{"bekendtgoerelseNoegle":{"noticeId":{"value":"8a8d0d45-400b-4d58-add2-905cdcc49f19"},"noticeVersion":{"value":"01"},"noticePublicationNumber":{"value":"00764938-2025"}},"htmlDA":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Køber</span><section>1.1&nbsp;<span class=\"label\">Køber</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Danmarks Tekniske Universitet - DTU</span></section>\n            <section><span class=\"label\">Køberens retlige status</span><span class=\"text\">: </span><span class=\"dynamic-label\">Offentligretligt organ</span></section>\n            <section><span class=\"label\">Den kompetent myndigheds retlige status</span><span class=\"text\">: </span><span class=\"dynamic-label\">Offentligretligt organ</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Call for expression of interest regarding a possible expansion and adaptation of Test\n                  Centre Østerild for taller wind turbines</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the\n                  Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen)\n                  are currently preparing an environmental and habitat impact assessment for a potential\n                  expansion and adaptation of Test Centre Østerild, which will provide the opportunity\n                  to test prototype wind turbines up to 450 metres tall and testing of electrolysis\n                  plants in relation to the wind turbines. <br/>In this connection, DTU hereby invites\n                  relevant businesses to express their interest in owning or renting one or more of\n                  the potential new/adapted test sites at Test Centre Østerild. <br/></span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Varer</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121300</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindenergigeneratorer</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121340</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindmøllepark</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121330</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindturbinegeneratorer</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121320</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindturbiner</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121310</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindmøller</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nordjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK050</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nordjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK050</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\">The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the\n                     Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen)\n                     are currently preparing an environmental and habitat impact assessment for a potential\n                     expansion and adaptation of Test Centre Østerild, which will provide the opportunity\n                     to test prototype wind turbines up to 450 metres tall and testing of electrolysis\n                     plants in relation to the wind turbines. In this connection, DTU hereby invites relevant\n                     businesses to express their interest in owning or renting one or more of the potential\n                     new/adapted test sites at Test Centre Østerild. <br/>BACKGROUND AND TIME SCHEDULE:\n                     <br/>On 1 February 2024, a wide circle of Danish Parliament parties reached a political\n                     agreement to initiate an environmental and habitat impact assessment for an expansion\n                     of the Test Centre Østerild. The assessment includes the establishment of three new\n                     turbine sites with a maximum height of 450 metres and the adaptation of two existing\n                     sites for wind turbines of the same height. For more information about the project,\n                     see the Danish Agency for Planning and Rural Development call for ideas and proposals\n                     for the environmental and habitat impact assessment https://www.plst.dk/Media/638545659120791552/Ideopl%C3%A6g%20for%20store%20vindm%C3%B8ller%20ved%20%C3%98sterild%20(rettet%20juni%202024).pdf\n                     (available in Danish only). The environmental and habitat impact assessment is expected\n                     to be completed by mid-2026.<br/>It follows from the agreement that, in parallel with\n                     the environmental and habitat impact assessment, a market survey will be carried out\n                     to decide whether and to what extent the new sites should be offered to relevant operators\n                     as long-term rental or sale. <br/>According to the agreement, once the results of\n                     the environmental and habitat impact assessment and the market survey are available\n                     and presented to the parties to the agreement, a final decision can be made on the\n                     possible establishment of test sites and the final conditions in this regard. At the\n                     same time, the parties to the agreement must decide whether and to what extent test\n                     sites can be offered to wind turbine manufacturers as long-term rental or sale. <br/>If\n                     it is decided to adapt and expand Test Centre Østerild, a Construction Act bill is\n                     expected to be presented to the Danish Parliament in early 2027. DTU expects to be\n                     able to initiate a call for tenders for potential new/adapted test sites in early\n                     2027, see the section below on \"Subsequent call for tenders for rental/purchase of\n                     the test sites\". <br/>PURPOSE OF THE EXPRESSION OF INTEREST: <br/>The purpose of this\n                     call for expression of interest is to get an indication from the market on whether\n                     the market is interested in entering into contracts for purchase or rental of potential\n                     new test sites for wind turbines up to 450 metres tall at Test Centre Østerild. The\n                     purpose of the market survey is thus to identify interest in entering into long-term\n                     rental agreements or actual purchase contracts. In this connection, DTU also requests\n                     feedback on any other requests for the test sites. This applies in particular to the\n                     rental period and other rental terms, as well as to the process for the call for tenders\n                     for the test sites and planning of the expansion. The potential expansion and adaptation\n                     of Test Centre Østerild is expected to establish three new test sites and adapt two\n                     existing test sites, so that a total of five test sites will allow the installation\n                     of wind turbines up to 450 metres tall. The remaining seven test sites at Test Centre\n                     Østerild will not be changed in terms of the maximum height of the wind turbines that\n                     may be installed at the test centre and are not included in this call for expression\n                     of interest. <br/>FINANCIAL CONDITIONS AND OTHER TERMS: <br/>The construction costs\n                     for the potential new and adapted test sites are expected to be in the range of DKK\n                     150-200 million per test site. If it is decided to sell the test sites to manufacturers,\n                     the price of the test sites must cover this amount. In addition, businesses purchasing\n                     test sites are expected to be obliged to return the test sites to the Danish State\n                     after 30 years in the same condition as when they were acquired. This corresponds\n                     to the terms and conditions for the existing test sites at Test Centre Østerild that\n                     are currently owned by manufacturers.<br/>When renting test sites, the annual minimum\n                     rent is expected to be determined on the basis of the principle that the investments\n                     in the test sites can be depreciated over a period of at least approximately 10 years.\n                     The rental period is expected to be at least 8-15 years, and preferably longer if\n                     there is market interest. <br/>Test Centre Østerild's geographical location with good\n                     wind conditions and good test facilities enables the wind turbine industry, in cooperation\n                     with DTU and other research institutions, to conduct efficient research, development\n                     and testing of wind turbines and wind turbine technology. There will be requirements\n                     for wind turbine manufacturers in relation to scope and annual reporting of research\n                     and development activities and the extent of cooperation with universities.<br/>There\n                     are noise limits for wind turbines erected at Test Centre Østerild, and as a starting\n                     point, the noise emission limits for the individual wind turbines at the new sites\n                     are 120 dB(A) at 6 m/s and 122 dB(A) at 8 m/s as defined in the Danish Statutory Order\n                     on Noise from Wind Turbines (Statutory Order no. 995 of 26 August 2024).<br/>In connection\n                     with the installation of the wind turbines, a building permit must be obtained, and\n                     the electrolysis plants must obtain environmental and safety approval. The wind turbine\n                     manufacturer is responsible for providing the necessary documentation in order to\n                     obtain the required approvals. In this context, there will be restrictions on emissions.<br/>QUESTIONS\n                     TO BE ANSWERED IN THE EXPRESSION OF INTEREST: <br/>Interested businesses are encouraged\n                     to briefly express their interest in owning or renting one or more of the potential\n                     new/adapted test sites at Test Centre Østerild. <br/>DTU REQUESTS THE FOLLOWING INFORMATION:\n                     <br/>• The overall purpose of owning or renting test sites and any preference in terms\n                     of either owning or renting one or more of the new sites.<br/>• Information about\n                     the ownership structure of the interested business.<br/>• Desire to own new/adapted\n                     test sites. <br/>• The number of test sites the business is interested in purchasing\n                     and the probability (high/medium/low) of doing so. <br/>• Desire to rent new/adapted\n                     test sites. <br/>• Number and desired rental period and the probability for each site\n                     (high/medium/low) of the business renting one or more test sites. <br/>• Requests\n                     for the test sites, including any special facilities at the test centre.<br/>• Requests\n                     for the research cooperation framework with DTU and other research institutions for\n                     conducting research projects on the wind turbines installed by the owner/tenant. <br/>These\n                     questions must be answered in the form available on the DTU website: https://wind.dtu.dk/-/media/institutter/vindenergi_ny/nyheder/2025/form-for-expression-of-interest-131125.docx<br/>This\n                     call for expression of interest i furthermore available using the following link:\n                     https://wind.dtu.dk/news/news/expression-of-interest?id=0567cbc7-53e1-49ae-9c67-1c0f4af58215<br/>After\n                     the expression of interest has been submitted, businesses will be given the opportunity\n                     to attend a follow-up meeting with DTU to provide more detailed information about\n                     their requests. <br/>SUBSEQUENT CALL FOR TENDERS FOR THE RENTAL/PURCHASE OF THE TEST\n                     SITES:<br/>If it is decided to adapt and expand Test Centre Østerild, the parties\n                     behind the agreement will decide whether and to what extent test sites can be rented\n                     and/or sold to wind turbine manufacturers. If so, a Construction Act bill is expected\n                     to be presented to the Danish Parliament in early 2027 according to the current project\n                     schedule. Under the same conditions, DTU expects to be able to initiate the call for\n                     tenders for potential new/adapted test sites in early 2027. The specification of the\n                     criteria applied for the selection of tenderers and indication of minimum purchase\n                     price/rent etc. will be set out in the call for tenders, and other terms for the tenders\n                     will be stated in the tender documents as well.<br/>For further information about\n                     the test centre and test sites, please contact Peter Bagger Hjuler, Director of Development,\n                     DTU Wind and Energy Systems, tel.: +45 4045 5037. <br/>Expression of interest must\n                     be received by DTU no later than 15 December 2025 and may be sent either by letter\n                     to DTU Wind Energy, Frederiksborgvej 399, 4000 Roskilde, Att. Peter Bagger Hjuler,\n                     Director of Development or by e-mail to peje@dtu.dk. <br/>Please mark letters and\n                     e-mails \"Expression of interest regarding expansion of Test Centre Østerild\".</span></section>\n               <section><span class=\"label\">Retsgrundlag</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Anden</span></section>\n            </section>\n         </section>\n      </section>\n      <section>5&nbsp;<span class=\"label\">Delkontrakt</span><section>5.1&nbsp;<span class=\"label\">Teknisk ID for delkontrakten</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Call for expression of interest regarding a possible expansion and adaptation of Test\n                  Centre Østerild for taller wind turbines</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the\n                  Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen)\n                  are currently preparing an environmental and habitat impact assessment for a potential\n                  expansion and adaptation of Test Centre Østerild, which will provide the opportunity\n                  to test prototype wind turbines up to 450 metres tall and testing of electrolysis\n                  plants in relation to the wind turbines. In this connection, DTU hereby invites relevant\n                  businesses to express their interest in owning or renting one or more of the potential\n                  new/adapted test sites at Test Centre Østerild. <br/></span></section>\n            <section>5.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Varer</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121300</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindenergigeneratorer</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121340</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindmøllepark</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121330</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindturbinegeneratorer</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121320</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindturbiner</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121310</span><span class=\"text\"> </span><span class=\"dynamic-label\">Vindmøller</span></section>\n            </section>\n            <section>5.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nordjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK050</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n               <section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\"></span></section>\n            </section>\n            <section>5.1.6&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\">The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the\n                     Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen)\n                     are currently preparing an environmental and habitat impact assessment for a potential\n                     expansion and adaptation of Test Centre Østerild, which will provide the opportunity\n                     to test prototype wind turbines up to 450 metres tall and testing of electrolysis\n                     plants in relation to the wind turbines. In this connection, DTU hereby invites relevant\n                     businesses to express their interest in owning or renting one or more of the potential\n                     new/adapted test sites at Test Centre Østerild. <br/>BACKGROUND AND TIME SCHEDULE:\n                     <br/>On 1 February 2024, a wide circle of Danish Parliament parties reached a political\n                     agreement to initiate an environmental and habitat impact assessment for an expansion\n                     of the Test Centre Østerild. The assessment includes the establishment of three new\n                     turbine sites with a maximum height of 450 metres and the adaptation of two existing\n                     sites for wind turbines of the same height. For more information about the project,\n                     see the Danish Agency for Planning and Rural Development call for ideas and proposals\n                     for the environmental and habitat impact assessment https://www.plst.dk/Media/638545659120791552/Ideopl%C3%A6g%20for%20store%20vindm%C3%B8ller%20ved%20%C3%98sterild%20(rettet%20juni%202024).pdf\n                     (available in Danish only). The environmental and habitat impact assessment is expected\n                     to be completed by mid-2026.<br/>It follows from the agreement that, in parallel with\n                     the environmental and habitat impact assessment, a market survey will be carried out\n                     to decide whether and to what extent the new sites should be offered to relevant operators\n                     as long-term rental or sale. <br/>According to the agreement, once the results of\n                     the environmental and habitat impact assessment and the market survey are available\n                     and presented to the parties to the agreement, a final decision can be made on the\n                     possible establishment of test sites and the final conditions in this regard. At the\n                     same time, the parties to the agreement must decide whether and to what extent test\n                     sites can be offered to wind turbine manufacturers as long-term rental or sale. <br/>If\n                     it is decided to adapt and expand Test Centre Østerild, a Construction Act bill is\n                     expected to be presented to the Danish Parliament in early 2027. DTU expects to be\n                     able to initiate a call for tenders for potential new/adapted test sites in early\n                     2027, see the section below on \"Subsequent call for tenders for rental/purchase of\n                     the test sites\". <br/>PURPOSE OF THE EXPRESSION OF INTEREST: <br/>The purpose of this\n                     call for expression of interest is to get an indication from the market on whether\n                     the market is interested in entering into contracts for purchase or rental of potential\n                     new test sites for wind turbines up to 450 metres tall at Test Centre Østerild. The\n                     purpose of the market survey is thus to identify interest in entering into long-term\n                     rental agreements or actual purchase contracts. In this connection, DTU also requests\n                     feedback on any other requests for the test sites. This applies in particular to the\n                     rental period and other rental terms, as well as to the process for the call for tenders\n                     for the test sites and planning of the expansion. The potential expansion and adaptation\n                     of Test Centre Østerild is expected to establish three new test sites and adapt two\n                     existing test sites, so that a total of five test sites will allow the installation\n                     of wind turbines up to 450 metres tall. The remaining seven test sites at Test Centre\n                     Østerild will not be changed in terms of the maximum height of the wind turbines that\n                     may be installed at the test centre and are not included in this call for expression\n                     of interest. <br/>FINANCIAL CONDITIONS AND OTHER TERMS: <br/>The construction costs\n                     for the potential new and adapted test sites are expected to be in the range of DKK\n                     150-200 million per test site. If it is decided to sell the test sites to manufacturers,\n                     the price of the test sites must cover this amount. In addition, businesses purchasing\n                     test sites are expected to be obliged to return the test sites to the Danish State\n                     after 30 years in the same condition as when they were acquired. This corresponds\n                     to the terms and conditions for the existing test sites at Test Centre Østerild that\n                     are currently owned by manufacturers.<br/>When renting test sites, the annual minimum\n                     rent is expected to be determined on the basis of the principle that the investments\n                     in the test sites can be depreciated over a period of at least approximately 10 years.\n                     The rental period is expected to be at least 8-15 years, and preferably longer if\n                     there is market interest. <br/>Test Centre Østerild's geographical location with good\n                     wind conditions and good test facilities enables the wind turbine industry, in cooperation\n                     with DTU and other research institutions, to conduct efficient research, development\n                     and testing of wind turbines and wind turbine technology. There will be requirements\n                     for wind turbine manufacturers in relation to scope and annual reporting of research\n                     and development activities and the extent of cooperation with universities.<br/>There\n                     are noise limits for wind turbines erected at Test Centre Østerild, and as a starting\n                     point, the noise emission limits for the individual wind turbines at the new sites\n                     are 120 dB(A) at 6 m/s and 122 dB(A) at 8 m/s as defined in the Danish Statutory Order\n                     on Noise from Wind Turbines (Statutory Order no. 995 of 26 August 2024).<br/>In connection\n                     with the installation of the wind turbines, a building permit must be obtained, and\n                     the electrolysis plants must obtain environmental and safety approval. The wind turbine\n                     manufacturer is responsible for providing the necessary documentation in order to\n                     obtain the required approvals. In this context, there will be restrictions on emissions.<br/>QUESTIONS\n                     TO BE ANSWERED IN THE EXPRESSION OF INTEREST: <br/>Interested businesses are encouraged\n                     to briefly express their interest in owning or renting one or more of the potential\n                     new/adapted test sites at Test Centre Østerild. <br/>DTU REQUESTS THE FOLLOWING INFORMATION:\n                     <br/>• The overall purpose of owning or renting test sites and any preference in terms\n                     of either owning or renting one or more of the new sites.<br/>• Information about\n                     the ownership structure of the interested business.<br/>• Desire to own new/adapted\n                     test sites. <br/>• The number of test sites the business is interested in purchasing\n                     and the probability (high/medium/low) of doing so. <br/>• Desire to rent new/adapted\n                     test sites. <br/>• Number and desired rental period and the probability for each site\n                     (high/medium/low) of the business renting one or more test sites. <br/>• Requests\n                     for the test sites, including any special facilities at the test centre.<br/>• Requests\n                     for the research cooperation framework with DTU and other research institutions for\n                     conducting research projects on the wind turbines installed by the owner/tenant. <br/>These\n                     questions must be answered in the form available on the DTU website: https://wind.dtu.dk/-/media/institutter/vindenergi_ny/nyheder/2025/form-for-expression-of-interest-131125.docx<br/>This\n                     call for expression of interest i furthermore available using the following link:\n                     https://wind.dtu.dk/news/news/expression-of-interest?id=0567cbc7-53e1-49ae-9c67-1c0f4af58215<br/>After\n                     the expression of interest has been submitted, businesses will be given the opportunity\n                     to attend a follow-up meeting with DTU to provide more detailed information about\n                     their requests. <br/>SUBSEQUENT CALL FOR TENDERS FOR THE RENTAL/PURCHASE OF THE TEST\n                     SITES:<br/>If it is decided to adapt and expand Test Centre Østerild, the parties\n                     behind the agreement will decide whether and to what extent test sites can be rented\n                     and/or sold to wind turbine manufacturers. If so, a Construction Act bill is expected\n                     to be presented to the Danish Parliament in early 2027 according to the current project\n                     schedule. Under the same conditions, DTU expects to be able to initiate the call for\n                     tenders for potential new/adapted test sites in early 2027. The specification of the\n                     criteria applied for the selection of tenderers and indication of minimum purchase\n                     price/rent etc. will be set out in the call for tenders, and other terms for the tenders\n                     will be stated in the tender documents as well.<br/>For further information about\n                     the test centre and test sites, please contact Peter Bagger Hjuler, Director of Development,\n                     DTU Wind and Energy Systems, tel.: +45 4045 5037. <br/>Expression of interest must\n                     be received by DTU no later than 15 December 2025 and may be sent either by letter\n                     to DTU Wind Energy, Frederiksborgvej 399, 4000 Roskilde, Att. Peter Bagger Hjuler,\n                     Director of Development or by e-mail to peje@dtu.dk. <br/>Please mark letters and\n                     e-mails \"Expression of interest regarding expansion of Test Centre Østerild\".</span></section>\n            </section>\n            <section>5.1.12&nbsp;<span class=\"label\">Udbudsvilkår</span><section><span class=\"label\">Vilkår for indgivelse</span><span class=\"text\">:</span><section><span class=\"label\">Elektronisk indgivelse</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tilladt</span></section>\n                  <section><span class=\"label\">Indgivelsesadresse</span><span class=\"text\">: </span><span class=\"value\">https://wind.dtu.dk/-/media/institutter/vindenergi_ny/nyheder/2025/form-for-expression-of-interest-131125.docx</span></section>\n                  <section><span class=\"label\">Sprog, som tilbud og ansøgninger om deltagelse kan indgives på</span><span class=\"text\">: </span><span class=\"dynamic-label\">engelsk</span></section>\n                  <section><span class=\"label\">Frist for modtagelse af svar</span><span class=\"text\">: </span><span class=\"value\">15-12-2025</span><span class=\"text\"> </span><span class=\"value\">23:55 +01:00</span></section>\n               </section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisationer</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Danmarks Tekniske Universitet - DTU</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Enhed</span><span class=\"text\">: </span><span class=\"value\">Peter Bagger Hjuler, DTU Wind and Energy Systems</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">peje@dtu.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 4045 5037</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Køber</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0000</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Publications Office of the European Union</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">PUBL</span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Luxembourg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2417</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">LU000</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">ted@publications.europa.eu</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+352 29291</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://op.europa.eu</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n      </section>\n      <section><span class=\"label\">Oplysninger om bekendtgørelsen</span><section><span class=\"label\">Bekendtgørelsens ID</span><span class=\"text\">: </span><span class=\"value\">8a8d0d45-400b-4d58-add2-905cdcc49f19</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n         <section><span class=\"label\">Formulartype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Høring</span></section>\n         <section><span class=\"label\">Bekendtgørelsestype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bekendtgørelse om høring forud for markedsføring</span></section>\n         <section><span class=\"label\">Afsendelsesdato for bekendtgørelsen</span><span class=\"text\">: </span><span class=\"value\">14-11-2025</span><span class=\"text\"> </span><span class=\"value\">21:18 +00:00</span></section>\n         <section><span class=\"label\">Bekendtgørelsens officielle sprog</span><span class=\"text\">: </span><span class=\"dynamic-label\">engelsk</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         <section><span class=\"label\">Bekendtgørelsesnummer</span><span class=\"text\">: </span><span class=\"value\">00764938-2025</span></section>\n         <section><span class=\"label\">EUT-S-nummer</span><span class=\"text\">: </span><span class=\"value\">222/2025</span></section>\n         <section><span class=\"label\">Offentliggørelsesdato</span><span class=\"text\">: </span><span class=\"value\">18-11-2025</span></section>\n      </section>\n   </body>\n</html>","htmlEN":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Buyer</span><section>1.1&nbsp;<span class=\"label\">Buyer</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Danmarks Tekniske Universitet - DTU</span></section>\n            <section><span class=\"label\">Legal type of the buyer</span><span class=\"text\">: </span><span class=\"dynamic-label\">Body governed by public law</span></section>\n            <section><span class=\"label\">Legal type of the competent authority</span><span class=\"text\">: </span><span class=\"dynamic-label\">Body governed by public law</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Call for expression of interest regarding a possible expansion and adaptation of Test\n                  Centre Østerild for taller wind turbines</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the\n                  Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen)\n                  are currently preparing an environmental and habitat impact assessment for a potential\n                  expansion and adaptation of Test Centre Østerild, which will provide the opportunity\n                  to test prototype wind turbines up to 450 metres tall and testing of electrolysis\n                  plants in relation to the wind turbines. <br/>In this connection, DTU hereby invites\n                  relevant businesses to express their interest in owning or renting one or more of\n                  the potential new/adapted test sites at Test Centre Østerild. <br/></span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Supplies</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121300</span><span class=\"text\"> </span><span class=\"dynamic-label\">Wind-energy generators</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121340</span><span class=\"text\"> </span><span class=\"dynamic-label\">Wind farm</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121330</span><span class=\"text\"> </span><span class=\"dynamic-label\">Wind turbine generators</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121320</span><span class=\"text\"> </span><span class=\"dynamic-label\">Wind turbines</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121310</span><span class=\"text\"> </span><span class=\"dynamic-label\">Windmills</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nordjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK050</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nordjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK050</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\">The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the\n                     Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen)\n                     are currently preparing an environmental and habitat impact assessment for a potential\n                     expansion and adaptation of Test Centre Østerild, which will provide the opportunity\n                     to test prototype wind turbines up to 450 metres tall and testing of electrolysis\n                     plants in relation to the wind turbines. In this connection, DTU hereby invites relevant\n                     businesses to express their interest in owning or renting one or more of the potential\n                     new/adapted test sites at Test Centre Østerild. <br/>BACKGROUND AND TIME SCHEDULE:\n                     <br/>On 1 February 2024, a wide circle of Danish Parliament parties reached a political\n                     agreement to initiate an environmental and habitat impact assessment for an expansion\n                     of the Test Centre Østerild. The assessment includes the establishment of three new\n                     turbine sites with a maximum height of 450 metres and the adaptation of two existing\n                     sites for wind turbines of the same height. For more information about the project,\n                     see the Danish Agency for Planning and Rural Development call for ideas and proposals\n                     for the environmental and habitat impact assessment https://www.plst.dk/Media/638545659120791552/Ideopl%C3%A6g%20for%20store%20vindm%C3%B8ller%20ved%20%C3%98sterild%20(rettet%20juni%202024).pdf\n                     (available in Danish only). The environmental and habitat impact assessment is expected\n                     to be completed by mid-2026.<br/>It follows from the agreement that, in parallel with\n                     the environmental and habitat impact assessment, a market survey will be carried out\n                     to decide whether and to what extent the new sites should be offered to relevant operators\n                     as long-term rental or sale. <br/>According to the agreement, once the results of\n                     the environmental and habitat impact assessment and the market survey are available\n                     and presented to the parties to the agreement, a final decision can be made on the\n                     possible establishment of test sites and the final conditions in this regard. At the\n                     same time, the parties to the agreement must decide whether and to what extent test\n                     sites can be offered to wind turbine manufacturers as long-term rental or sale. <br/>If\n                     it is decided to adapt and expand Test Centre Østerild, a Construction Act bill is\n                     expected to be presented to the Danish Parliament in early 2027. DTU expects to be\n                     able to initiate a call for tenders for potential new/adapted test sites in early\n                     2027, see the section below on \"Subsequent call for tenders for rental/purchase of\n                     the test sites\". <br/>PURPOSE OF THE EXPRESSION OF INTEREST: <br/>The purpose of this\n                     call for expression of interest is to get an indication from the market on whether\n                     the market is interested in entering into contracts for purchase or rental of potential\n                     new test sites for wind turbines up to 450 metres tall at Test Centre Østerild. The\n                     purpose of the market survey is thus to identify interest in entering into long-term\n                     rental agreements or actual purchase contracts. In this connection, DTU also requests\n                     feedback on any other requests for the test sites. This applies in particular to the\n                     rental period and other rental terms, as well as to the process for the call for tenders\n                     for the test sites and planning of the expansion. The potential expansion and adaptation\n                     of Test Centre Østerild is expected to establish three new test sites and adapt two\n                     existing test sites, so that a total of five test sites will allow the installation\n                     of wind turbines up to 450 metres tall. The remaining seven test sites at Test Centre\n                     Østerild will not be changed in terms of the maximum height of the wind turbines that\n                     may be installed at the test centre and are not included in this call for expression\n                     of interest. <br/>FINANCIAL CONDITIONS AND OTHER TERMS: <br/>The construction costs\n                     for the potential new and adapted test sites are expected to be in the range of DKK\n                     150-200 million per test site. If it is decided to sell the test sites to manufacturers,\n                     the price of the test sites must cover this amount. In addition, businesses purchasing\n                     test sites are expected to be obliged to return the test sites to the Danish State\n                     after 30 years in the same condition as when they were acquired. This corresponds\n                     to the terms and conditions for the existing test sites at Test Centre Østerild that\n                     are currently owned by manufacturers.<br/>When renting test sites, the annual minimum\n                     rent is expected to be determined on the basis of the principle that the investments\n                     in the test sites can be depreciated over a period of at least approximately 10 years.\n                     The rental period is expected to be at least 8-15 years, and preferably longer if\n                     there is market interest. <br/>Test Centre Østerild's geographical location with good\n                     wind conditions and good test facilities enables the wind turbine industry, in cooperation\n                     with DTU and other research institutions, to conduct efficient research, development\n                     and testing of wind turbines and wind turbine technology. There will be requirements\n                     for wind turbine manufacturers in relation to scope and annual reporting of research\n                     and development activities and the extent of cooperation with universities.<br/>There\n                     are noise limits for wind turbines erected at Test Centre Østerild, and as a starting\n                     point, the noise emission limits for the individual wind turbines at the new sites\n                     are 120 dB(A) at 6 m/s and 122 dB(A) at 8 m/s as defined in the Danish Statutory Order\n                     on Noise from Wind Turbines (Statutory Order no. 995 of 26 August 2024).<br/>In connection\n                     with the installation of the wind turbines, a building permit must be obtained, and\n                     the electrolysis plants must obtain environmental and safety approval. The wind turbine\n                     manufacturer is responsible for providing the necessary documentation in order to\n                     obtain the required approvals. In this context, there will be restrictions on emissions.<br/>QUESTIONS\n                     TO BE ANSWERED IN THE EXPRESSION OF INTEREST: <br/>Interested businesses are encouraged\n                     to briefly express their interest in owning or renting one or more of the potential\n                     new/adapted test sites at Test Centre Østerild. <br/>DTU REQUESTS THE FOLLOWING INFORMATION:\n                     <br/>• The overall purpose of owning or renting test sites and any preference in terms\n                     of either owning or renting one or more of the new sites.<br/>• Information about\n                     the ownership structure of the interested business.<br/>• Desire to own new/adapted\n                     test sites. <br/>• The number of test sites the business is interested in purchasing\n                     and the probability (high/medium/low) of doing so. <br/>• Desire to rent new/adapted\n                     test sites. <br/>• Number and desired rental period and the probability for each site\n                     (high/medium/low) of the business renting one or more test sites. <br/>• Requests\n                     for the test sites, including any special facilities at the test centre.<br/>• Requests\n                     for the research cooperation framework with DTU and other research institutions for\n                     conducting research projects on the wind turbines installed by the owner/tenant. <br/>These\n                     questions must be answered in the form available on the DTU website: https://wind.dtu.dk/-/media/institutter/vindenergi_ny/nyheder/2025/form-for-expression-of-interest-131125.docx<br/>This\n                     call for expression of interest i furthermore available using the following link:\n                     https://wind.dtu.dk/news/news/expression-of-interest?id=0567cbc7-53e1-49ae-9c67-1c0f4af58215<br/>After\n                     the expression of interest has been submitted, businesses will be given the opportunity\n                     to attend a follow-up meeting with DTU to provide more detailed information about\n                     their requests. <br/>SUBSEQUENT CALL FOR TENDERS FOR THE RENTAL/PURCHASE OF THE TEST\n                     SITES:<br/>If it is decided to adapt and expand Test Centre Østerild, the parties\n                     behind the agreement will decide whether and to what extent test sites can be rented\n                     and/or sold to wind turbine manufacturers. If so, a Construction Act bill is expected\n                     to be presented to the Danish Parliament in early 2027 according to the current project\n                     schedule. Under the same conditions, DTU expects to be able to initiate the call for\n                     tenders for potential new/adapted test sites in early 2027. The specification of the\n                     criteria applied for the selection of tenderers and indication of minimum purchase\n                     price/rent etc. will be set out in the call for tenders, and other terms for the tenders\n                     will be stated in the tender documents as well.<br/>For further information about\n                     the test centre and test sites, please contact Peter Bagger Hjuler, Director of Development,\n                     DTU Wind and Energy Systems, tel.: +45 4045 5037. <br/>Expression of interest must\n                     be received by DTU no later than 15 December 2025 and may be sent either by letter\n                     to DTU Wind Energy, Frederiksborgvej 399, 4000 Roskilde, Att. Peter Bagger Hjuler,\n                     Director of Development or by e-mail to peje@dtu.dk. <br/>Please mark letters and\n                     e-mails \"Expression of interest regarding expansion of Test Centre Østerild\".</span></section>\n               <section><span class=\"label\">Legal basis</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Other</span></section>\n            </section>\n         </section>\n      </section>\n      <section>5&nbsp;<span class=\"label\">Lot</span><section>5.1&nbsp;<span class=\"label\">Lot technical ID</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Call for expression of interest regarding a possible expansion and adaptation of Test\n                  Centre Østerild for taller wind turbines</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the\n                  Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen)\n                  are currently preparing an environmental and habitat impact assessment for a potential\n                  expansion and adaptation of Test Centre Østerild, which will provide the opportunity\n                  to test prototype wind turbines up to 450 metres tall and testing of electrolysis\n                  plants in relation to the wind turbines. In this connection, DTU hereby invites relevant\n                  businesses to express their interest in owning or renting one or more of the potential\n                  new/adapted test sites at Test Centre Østerild. <br/></span></section>\n            <section>5.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Supplies</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121300</span><span class=\"text\"> </span><span class=\"dynamic-label\">Wind-energy generators</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121340</span><span class=\"text\"> </span><span class=\"dynamic-label\">Wind farm</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121330</span><span class=\"text\"> </span><span class=\"dynamic-label\">Wind turbine generators</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121320</span><span class=\"text\"> </span><span class=\"dynamic-label\">Wind turbines</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31121310</span><span class=\"text\"> </span><span class=\"dynamic-label\">Windmills</span></section>\n            </section>\n            <section>5.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nordjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK050</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n               <section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\"></span></section>\n            </section>\n            <section>5.1.6&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\">The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the\n                     Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen)\n                     are currently preparing an environmental and habitat impact assessment for a potential\n                     expansion and adaptation of Test Centre Østerild, which will provide the opportunity\n                     to test prototype wind turbines up to 450 metres tall and testing of electrolysis\n                     plants in relation to the wind turbines. In this connection, DTU hereby invites relevant\n                     businesses to express their interest in owning or renting one or more of the potential\n                     new/adapted test sites at Test Centre Østerild. <br/>BACKGROUND AND TIME SCHEDULE:\n                     <br/>On 1 February 2024, a wide circle of Danish Parliament parties reached a political\n                     agreement to initiate an environmental and habitat impact assessment for an expansion\n                     of the Test Centre Østerild. The assessment includes the establishment of three new\n                     turbine sites with a maximum height of 450 metres and the adaptation of two existing\n                     sites for wind turbines of the same height. For more information about the project,\n                     see the Danish Agency for Planning and Rural Development call for ideas and proposals\n                     for the environmental and habitat impact assessment https://www.plst.dk/Media/638545659120791552/Ideopl%C3%A6g%20for%20store%20vindm%C3%B8ller%20ved%20%C3%98sterild%20(rettet%20juni%202024).pdf\n                     (available in Danish only). The environmental and habitat impact assessment is expected\n                     to be completed by mid-2026.<br/>It follows from the agreement that, in parallel with\n                     the environmental and habitat impact assessment, a market survey will be carried out\n                     to decide whether and to what extent the new sites should be offered to relevant operators\n                     as long-term rental or sale. <br/>According to the agreement, once the results of\n                     the environmental and habitat impact assessment and the market survey are available\n                     and presented to the parties to the agreement, a final decision can be made on the\n                     possible establishment of test sites and the final conditions in this regard. At the\n                     same time, the parties to the agreement must decide whether and to what extent test\n                     sites can be offered to wind turbine manufacturers as long-term rental or sale. <br/>If\n                     it is decided to adapt and expand Test Centre Østerild, a Construction Act bill is\n                     expected to be presented to the Danish Parliament in early 2027. DTU expects to be\n                     able to initiate a call for tenders for potential new/adapted test sites in early\n                     2027, see the section below on \"Subsequent call for tenders for rental/purchase of\n                     the test sites\". <br/>PURPOSE OF THE EXPRESSION OF INTEREST: <br/>The purpose of this\n                     call for expression of interest is to get an indication from the market on whether\n                     the market is interested in entering into contracts for purchase or rental of potential\n                     new test sites for wind turbines up to 450 metres tall at Test Centre Østerild. The\n                     purpose of the market survey is thus to identify interest in entering into long-term\n                     rental agreements or actual purchase contracts. In this connection, DTU also requests\n                     feedback on any other requests for the test sites. This applies in particular to the\n                     rental period and other rental terms, as well as to the process for the call for tenders\n                     for the test sites and planning of the expansion. The potential expansion and adaptation\n                     of Test Centre Østerild is expected to establish three new test sites and adapt two\n                     existing test sites, so that a total of five test sites will allow the installation\n                     of wind turbines up to 450 metres tall. The remaining seven test sites at Test Centre\n                     Østerild will not be changed in terms of the maximum height of the wind turbines that\n                     may be installed at the test centre and are not included in this call for expression\n                     of interest. <br/>FINANCIAL CONDITIONS AND OTHER TERMS: <br/>The construction costs\n                     for the potential new and adapted test sites are expected to be in the range of DKK\n                     150-200 million per test site. If it is decided to sell the test sites to manufacturers,\n                     the price of the test sites must cover this amount. In addition, businesses purchasing\n                     test sites are expected to be obliged to return the test sites to the Danish State\n                     after 30 years in the same condition as when they were acquired. This corresponds\n                     to the terms and conditions for the existing test sites at Test Centre Østerild that\n                     are currently owned by manufacturers.<br/>When renting test sites, the annual minimum\n                     rent is expected to be determined on the basis of the principle that the investments\n                     in the test sites can be depreciated over a period of at least approximately 10 years.\n                     The rental period is expected to be at least 8-15 years, and preferably longer if\n                     there is market interest. <br/>Test Centre Østerild's geographical location with good\n                     wind conditions and good test facilities enables the wind turbine industry, in cooperation\n                     with DTU and other research institutions, to conduct efficient research, development\n                     and testing of wind turbines and wind turbine technology. There will be requirements\n                     for wind turbine manufacturers in relation to scope and annual reporting of research\n                     and development activities and the extent of cooperation with universities.<br/>There\n                     are noise limits for wind turbines erected at Test Centre Østerild, and as a starting\n                     point, the noise emission limits for the individual wind turbines at the new sites\n                     are 120 dB(A) at 6 m/s and 122 dB(A) at 8 m/s as defined in the Danish Statutory Order\n                     on Noise from Wind Turbines (Statutory Order no. 995 of 26 August 2024).<br/>In connection\n                     with the installation of the wind turbines, a building permit must be obtained, and\n                     the electrolysis plants must obtain environmental and safety approval. The wind turbine\n                     manufacturer is responsible for providing the necessary documentation in order to\n                     obtain the required approvals. In this context, there will be restrictions on emissions.<br/>QUESTIONS\n                     TO BE ANSWERED IN THE EXPRESSION OF INTEREST: <br/>Interested businesses are encouraged\n                     to briefly express their interest in owning or renting one or more of the potential\n                     new/adapted test sites at Test Centre Østerild. <br/>DTU REQUESTS THE FOLLOWING INFORMATION:\n                     <br/>• The overall purpose of owning or renting test sites and any preference in terms\n                     of either owning or renting one or more of the new sites.<br/>• Information about\n                     the ownership structure of the interested business.<br/>• Desire to own new/adapted\n                     test sites. <br/>• The number of test sites the business is interested in purchasing\n                     and the probability (high/medium/low) of doing so. <br/>• Desire to rent new/adapted\n                     test sites. <br/>• Number and desired rental period and the probability for each site\n                     (high/medium/low) of the business renting one or more test sites. <br/>• Requests\n                     for the test sites, including any special facilities at the test centre.<br/>• Requests\n                     for the research cooperation framework with DTU and other research institutions for\n                     conducting research projects on the wind turbines installed by the owner/tenant. <br/>These\n                     questions must be answered in the form available on the DTU website: https://wind.dtu.dk/-/media/institutter/vindenergi_ny/nyheder/2025/form-for-expression-of-interest-131125.docx<br/>This\n                     call for expression of interest i furthermore available using the following link:\n                     https://wind.dtu.dk/news/news/expression-of-interest?id=0567cbc7-53e1-49ae-9c67-1c0f4af58215<br/>After\n                     the expression of interest has been submitted, businesses will be given the opportunity\n                     to attend a follow-up meeting with DTU to provide more detailed information about\n                     their requests. <br/>SUBSEQUENT CALL FOR TENDERS FOR THE RENTAL/PURCHASE OF THE TEST\n                     SITES:<br/>If it is decided to adapt and expand Test Centre Østerild, the parties\n                     behind the agreement will decide whether and to what extent test sites can be rented\n                     and/or sold to wind turbine manufacturers. If so, a Construction Act bill is expected\n                     to be presented to the Danish Parliament in early 2027 according to the current project\n                     schedule. Under the same conditions, DTU expects to be able to initiate the call for\n                     tenders for potential new/adapted test sites in early 2027. The specification of the\n                     criteria applied for the selection of tenderers and indication of minimum purchase\n                     price/rent etc. will be set out in the call for tenders, and other terms for the tenders\n                     will be stated in the tender documents as well.<br/>For further information about\n                     the test centre and test sites, please contact Peter Bagger Hjuler, Director of Development,\n                     DTU Wind and Energy Systems, tel.: +45 4045 5037. <br/>Expression of interest must\n                     be received by DTU no later than 15 December 2025 and may be sent either by letter\n                     to DTU Wind Energy, Frederiksborgvej 399, 4000 Roskilde, Att. Peter Bagger Hjuler,\n                     Director of Development or by e-mail to peje@dtu.dk. <br/>Please mark letters and\n                     e-mails \"Expression of interest regarding expansion of Test Centre Østerild\".</span></section>\n            </section>\n            <section>5.1.12&nbsp;<span class=\"label\">Terms of procurement</span><section><span class=\"label\">Terms of submission</span><span class=\"text\">:</span><section><span class=\"label\">Electronic submission</span><span class=\"text\">: </span><span class=\"dynamic-label\">Allowed</span></section>\n                  <section><span class=\"label\">Address for submission</span><span class=\"text\">: </span><span class=\"value\">https://wind.dtu.dk/-/media/institutter/vindenergi_ny/nyheder/2025/form-for-expression-of-interest-131125.docx</span></section>\n                  <section><span class=\"label\">Languages in which tenders or requests to participate may be submitted</span><span class=\"text\">: </span><span class=\"dynamic-label\">English</span></section>\n                  <section><span class=\"label\">Deadline for receipt of answers</span><span class=\"text\">: </span><span class=\"value\">15-12-2025</span><span class=\"text\"> </span><span class=\"value\">23:55 +01:00</span></section>\n               </section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisations</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Danmarks Tekniske Universitet - DTU</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Contact point</span><span class=\"text\">: </span><span class=\"value\">Peter Bagger Hjuler, DTU Wind and Energy Systems</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">peje@dtu.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 4045 5037</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Buyer</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0000</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Publications Office of the European Union</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">PUBL</span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Luxembourg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2417</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">LU000</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">ted@publications.europa.eu</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+352 29291</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://op.europa.eu</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n      </section>\n      <section><span class=\"label\">Notice information</span><section><span class=\"label\">Notice identifier/version</span><span class=\"text\">: </span><span class=\"value\">8a8d0d45-400b-4d58-add2-905cdcc49f19</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n         <section><span class=\"label\">Form type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Consultation</span></section>\n         <section><span class=\"label\">Notice type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Pre-market consultation notice</span></section>\n         <section><span class=\"label\">Notice dispatch date</span><span class=\"text\">: </span><span class=\"value\">14-11-2025</span><span class=\"text\"> </span><span class=\"value\">21:18 +00:00</span></section>\n         <section><span class=\"label\">Languages in which this notice is officially available</span><span class=\"text\">: </span><span class=\"dynamic-label\">English</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         <section><span class=\"label\">Notice publication number</span><span class=\"text\">: </span><span class=\"value\">00764938-2025</span></section>\n         <section><span class=\"label\">OJ S issue number</span><span class=\"text\">: </span><span class=\"value\">222/2025</span></section>\n         <section><span class=\"label\">Publication date</span><span class=\"text\">: </span><span class=\"value\">18-11-2025</span></section>\n      </section>\n   </body>\n</html>","opsummeringDA":{"card":{"titel":"Call for expression of interest regarding a possible expansion and adaptation of Test Centre Østerild for taller wind turbines ","ordregiver":"Danmarks Tekniske Universitet - DTU","ordregiverId":"","publiceringsdato":"2025-11-18+01:00","cpvKode":"31121300","cpvTitel":"Vindenergigeneratorer","formulartype":"Høring","formulartypeKode":"consultation","tidsfrister":["2025-12-15T23:55:00+01:00"],"alleOrdregivere":["Danmarks Tekniske Universitet - DTU"],"beskrivelse":"The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen) are currently preparing an environmental and habitat impact assessment for a potential expansion and adaptation of Test Centre Østerild, which will provide the opportunity to test prototype wind turbines up to 450 metres tall and testing of electrolysis plants in relation to the wind turbines. \nIn this connection, DTU hereby invites relevant businesses to express their interest in owning or renting one or more of the potential new/adapted test sites at Test Centre Østerild. \n","bkSubTypeKode":"E1","bkSubType":"Frivillig meddelelse om høring forud for markedsføring","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":["DK050","DK050"],"udforelsesstedSubLand":["Nordjylland","Nordjylland"],"udforelsesstedLand":["Danmark","Danmark"],"udforelsesstedBy":[],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"svarfrister":["2025-12-15T23:55:00+01:00"],"antalParts":0,"antalLots":1,"udbudsDokumenter":[]},"opsummeringEN":{"card":{"titel":"Call for expression of interest regarding a possible expansion and adaptation of Test Centre Østerild for taller wind turbines ","ordregiver":"Danmarks Tekniske Universitet - DTU","ordregiverId":"","publiceringsdato":"2025-11-18+01:00","cpvKode":"31121300","cpvTitel":"Wind-energy generators","formulartype":"Consultation","formulartypeKode":"consultation","tidsfrister":["2025-12-15T23:55:00+01:00"],"alleOrdregivere":["Danmarks Tekniske Universitet - DTU"],"beskrivelse":"The Technical University of Denmark (Danmarks Tekniske Universitet) (DTU) and the Danish Agency for Planning and Rural Development (Plan- og Landdistriktsstyrelsen) are currently preparing an environmental and habitat impact assessment for a potential expansion and adaptation of Test Centre Østerild, which will provide the opportunity to test prototype wind turbines up to 450 metres tall and testing of electrolysis plants in relation to the wind turbines. \nIn this connection, DTU hereby invites relevant businesses to express their interest in owning or renting one or more of the potential new/adapted test sites at Test Centre Østerild. \n","bkSubTypeKode":"E1","bkSubType":"Voluntary pre-market consultation notice","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":["DK050","DK050"],"udforelsesstedSubLand":["Nordjylland","Nordjylland"],"udforelsesstedLand":["Denmark","Denmark"],"udforelsesstedBy":[],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"svarfrister":["2025-12-15T23:55:00+01:00"],"antalParts":0,"antalLots":1,"udbudsDokumenter":[]}}