tenderers, documentation may,\n                     for example, consist of a serial certificate issued by the Danish Business Authority.\n                     Due to Council Regulation (EU) 2022/576 of 8 April 2022 amending Regulation (EU) No\n                     833/2014 concerning restrictive measures in view of Russia’s actions destabilizing\n                     the situation in Ukraine, the Contracting Entity can and will not award the Contract\n                     to a tenderer with certain relations to Russia. The prohibited relations to Russia\n                     are further outlined in Annex D - Declaration regarding relations to Russia. Therefore,\n                     the Applicant is encouraged to sign the Declaration regarding relations to Russia\n                     in the form of Annex D - Declaration regarding relations to Russia and to submit it\n                     together with the Application. Before the Contract is awarded, the Contracting Entity\n                     will require that the tenderer who has submitted the most economically advantageous\n                     tender based on the criteria set out in the Tender Procedure declares that the tenderer\n                     does not have relations to Russia that are prohibited according to Council Regulation\n                     (EU) 2022/576. The tender is not divided into successive phases and DIN Forsyning\n                     Overskudsvarme/Køl A/S does not intend to shortlist the number of tenderers during\n                     the dialog process.</span></section>\n            </section>\n            <section>5.1.10&nbsp;<span class=\"label\">Award criteria</span><section><span class=\"label\">Criterion</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Price</span></section>\n                  <section><span class=\"label\">Name</span><span class=\"text\">: </span><span class=\"value\">Evaluated price</span></section>\n                  <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">The Evaluated Price consists of the following amounts: (a) the Total Contract Price\n                        which includes the following; a. Price of the works b. Price of the listed options\n                        c. Price of evaluated guaranteed performance/consumption parameters d. Schedule of\n                        rates &amp; materials (b) and the converted monetary value of reservations to the Schedule\n                        of Payment and payments terms under the Contract Data. The Tenderer shall with its\n                        Tender submit rates and prices in the form provided in Annex F (Schedule of Rates)\n                        and the Contracting Entity will base its evaluation on the amount set out in Annex\n                        F. Note: When calculating the total evaluation price, the price of the works is corrected\n                        with additions or deductions for the performance of the solution in ques-tion. This\n                        means that the total evaluation price is only used for the evaluation and is therefore\n                        not an expression of the actual contract sum. Note: If the Tenderer does not complete\n                        all requested input for the Evaluated Price, the Contracting Entity will complete\n                        the missing input in Annex F – Schedule of Rates and Prices with the highest bid received\n                        from a Tenderer for the rel-evant input plus 20%. If an item in Annex F is deliberately\n                        priced at DKK 0, the Tenderer is asked to state this in order to avoid pricing of\n                        the relevant input plus 20%.</span></section>\n                  <section><span class=\"dynamic-label\">Weight (percentage, exact)</span><span class=\"text\">: </span><span class=\"value\">30</span></section>\n               </section>\n               <section><span class=\"label\">Criterion</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Quality</span></section>\n                  <section><span class=\"label\">Name</span><span class=\"text\">: </span><span class=\"value\">Quality</span></section>\n                  <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Apart from Evaluated Price the evaluation consists of the sub-criterion Quality. The\n                        sub-criterion Quality consist of the following sub-sub-criteria; 1) Technical solution\n                        2) Project solution; Process- and time schedule, Organizations, culture and competences\n                        3) Contractual terms Evaluation of Technical solution In the assessment of the sub-criterion,\n                        the Contracting Entity will regard the following as positive; a) That the Tenderer's\n                        proposal is suitable to support the Project's success criteria and at the same time\n                        demonstrates an understanding of the outline proposal's choice and functional requirements.\n                        b) That the Tenderer's commissioning plan demonstrates knowledge and understanding\n                        of the commissioning requirements set out in the Contract and is suitable for ensuring\n                        that the facility will immediately meet the agreed requirements and be fully functional\n                        after delivery and commissioning. c) That the description and evaluation of the collaboration\n                        demonstrates knowledge and understanding of engage in an integrated collaboration\n                        as described in the cooperation agreement, including i. in particular utilization\n                        of the competencies of the key persons involved, ii. how sustainability can enrich\n                        the decisions in the early phases of the design as concretely as possible, iii. how\n                        the Tenderer's knowledge of process, constructability and economy can enrich decisions\n                        in the early phases of the project, and iv. whether the evaluation contains concrete\n                        suggestions for improving the collaboration between the Tenderer and the Contracting\n                        Entity Evaluation of Project solution; Process- and Time schedule, Organization, culture\n                        and competences 7.3.2 In the assessment of the sub-criterion, the Contracting Entity\n                        will regard the follow positive; a. A process- and time schedule showing a detailed\n                        program and test, which appears responsible and well described. Furthermore, a plan\n                        that supports the fastest possible delivery and supports a high degree of quality\n                        management during the delivery and test phases. b. An organizational plan showing\n                        a robust organization with clear and logical competencies and responsibilities, which\n                        through the phases supports the collaboration model and the Contracting Entity’s organization\n                        as described in the Contract, including Collaboration Agreement. i. The more detailed,\n                        project specific (and relevant), coherent, and designed for continuous implementation\n                        the management and les-sons learned procedures are, the better. It is also considered\n                        posi-tive if the proposal includes examples from previous projects and how this is\n                        applied to this project. c. That the key personnel offered have as specific and relevant\n                        education, experience and skills as possible in relation to their role in the organization,\n                        and that these are utilized in the organization, including through the assumed allocation\n                        to the Project. The Contracting Entity will pay particular attention to the key persons\n                        performing the following roles and tasks: i. The Tenderer's project managers (primary\n                        contact persons for the Contracting Entity) ii. The Tenderer's engineering design,\n                        including in particular regarding seawater and cooling tower systems and handling\n                        of biological fouling and legionella. iii. Overall responsibility for design carried\n                        out by the Tenderer or its subcontractors/suppliers iv. The Tenderer's construction\n                        management d. That the description of the collaboration between the Contracting Entity\n                        and the Tenderer in both the design and execution phases shows an understanding of\n                        and provides concrete proposals for solving the challenges and opportunities presented\n                        by the form of collaboration offered, including in particular: i. how the right skills,\n                        including from the Tenderer's key subcontractors and suppliers, are involved at the\n                        right time - without unnecessarily complicating or delaying the processes, - how,\n                        in the period from the Contracting Entity approval of the project proposal to de-livery,\n                        it is ensured that the intentions of the outline proposal and project proposal realized,\n                        including in particular how the Contracting Entity and the Tenderer are ensured real\n                        influence on how the Tenderer works with the project's finances without this leading\n                        to unclear roles and responsibilities, and; ii. how the Tenderer will, towards the\n                        milestones work together to ensure that the delivered material appears coordinated\n                        and coherent, without leading to unclear roles and responsibilities The Contracting\n                        Entity will make an overall evaluation under this sub-sub-criterion. Evaluation of\n                        Contractual Terms The documents listed below (the “Draft Contract Documents”) will\n                        be included in the evaluation of “Contractual Terms”: B.00A Contract Agreement B.00B\n                        General Conditions of Contract (FIDIC Conditions of Contract for Plant and Design-Build)\n                        B.00C Particular Conditions, Part A - Contract Data B.00D Particular Conditions, Part\n                        B – Special provisions B.03 Schedule 3 - Parent Company Guarantee B.04 Schedule 4\n                        - Performance Security B.05 Schedule 5 - Advance Payment Guarantee B.07 Schedule 7\n                        – Schedule of Rates and Prices B.08 Schedule 8 – Collaboration Agreement If the Tender\n                        includes proposed changes: - to any other contract documents than listed above as\n                        a Draft Contract Document; - to the payment terms under the Contract; or - to any\n                        clauses listed in Section 7.4.3 such proposed changes will not be subject to evaluation\n                        under Contractual Terms</span></section>\n                  <section><span class=\"dynamic-label\">Weight (percentage, exact)</span><span class=\"text\">: </span><span class=\"value\">70</span></section>\n               </section>\n            </section>\n            <section>5.1.12&nbsp;<span class=\"label\">Terms of procurement</span><section><span class=\"label\">Information about review deadlines</span><span class=\"text\">: </span><span class=\"value\">Klagevejledning: https://naevneneshus.dk/start-din-klage/klagenaevnet-for-udbud/vejledning/\n                     Nævnets klagefrister: Ved et udbud med prækvalifikation efter udbudsloven, ved forsyningsvirksomhedsdirektivet\n                     eller tilbudsloven skal en klage over ikke at være blevet prækvalificeret indgives\n                     inden for 20 kalenderdage. Dette er regnet fra dagen efter ordregivers afsendelse\n                     af underretning om prækvalifikation. Andre klager over udbud eller beslutninger, f.eks.\n                     tildeling af kontrakter, omfattet af udbudslovens afsnit II eller III eller forsyningsvirksomhedsdirektivet\n                     skal indgives 45 kalenderdage regnet fra dagen efter ordregiverens offentliggørelse\n                     af en bekendtgørelse i EU-Tidende om indgåelse af kontrakt. Hvis klagen handler om\n                     overtrædelser af tilbudsloven eller udbudslovens §§ 191 og 192, er klagefristen på\n                     45 kalenderdage regnet fra dagen efter ordregiverens underretning om tildelingsbeslutningen.\n                     Klager over indgåelse af rammeaftale efter udbudsloven (afsnit II, III og §§ 191 og\n                     192), forsyningsvirksomhedsdirektivet eller tilbudsloven skal være indgivet til klagenævnet\n                     inden 6 måneder regnet fra dagen efter ordregiverens underretning om tildelingsbeslutningen.\n                     Klager over indgåelse af en kontrakt baseret på en rammeaftale med genåbning af konkurrence\n                     eller et dynamisk indkøbssystem omfattet af udbudslovens afsnit II eller III eller\n                     forsyningsvirksomhedsdirektivet skal være indgivet til klagenævnet inden 30 kalenderdage\n                     regnet fra dagen efter ordregiverens underretning om tildelingsbeslutningen. Klager\n                     over en ordregivers beslutning om at videreføre en kontrakt (udbudslovens § 185, stk.\n                     2) skal indgives til klagenævnet inden 20 kalenderdage regnet fra dagen efter, at\n                     ordregiveren har offentliggjort sin beslutning (udbudslovens § 185, stk. 2, 3. pkt.).\n                     Har ordregiveren fulgt proceduren i lov om Klagenævnet for Udbud § 4, skal en klage\n                     over, at ordregiveren i strid med udbudsdirektivet eller forsyningsvirksomhedsdirektivet\n                     har indgået en kontrakt uden forudgående offentliggørelse af en udbudsbekendtgørelse\n                     indgives til klagenævnet inden 30 kalenderdage regnet fra dagen efter ordregiverens\n                     offentliggørelse af en bekendtgørelse i EU-Tidende om indgåelse af kontrakt. Reglerne\n                     om klagefrister findes i § 7 i lov om Klagenævnet for Udbud.</span></section>\n            </section>\n            <section>5.1.15&nbsp;<span class=\"label\">Techniques</span><section><span class=\"label\">Framework agreement</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No framework agreement</span></section>\n               </section>\n               <section><span class=\"label\">Information about the dynamic purchasing system</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No dynamic purchase system</span></section>\n               </section>\n            </section>\n            <section>5.1.16&nbsp;<span class=\"label\">Further information, mediation and review</span><section><span class=\"label\">Review organisation</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for Udbud</span></section>\n               <section><span class=\"label\">Organisation providing additional information about the procurement procedure</span><span class=\"text\">: </span><span class=\"value\">DIN Forsyning Overskudsvarme/Køl A/S</span></section>\n               <section><span class=\"label\">Organisation providing offline access to the procurement documents</span><span class=\"text\">: </span><span class=\"value\">DIN Forsyning Overskudsvarme/Køl A/S</span></section>\n               <section><span class=\"label\">Organisation providing more information on the review procedures</span><span class=\"text\">: </span><span class=\"value\">Konkurrence- og Forbrugerstyrelsen</span></section>\n               <section><span class=\"label\">TED eSender</span><span class=\"text\">: </span><span class=\"value\">Mercell Holding ASA</span></section>\n            </section>\n         </section>\n      </section>\n      <section>6&nbsp;<span class=\"label\">Results</span><section>6.1&nbsp;<span class=\"label\">Result lot ldentifier</span><span class=\"text\">: </span><span class=\"value\">LOT-0000</span><section><span class=\"dynamic-label\">No winner was chosen and the competition is closed.</span></section>\n            <section><span class=\"label\">The reason why a winner was not chosen</span><span class=\"text\">: </span><span class=\"dynamic-label\">All tenders, requests to participate or projects were withdrawn or found inadmissible</span></section>\n            <section>6.1.4&nbsp;<span class=\"label\">Statistical information</span><section><span class=\"label\">Received tenders or requests to participate</span><span class=\"text\">:</span><section><span class=\"label\">Type of received submissions</span><span class=\"text\">: </span><span class=\"dynamic-label\">Requests to participate</span><section><span class=\"label\">Number of tenders or requests to participate received</span><span class=\"text\">: </span><span class=\"value\">1</span></section>\n                  </section>\n               </section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisations</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">DIN Forsyning Overskudsvarme/Køl A/S</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">43898396</span></section>\n            <section><span class=\"label\">Department</span><span class=\"text\">: </span><span class=\"value\">Indkøbsafdelingen</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Ulvsundvej 1</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Esbjerg N</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">6715</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Contact point</span><span class=\"text\">: </span><span class=\"value\">Line Sørensen</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">ls@energylegalpartners.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 51586066</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://dinforsyning.dk</span></section>\n            <section><span class=\"label\">Buyer profile</span><span class=\"text\">: </span><span class=\"value\">https://eu.eu-supply.com/ctm/company/companyinformation/index/269437</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Buyer</span></section>\n               <section><span class=\"label\">Organisation providing additional information about the procurement procedure</span></section>\n               <section><span class=\"label\">Organisation providing offline access to the procurement documents</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0002</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for Udbud</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vestjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK041</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">klfu@naevneneshus.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 72405600</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://naevneneshus.dk/start-din-klage/klagenaevnet-for-udbud/</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Review organisation</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0003</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Konkurrence- og Forbrugerstyrelsen</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">10294818</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Carl Jacobsens Vej 35</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Valby</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2500</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Københavns omegn</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK012</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">kfst@kfst.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 41715000</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://kfst.dk</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Organisation providing more information on the review procedures</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0004</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Mercell Holding ASA</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">980921565</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Askekroken 11</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Oslo</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">0277</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Oslo</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">NO081</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Norway</span></section>\n            <section><span class=\"label\">Contact point</span><span class=\"text\">: </span><span class=\"value\">eSender</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">publication@mercell.com</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+47 21018800</span></section>\n            <section><span class=\"label\">Fax</span><span class=\"text\">: </span><span class=\"value\">+47 21018801</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">http://mercell.com/</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n      </section>\n      <section>11&nbsp;<span class=\"label\">Notice information</span><section>11.1&nbsp;<span class=\"label\">Notice information</span><section><span class=\"label\">Notice identifier/version</span><span class=\"text\">: </span><span class=\"value\">e8161bb8-4f08-49b0-a2a8-d842b4b30e2a</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n            <section><span class=\"label\">Form type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Result</span></section>\n            <section><span class=\"label\">Notice type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Contract or concession award notice – standard regime</span></section>\n            <section><span class=\"label\">Notice dispatch date</span><span class=\"text\">: </span><span class=\"value\">25-03-2025</span><span class=\"text\"> </span><span class=\"value\">09:49 +00:00</span></section>\n            <section><span class=\"label\">Notice dispatch date (eSender)</span><span class=\"text\">: </span><span class=\"value\">25-03-2025</span><span class=\"text\"> </span><span class=\"value\">11:58 +00:00</span></section>\n            <section><span class=\"label\">Languages in which this notice is officially available</span><span class=\"text\">: </span><span class=\"dynamic-label\">English</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         </section>\n         <section>11.2&nbsp;<span class=\"label\">Publication information</span><section><span class=\"label\">Notice publication number</span><span class=\"text\">: </span><span class=\"value\">00194846-2025</span></section>\n            <section><span class=\"label\">OJ S issue number</span><span class=\"text\">: </span><span class=\"value\">60/2025</span></section>\n            <section><span class=\"label\">Publication date</span><span class=\"text\">: </span><span class=\"value\">26-03-2025</span></section>\n         </section>\n      </section>\n   </body>\n</html>","opsummeringDA":{"card":{"titel":"Excess heating/cooling in Esbjerg","ordregiver":"DIN Forsyning Overskudsvarme/Køl A/S","ordregiverId":"43898396","ordregiverIdDatavasket":"43898396","publiceringsdato":"2025-03-26+01:00","cpvKode":"45251150","cpvTitel":"Bygge- og anlægsarbejde i forbindelse med køletårne","formulartype":"Resultater","formulartypeKode":"result","tidsfrister":[],"alleOrdregivere":["DIN Forsyning Overskudsvarme/Køl A/S"],"anslaaetVaerdi":"1000000000","anslaaetVaerdiValuta":"DKK","beskrivelse":"The City of Esbjerg is at the forefront of the green transition in Denmark. This project has been undertaken by DIN Forsyning with the purpose of securing a circular and sector coupled approach to the undergoing PtX development locally in the City of Esbjerg. Efficient cooling is a necessity for PtX and DIN Forsyning intends to ensure that as much excess heat from PtX production as possible, finds its way to reutilization as district heating, supplied to homes and industry in the City of Esbjerg. DIN Forsyning shall deliver a system capable of integrating excess heat from the PtX Facilities into the district heating system and/or cooling the excess heat effi-ciently from the facility that cannot be utilized in the district heating System. The Contract is for the delivery of a turnkey process cooling plant for rejection of the excess heat from two Power-to-X plants (PtX plants) located on two different sites in the Måde area of Esbjerg, as well as supplying these PtX-plants with cooling water at specified maximum cooling water temperature to the Contract-ing Entity (the “Project”). The Project is a further development and expansion of the Contracting Entity’s district heating portfolio. The Contract consist of a common infrastructure project as specified in Employer’s Technical Requirements tender conditions section 2.1 and 2.2. Besides the common infrastructure, the Contract consist of different options as further listed in tender conditions section 1.3. The two PtX-plants have slightly different time schedules and to handle this within the project, the process cooling systems of the Works are split up into two options (option 1 and 2) designated Velbæk and Måde. The excess heat from the PtX-plants to be handled are approx. 250 MW from option 1: Cooling plant 20 Sahara, and 600 MW from option 2: Cooling plant 21 Måde The expected start date for construction is 10 June 2026 and with a completion date of 1 March 2029.","bkSubTypeKode":"30","bkSubType":"Bekendtgørelse om indgåede kontrakter – sektordirektivet, standardordningen","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":["DK032"],"udforelsesstedSubLand":["Sydjylland"],"udforelsesstedLand":["Danmark"],"udforelsesstedBy":["Esbjerg"],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"antalParts":0,"antalLots":1,"udbudsDokumenter":[]},"opsummeringEN":{"card":{"titel":"Excess heating/cooling in Esbjerg","ordregiver":"DIN Forsyning Overskudsvarme/Køl A/S","ordregiverId":"43898396","ordregiverIdDatavasket":"43898396","publiceringsdato":"2025-03-26+01:00","cpvKode":"45251150","cpvTitel":"Construction work for cooling towers","formulartype":"Result","formulartypeKode":"result","tidsfrister":[],"alleOrdregivere":["DIN Forsyning Overskudsvarme/Køl A/S"],"anslaaetVaerdi":"1000000000","anslaaetVaerdiValuta":"DKK","beskrivelse":"The City of Esbjerg is at the forefront of the green transition in Denmark. This project has been undertaken by DIN Forsyning with the purpose of securing a circular and sector coupled approach to the undergoing PtX development locally in the City of Esbjerg. Efficient cooling is a necessity for PtX and DIN Forsyning intends to ensure that as much excess heat from PtX production as possible, finds its way to reutilization as district heating, supplied to homes and industry in the City of Esbjerg. DIN Forsyning shall deliver a system capable of integrating excess heat from the PtX Facilities into the district heating system and/or cooling the excess heat effi-ciently from the facility that cannot be utilized in the district heating System. The Contract is for the delivery of a turnkey process cooling plant for rejection of the excess heat from two Power-to-X plants (PtX plants) located on two different sites in the Måde area of Esbjerg, as well as supplying these PtX-plants with cooling water at specified maximum cooling water temperature to the Contract-ing Entity (the “Project”). The Project is a further development and expansion of the Contracting Entity’s district heating portfolio. The Contract consist of a common infrastructure project as specified in Employer’s Technical Requirements tender conditions section 2.1 and 2.2. Besides the common infrastructure, the Contract consist of different options as further listed in tender conditions section 1.3. The two PtX-plants have slightly different time schedules and to handle this within the project, the process cooling systems of the Works are split up into two options (option 1 and 2) designated Velbæk and Måde. The excess heat from the PtX-plants to be handled are approx. 250 MW from option 1: Cooling plant 20 Sahara, and 600 MW from option 2: Cooling plant 21 Måde The expected start date for construction is 10 June 2026 and with a completion date of 1 March 2029.","bkSubTypeKode":"30","bkSubType":"Contract award notice – sectoral directive, standard regime","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":["DK032"],"udforelsesstedSubLand":["Sydjylland"],"udforelsesstedLand":["Denmark"],"udforelsesstedBy":["Esbjerg"],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"antalParts":0,"antalLots":1,"udbudsDokumenter":[]}}