{"bekendtgoerelseNoegle":{"noticeId":{"value":"661d9a4d-d0be-448f-ac58-ebdefe947e83"},"noticeVersion":{"value":"01"},"noticePublicationNumber":{"value":"00072502-2026"}},"htmlDA":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Køber</span><section>1.1&nbsp;<span class=\"label\">Køber</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span></section>\n            <section><span class=\"label\">Køberens retlige status</span><span class=\"text\">: </span><span class=\"dynamic-label\">Offentligretligt organ</span></section>\n            <section><span class=\"label\">Den ordregivende myndigheds aktivitet</span><span class=\"text\">: </span><span class=\"dynamic-label\">Generelle offentlige tjenesteydelser</span></section>\n            <section><span class=\"label\">Den ordregivende enheds aktiviteter</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bytransport med jernbane, sporvogn, trolleybus eller bus</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Cityring Extension Nordhavn Early Contractor Involvement</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet is tendering for an extension of the Cityringen M4 metro to Nordhavn\n                  (CRNHE). CRNHE will consists of two metro-stations from Orientkaj to outer Nordhavn.\n                  CRNHE is planned as an elevated line. The metro line will be crossing Skudeløbet in\n                  Nordhavn. The extension is expected to ready to open in 2030. The existing M4 line\n                  in Nordhavn is an attractive and function part of the network, but the CRNHE project\n                  aims to improve in terms of sustainability, passenger experience and operation. The\n                  project is divided into two major contracts: Integrated Works Contract (IWC Contract)\n                  – This contract overall covers design, civil works, permanent way and access control\n                  and is procured by this contract notice. For further details on the services and works\n                  included in the contract see below and for at detailed description please refer to:\n                  Scope of Works, doc id.CR-MS-GEN=NHE-CG-CONSPE-000004. Transportation System Contract\n                  (TS-contractor) - all other transportation systems. Besides the two major contracts\n                  Metroselskabet will be entering into contract with different consultants on other\n                  parts of the project, such as Areas and Rights, Environmental Impact Assessment consultancy\n                  etc. The IWC contract covers the following disciplines: Viaducts &amp; elevated structures,\n                  including sub-structure Elevated Stations Temporary works for completion of the permanent\n                  works. Architectural Finishes Sustainability &amp; Carbon Initiatives Alignment &amp; Permanent\n                  way Noise screens, noise &amp; vibration monitoring and mitigation Geology &amp; Hydrogeology\n                  Technical Buildings &amp; installations Electrical Works &amp; Power Supply for stations and\n                  elevated structures Mechanical Works for stations and elevated structures Access Control\n                  Traction Power (3rd rail) Interface to SCADA Preparatory Works Technical Safety (Jernbanesikkerhed)\n                  Technical Interfaces Finishing Works Worksites Identification &amp; planning for utility\n                  relocation Climate Protection Strategy Environmental Management Risk Management Interfaces\n                  with city development, Østlig Ringvej. Construction Programming Construction Budgeting\n                  The IWC might also be asked to do some early works, such as diversion of utilities\n                  and public road diversions, certain utility diversions, demolition or other tasks\n                  identified as part of the collaboration phase. CRNHE is one of the first larger projects\n                  where Metroselskabet´s ambitions of reducing the climate impact by 50% will be a significant\n                  factor impacting the solution of the project. And Metroselskabet would like to benefit\n                  from the contractor´s knowledge and experiences with the construction industry. Metroselskabet\n                  has Page 1/13 74244-2025assessed that to achieve the reduction of the climate footprint\n                  it is necessary for Metroselskabet and the contractor to work very closely together\n                  by bringing in the contractor and his design team (Integrated Works Contractor) at\n                  a very early stage of the project. Thus, Metroselskabet has decided to procure the\n                  CRNHE as an Early Contractor Involvement (ECI) project. After the designing of the\n                  metro line, Metroselskabet will enter into a Design and Build contract (based on ABT18)\n                  with the Integrated Works Contractor (IWC) The project is divided into two main phases\n                  with underlying stages and gate stages: Phase 1: Collaboration Phase – A phase where\n                  the project will be designed and developed in close collaboration between Metroselskabet,\n                  the Integrated Works Contractor. The collaboration Phase is contractually regulated\n                  by a collaboration agreement, Collaboration Terms and Conditions, doc. id. CR-MSGEN=NHE-CG-CON-SPE-000002-ATT14\n                  and a conditional Design and Build contract (ABT18). doc. id CR-MS-GEN=NHE-CG-CON-SPE-000002.\n                  The collaboration agreement can be terminated by the Integrated Works Contractor and/or\n                  Metroselskabet at convenience. The conditioned ABT18 contract will enter into force\n                  if the pre-requisites, are met. Please Refer to the Design and Build Contract, doc\n                  id: CR-MS-GEN=NHE-CG-CON-SPE-000002, section 1.1. In the collaboration phase the Integrated\n                  Works Contractor is liable for the design as well as the time schedule, pricing and\n                  constructability of the project. Also, the contractor should focus on ensuring a close\n                  collaboration with the Transportation System contractor, EIA consultant, the Areas\n                  and Rights consultant and possible early works contractors. The engineers and the\n                  architects of the Integrated Works Contractor are expected to focus on the development\n                  of the design, reducing carbon emissions and improving passenger experience. Phase\n                  2: Construction Phase – After signing the ABT18 contract, the project moves into the\n                  construction phase. The Construction consists of a detailed design stage and a construction\n                  stage. In the construction phase the Integrated Works Contractor is expected (among\n                  other things) to keep focus on collaborating closely with Metroselskabet and the Transportation\n                  System contractor, reducing the carbon footprint, time, costs and quality during construction\n                  The applicant should apply for prequalification with a design team - both architects\n                  and engineering discipline consultants. Metroselskabet will focus on the architectural\n                  appearance and materiality proposed for the two new stations. The architecture should\n                  comply with the ambition of significantly reducing the carbon footprint. Metroselskabet\n                  would like to be challenged by the architects of the two new stations and the possibility\n                  for development under /over the viaduct. The applicant is encouraged to include an\n                  architect with substantial experience with similar complex and onerous functional\n                  type projects, yet providing creative and innovative architectural solutions, while\n                  maintaining high level of functional clarity in the design.</span></section>\n            <section><span class=\"label\">Identifikator for proceduren</span><span class=\"text\">: </span><span class=\"value\">9b1eb410-2e55-4914-9510-ac8b58171104</span></section>\n            <section><span class=\"label\">Tidligere bekendtgørelse</span><span class=\"text\">: </span><span class=\"value\">74244-2025</span></section>\n            <section><span class=\"label\">Udbudsprocedure</span><span class=\"text\">: </span><span class=\"dynamic-label\">Konkurrencepræget dialog</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bygge- og anlægsarbejder</span></section>\n               <section><span class=\"label\">Supplerende kontrakttype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tjenesteydelser</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejder</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45230000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejde i forbindelse med rørledninger, kommunikations- og stærkstrømsledninger, med hovedveje, veje, flyvepladser og jernbaner; nivelleringsarbejde</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n               <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n               <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n               <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            </section>\n            <section>2.1.3&nbsp;<span class=\"label\">Værdi</span><section><span class=\"label\">Anslået værdi eksklusiv moms</span><span class=\"text\">: </span><span class=\"value\">900.000.000</span><span class=\"text\"> </span><span class=\"label\">Dansk krone</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Retsgrundlag</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Direktiv 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>5&nbsp;<span class=\"label\">Delkontrakt</span><section>5.1&nbsp;<span class=\"label\">Delkontrakt</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Cityringen Extension Nordhavn Early Contractor Involvement</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet is tendering for an extension of the Cityringen M4 metro to Nordhavn\n                  (CRNHE). CRNHE will consists of two metro-stations from Orientkaj to outer Nordhavn.\n                  CRNHE is planned as an elevated line. The metro line will be crossing Skudeløbet in\n                  Nordhavn. The extension is expected to ready to open in 2030. The existing M4 line\n                  in Nordhavn is an attractive and function part of the network, but the CRNHE project\n                  aims to improve in terms of sustainability, passenger experience and operation. The\n                  project is divided into two major contracts: Integrated Works Contract (IWC Contract)\n                  – This contract overall covers design, civil works, permanent way and access control\n                  and is procured by this contract notice. For further details on the services and works\n                  included in the contract see below and for at detailed description please refer to:\n                  Scope of Works, doc id.CR-MS-GEN=NHE-CG-CONSPE-000004. Transportation System Contract\n                  (TS-contractor) - all other transportation systems. Besides the two major contracts\n                  Metroselskabet will be entering into contract with different consultants on other\n                  parts of the project, such as Areas and Rights, Environmental Impact Assessment consultancy\n                  etc. The IWC contract covers the following disciplines: Viaducts &amp; elevated structures,\n                  including sub-structure Elevated Stations Temporary works for completion of the permanent\n                  works. Architectural Finishes Sustainability &amp; Carbon Initiatives Alignment &amp; Permanent\n                  way Noise screens, noise &amp; vibration monitoring and mitigation Geology &amp; Hydrogeology\n                  Technical Buildings &amp; installations Electrical Works &amp; Power Supply for stations and\n                  elevated structures Mechanical Works for stations and elevated structures Access Control\n                  Traction Power (3rd rail) Interface to SCADA Preparatory Works Technical Safety (Jernbanesikkerhed)\n                  Technical Interfaces Finishing Works Worksites Identification &amp; planning for utility\n                  relocation Climate Protection Strategy Environmental Management Risk Management Interfaces\n                  with city development, Østlig Ringvej. Construction Programming Construction Budgeting\n                  The IWC might also be asked to do some early works, such as diversion of utilities\n                  and public road diversions, certain utility diversions, demolition or other tasks\n                  identified as part of the collaboration phase. CRNHE is one of the first larger projects\n                  where Metroselskabet´s ambitions of reducing the climate impact by 50% will be a significant\n                  factor impacting the solution of the project. And Metroselskabet would like to benefit\n                  from the contractor´s knowledge and experiences with the construction industry. Metroselskabet\n                  has Page 1/13 74244-2025assessed that to achieve the reduction of the climate footprint\n                  it is necessary for Metroselskabet and the contractor to work very closely together\n                  by bringing in the contractor and his design team (Integrated Works Contractor) at\n                  a very early stage of the project. Thus, Metroselskabet has decided to procure the\n                  CRNHE as an Early Contractor Involvement (ECI) project. After the designing of the\n                  metro line, Metroselskabet will enter into a Design and Build contract (based on ABT18)\n                  with the Integrated Works Contractor (IWC) The project is divided into two main phases\n                  with underlying stages and gate stages: Phase 1: Collaboration Phase – A phase where\n                  the project will be designed and developed in close collaboration between Metroselskabet,\n                  the Integrated Works Contractor. The collaboration Phase is contractually regulated\n                  by a collaboration agreement, Collaboration Terms and Conditions, doc. id. CR-MSGEN=NHE-CG-CON-SPE-000002-ATT14\n                  and a conditional Design and Build contract (ABT18). doc. id CR-MS-GEN=NHE-CG-CON-SPE-000002.\n                  The collaboration agreement can be terminated by the Integrated Works Contractor and/or\n                  Metroselskabet at convenience. The conditioned ABT18 contract will enter into force\n                  if the pre-requisites, are met. Please Refer to the Design and Build Contract, doc\n                  id: CR-MS-GEN=NHE-CG-CON-SPE-000002, section 1.1. In the collaboration phase the Integrated\n                  Works Contractor is liable for the design as well as the time schedule, pricing and\n                  constructability of the project. Also, the contractor should focus on ensuring a close\n                  collaboration with the Transportation System contractor, EIA consultant, the Areas\n                  and Rights consultant and possible early works contractors. The engineers and the\n                  architects of the Integrated Works Contractor are expected to focus on the development\n                  of the design, reducing carbon emissions and improving passenger experience. Phase\n                  2: Construction Phase – After signing the ABT18 contract, the project moves into the\n                  construction phase. The Construction consists of a detailed design stage and a construction\n                  stage. In the construction phase the Integrated Works Contractor is expected (among\n                  other things) to keep focus on collaborating closely with Metroselskabet and the Transportation\n                  System contractor, reducing the carbon footprint, time, costs and quality during construction\n                  The applicant should apply for prequalification with a design team - both architects\n                  and engineering discipline consultants. Metroselskabet will focus on the architectural\n                  appearance and materiality proposed for the two new stations. The architecture should\n                  comply with the ambition of significantly reducing the carbon footprint. Metroselskabet\n                  would like to be challenged by the architects of the two new stations and the possibility\n                  for development under /over the viaduct. The applicant is encouraged to include an\n                  architect with substantial experience with similar complex and onerous functional\n                  type projects, yet providing creative and innovative architectural solutions, while\n                  maintaining high level of functional clarity in the design.</span></section>\n            <section>5.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bygge- og anlægsarbejder</span></section>\n               <section><span class=\"label\">Supplerende kontrakttype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tjenesteydelser</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejder</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45230000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejde i forbindelse med rørledninger, kommunikations- og stærkstrømsledninger, med hovedveje, veje, flyvepladser og jernbaner; nivelleringsarbejde</span></section>\n            </section>\n            <section>5.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">København</span></section>\n               <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n               <section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\"></span></section>\n            </section>\n            <section>5.1.3&nbsp;<span class=\"label\">Anslået varighed</span><section><span class=\"label\">Startdato</span><span class=\"text\">: </span><span class=\"value\">30-09-2025</span></section>\n               <section><span class=\"label\">Varighed</span><span class=\"text\">: </span><span class=\"value\">6</span><span class=\"text\"> </span><span class=\"label\">År</span></section>\n            </section>\n            <section>5.1.6&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"dynamic-label\">Indkøbsprojekt, der ikke finansieres med EU-midler</span></section>\n               <section><span class=\"label\">Udbuddet er omfattet af aftalen om offentlige udbud (GPA)</span><span class=\"text\">: </span><span class=\"label\">ja</span></section>\n               <section><span class=\"label\">Oplysninger om tidligere bekendtgørelser</span><span class=\"text\">:</span><section><span class=\"label\">ID for den foregående bekendtgørelse</span><span class=\"text\">: </span><span class=\"value\">74244-2025</span></section>\n               </section>\n            </section>\n            <section>5.1.10&nbsp;<span class=\"label\">Tildelingskriterier</span><section><span class=\"label\">Kriterium</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Kvalitet</span></section>\n                  <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Collaboration</span></section>\n               </section>\n               <section><span class=\"label\">Kriterium</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Kvalitet</span></section>\n                  <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Processes</span></section>\n               </section>\n               <section><span class=\"label\">Kriterium</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Kvalitet</span></section>\n                  <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Key personnel and Organisation</span></section>\n               </section>\n               <section><span class=\"label\">Kriterium</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Pris</span></section>\n                  <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Hourly Rates</span></section>\n               </section>\n               <section><span class=\"label\">Kriterium</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Pris</span></section>\n                  <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Overhead and Profit</span></section>\n               </section>\n               <section><span class=\"label\">Kriterium</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Pris</span></section>\n                  <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Schedule of Prices</span></section>\n               </section>\n            </section>\n            <section>5.1.15&nbsp;<span class=\"label\">Teknikker</span><section><span class=\"label\">Rammeaftale</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Ingen rammeaftale</span></section>\n               </section>\n               <section><span class=\"label\">Oplysninger om det dynamiske indkøbssystem</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Intet dynamisk indkøbssystem</span></section>\n               </section>\n            </section>\n            <section>5.1.16&nbsp;<span class=\"label\">Yderligere oplysninger, mægling og gennemgang</span><section><span class=\"label\">Organisation med ansvar for klager</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for udbud</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Oplysninger om klagefrister</span><span class=\"text\">: </span><span class=\"value\">In accordance with Act no 492 of 12 May 2010 with subsequent<br/>amendments appeals\n                     regarding failure to become pre-qualified shall be submitted to the<br/>Complaint\n                     Board for Public Procurements within 20 calendar days, counting from the date<br/>after\n                     issue of notification to applicants regarding which applicants have been prequalified,\n                     cf.<br/>section 7, subsection 1 of the Act of the Act, if this notification includes\n                     a brief account of the<br/>relevant reasons for the decision. Other appeals must be\n                     submitted to the Complaint Board for<br/>Public Procurement within 45 calendar days\n                     after publication of announcements on a<br/>concluded contract in the Official Journal\n                     of the European Union.<br/></span></section>\n               <section><span class=\"label\">Organisation, der leverer supplerende oplysninger om udbudsproceduren</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation, der leverer yderligere oplysninger om klageprocedurerne</span><span class=\"text\">: </span><span class=\"value\">Konkurrence og Forbrugerstyrelsen</span><span class=\"value\"></span></section>\n            </section>\n         </section>\n      </section>\n      <section>6&nbsp;<span class=\"label\">Resultater</span><section><span class=\"label\">Værdien af alle kontrakter tildelt i denne bekendtgørelse</span><span class=\"text\">: </span><span class=\"value\">900.000.000</span><span class=\"text\"> </span><span class=\"label\">Dansk krone</span></section>\n         <section>6.1&nbsp;<span class=\"label\">Resultat delkontrakt-ID</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span><section><span class=\"dynamic-label\">Der er udvalgt mindst én vinder.</span></section>\n            <section>6.1.2&nbsp;<span class=\"label\">Oplysninger om vinderne</span><section><span class=\"label\">Vinder</span><span class=\"text\">:</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">MT Højgaard Danmark A/S</span></section>\n                  <section><span class=\"label\">Tilbud</span><span class=\"text\">:</span></section>\n                  <section><span class=\"label\">Tilbud – Identifikator</span><span class=\"text\">: </span><span class=\"value\">Cityringen Extension Nordhavn - Early Contractor Involvement</span></section>\n                  <section><span class=\"label\">ID for delkontrakt eller gruppe af delkontrakter</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span></section>\n                  <section><span class=\"label\">Værdien af tilbuddet</span><span class=\"text\">: </span><span class=\"value\">900.000.000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Dansk krone</span></section>\n                  <section><span class=\"label\">Tilbuddet er et alternativt tilbud</span><span class=\"text\">: </span><span class=\"label\">nej</span></section>\n                  <section><span class=\"label\">Underentreprise</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nej</span></section>\n                  <section><span class=\"label\">Kontraktoplysninger</span><span class=\"text\">:</span><section><span class=\"label\">Identifikator for kontrakten</span><span class=\"text\">: </span><span class=\"value\">Cityringen Extension Nordhavn - Early Contractor Involvement</span></section>\n                     <section><span class=\"label\">Dato for indgåelse af kontrakten</span><span class=\"text\">: </span><span class=\"value\">30-09-2025</span></section>\n                  </section>\n               </section>\n            </section>\n            <section>6.1.4&nbsp;<span class=\"label\">Statistiske oplysninger</span><section><span class=\"label\">Modtagne tilbud og ansøgninger om deltagelse</span><span class=\"text\">:</span><section><span class=\"label\">Type modtagne indgivelser</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tilbud</span><section><span class=\"label\">Antal modtagne tilbud og ansøgninger om deltagelse</span><span class=\"text\">: </span><span class=\"value\">3</span></section>\n                  </section>\n               </section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisationer</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">30823699</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Enhed</span><span class=\"text\">: </span><span class=\"value\">Vibeke Jessen</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">vij@m.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">72424802</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">www.m.dk</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Køber</span></section>\n               <section><span class=\"label\">Organisation, der leverer supplerende oplysninger om udbudsproceduren</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0005</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for udbud</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nordjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK050</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">klfu@naevneneshus.dk</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">www.m.dk</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation med ansvar for klager</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0007</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Konkurrence og Forbrugerstyrelsen</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">10294819</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Carl Jakobsensvej 35</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Valby</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2500</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">www.kfst.dk</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation, der leverer yderligere oplysninger om klageprocedurerne</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0008</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">MT Højgaard Danmark A/S</span></section>\n            <section><span class=\"label\">Den økonomiske operatørs størrelse</span><span class=\"text\">: </span><span class=\"label\">Stor virksomhed</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">12562233</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Knud Højgaards Vej 7</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Søborg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2860</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">www.mth.dk</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Tilbudsgiver</span></section>\n               <section><span class=\"label\">Vinder af disse delkontrakter</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0000</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Publications Office of the European Union</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">PUBL</span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Luxembourg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2417</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">LU000</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">ted@publications.europa.eu</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+352 29291</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://op.europa.eu</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n      </section>\n      <section><span class=\"label\">Oplysninger om bekendtgørelsen</span><section><span class=\"label\">Bekendtgørelsens ID</span><span class=\"text\">: </span><span class=\"value\">661d9a4d-d0be-448f-ac58-ebdefe947e83</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n         <section><span class=\"label\">Formulartype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Resultater</span></section>\n         <section><span class=\"label\">Bekendtgørelsestype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bekendtgørelse om indgåede kontrakter eller koncessionstildeling – standardordningen</span></section>\n         <section><span class=\"label\">Afsendelsesdato for bekendtgørelsen</span><span class=\"text\">: </span><span class=\"value\">30-01-2026</span><span class=\"text\"> </span><span class=\"value\">11:58 +00:00</span></section>\n         <section><span class=\"label\">Bekendtgørelsens officielle sprog</span><span class=\"text\">: </span><span class=\"dynamic-label\">engelsk</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         <section><span class=\"label\">Bekendtgørelsesnummer</span><span class=\"text\">: </span><span class=\"value\">00072502-2026</span></section>\n         <section><span class=\"label\">EUT-S-nummer</span><span class=\"text\">: </span><span class=\"value\">22/2026</span></section>\n         <section><span class=\"label\">Offentliggørelsesdato</span><span class=\"text\">: </span><span class=\"value\">02-02-2026</span></section>\n      </section>\n   </body>\n</html>","htmlEN":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Buyer</span><section>1.1&nbsp;<span class=\"label\">Buyer</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span></section>\n            <section><span class=\"label\">Legal type of the buyer</span><span class=\"text\">: </span><span class=\"dynamic-label\">Body governed by public law</span></section>\n            <section><span class=\"label\">Activity of the contracting authority</span><span class=\"text\">: </span><span class=\"dynamic-label\">General public services</span></section>\n            <section><span class=\"label\">Activity of the contracting entity</span><span class=\"text\">: </span><span class=\"dynamic-label\">Urban railway, tramway, trolleybus or bus services</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Cityring Extension Nordhavn Early Contractor Involvement</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet is tendering for an extension of the Cityringen M4 metro to Nordhavn\n                  (CRNHE). CRNHE will consists of two metro-stations from Orientkaj to outer Nordhavn.\n                  CRNHE is planned as an elevated line. The metro line will be crossing Skudeløbet in\n                  Nordhavn. The extension is expected to ready to open in 2030. The existing M4 line\n                  in Nordhavn is an attractive and function part of the network, but the CRNHE project\n                  aims to improve in terms of sustainability, passenger experience and operation. The\n                  project is divided into two major contracts: Integrated Works Contract (IWC Contract)\n                  – This contract overall covers design, civil works, permanent way and access control\n                  and is procured by this contract notice. For further details on the services and works\n                  included in the contract see below and for at detailed description please refer to:\n                  Scope of Works, doc id.CR-MS-GEN=NHE-CG-CONSPE-000004. Transportation System Contract\n                  (TS-contractor) - all other transportation systems. Besides the two major contracts\n                  Metroselskabet will be entering into contract with different consultants on other\n                  parts of the project, such as Areas and Rights, Environmental Impact Assessment consultancy\n                  etc. The IWC contract covers the following disciplines: Viaducts &amp; elevated structures,\n                  including sub-structure Elevated Stations Temporary works for completion of the permanent\n                  works. Architectural Finishes Sustainability &amp; Carbon Initiatives Alignment &amp; Permanent\n                  way Noise screens, noise &amp; vibration monitoring and mitigation Geology &amp; Hydrogeology\n                  Technical Buildings &amp; installations Electrical Works &amp; Power Supply for stations and\n                  elevated structures Mechanical Works for stations and elevated structures Access Control\n                  Traction Power (3rd rail) Interface to SCADA Preparatory Works Technical Safety (Jernbanesikkerhed)\n                  Technical Interfaces Finishing Works Worksites Identification &amp; planning for utility\n                  relocation Climate Protection Strategy Environmental Management Risk Management Interfaces\n                  with city development, Østlig Ringvej. Construction Programming Construction Budgeting\n                  The IWC might also be asked to do some early works, such as diversion of utilities\n                  and public road diversions, certain utility diversions, demolition or other tasks\n                  identified as part of the collaboration phase. CRNHE is one of the first larger projects\n                  where Metroselskabet´s ambitions of reducing the climate impact by 50% will be a significant\n                  factor impacting the solution of the project. And Metroselskabet would like to benefit\n                  from the contractor´s knowledge and experiences with the construction industry. Metroselskabet\n                  has Page 1/13 74244-2025assessed that to achieve the reduction of the climate footprint\n                  it is necessary for Metroselskabet and the contractor to work very closely together\n                  by bringing in the contractor and his design team (Integrated Works Contractor) at\n                  a very early stage of the project. Thus, Metroselskabet has decided to procure the\n                  CRNHE as an Early Contractor Involvement (ECI) project. After the designing of the\n                  metro line, Metroselskabet will enter into a Design and Build contract (based on ABT18)\n                  with the Integrated Works Contractor (IWC) The project is divided into two main phases\n                  with underlying stages and gate stages: Phase 1: Collaboration Phase – A phase where\n                  the project will be designed and developed in close collaboration between Metroselskabet,\n                  the Integrated Works Contractor. The collaboration Phase is contractually regulated\n                  by a collaboration agreement, Collaboration Terms and Conditions, doc. id. CR-MSGEN=NHE-CG-CON-SPE-000002-ATT14\n                  and a conditional Design and Build contract (ABT18). doc. id CR-MS-GEN=NHE-CG-CON-SPE-000002.\n                  The collaboration agreement can be terminated by the Integrated Works Contractor and/or\n                  Metroselskabet at convenience. The conditioned ABT18 contract will enter into force\n                  if the pre-requisites, are met. Please Refer to the Design and Build Contract, doc\n                  id: CR-MS-GEN=NHE-CG-CON-SPE-000002, section 1.1. In the collaboration phase the Integrated\n                  Works Contractor is liable for the design as well as the time schedule, pricing and\n                  constructability of the project. Also, the contractor should focus on ensuring a close\n                  collaboration with the Transportation System contractor, EIA consultant, the Areas\n                  and Rights consultant and possible early works contractors. The engineers and the\n                  architects of the Integrated Works Contractor are expected to focus on the development\n                  of the design, reducing carbon emissions and improving passenger experience. Phase\n                  2: Construction Phase – After signing the ABT18 contract, the project moves into the\n                  construction phase. The Construction consists of a detailed design stage and a construction\n                  stage. In the construction phase the Integrated Works Contractor is expected (among\n                  other things) to keep focus on collaborating closely with Metroselskabet and the Transportation\n                  System contractor, reducing the carbon footprint, time, costs and quality during construction\n                  The applicant should apply for prequalification with a design team - both architects\n                  and engineering discipline consultants. Metroselskabet will focus on the architectural\n                  appearance and materiality proposed for the two new stations. The architecture should\n                  comply with the ambition of significantly reducing the carbon footprint. Metroselskabet\n                  would like to be challenged by the architects of the two new stations and the possibility\n                  for development under /over the viaduct. The applicant is encouraged to include an\n                  architect with substantial experience with similar complex and onerous functional\n                  type projects, yet providing creative and innovative architectural solutions, while\n                  maintaining high level of functional clarity in the design.</span></section>\n            <section><span class=\"label\">Procedure identifier</span><span class=\"text\">: </span><span class=\"value\">9b1eb410-2e55-4914-9510-ac8b58171104</span></section>\n            <section><span class=\"label\">Previous notice</span><span class=\"text\">: </span><span class=\"value\">74244-2025</span></section>\n            <section><span class=\"label\">Type of procedure</span><span class=\"text\">: </span><span class=\"dynamic-label\">Competitive dialogue</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Works</span></section>\n               <section><span class=\"label\">Additional nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Services</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45230000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n               <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n               <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            </section>\n            <section>2.1.3&nbsp;<span class=\"label\">Value</span><section><span class=\"label\">Estimated value excluding VAT</span><span class=\"text\">: </span><span class=\"value\">900.000.000</span><span class=\"text\"> </span><span class=\"label\">Danish krone</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Legal basis</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Directive 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>5&nbsp;<span class=\"label\">Lot</span><section>5.1&nbsp;<span class=\"label\">Lot</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Cityringen Extension Nordhavn Early Contractor Involvement</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet is tendering for an extension of the Cityringen M4 metro to Nordhavn\n                  (CRNHE). CRNHE will consists of two metro-stations from Orientkaj to outer Nordhavn.\n                  CRNHE is planned as an elevated line. The metro line will be crossing Skudeløbet in\n                  Nordhavn. The extension is expected to ready to open in 2030. The existing M4 line\n                  in Nordhavn is an attractive and function part of the network, but the CRNHE project\n                  aims to improve in terms of sustainability, passenger experience and operation. The\n                  project is divided into two major contracts: Integrated Works Contract (IWC Contract)\n                  – This contract overall covers design, civil works, permanent way and access control\n                  and is procured by this contract notice. For further details on the services and works\n                  included in the contract see below and for at detailed description please refer to:\n                  Scope of Works, doc id.CR-MS-GEN=NHE-CG-CONSPE-000004. Transportation System Contract\n                  (TS-contractor) - all other transportation systems. Besides the two major contracts\n                  Metroselskabet will be entering into contract with different consultants on other\n                  parts of the project, such as Areas and Rights, Environmental Impact Assessment consultancy\n                  etc. The IWC contract covers the following disciplines: Viaducts &amp; elevated structures,\n                  including sub-structure Elevated Stations Temporary works for completion of the permanent\n                  works. Architectural Finishes Sustainability &amp; Carbon Initiatives Alignment &amp; Permanent\n                  way Noise screens, noise &amp; vibration monitoring and mitigation Geology &amp; Hydrogeology\n                  Technical Buildings &amp; installations Electrical Works &amp; Power Supply for stations and\n                  elevated structures Mechanical Works for stations and elevated structures Access Control\n                  Traction Power (3rd rail) Interface to SCADA Preparatory Works Technical Safety (Jernbanesikkerhed)\n                  Technical Interfaces Finishing Works Worksites Identification &amp; planning for utility\n                  relocation Climate Protection Strategy Environmental Management Risk Management Interfaces\n                  with city development, Østlig Ringvej. Construction Programming Construction Budgeting\n                  The IWC might also be asked to do some early works, such as diversion of utilities\n                  and public road diversions, certain utility diversions, demolition or other tasks\n                  identified as part of the collaboration phase. CRNHE is one of the first larger projects\n                  where Metroselskabet´s ambitions of reducing the climate impact by 50% will be a significant\n                  factor impacting the solution of the project. And Metroselskabet would like to benefit\n                  from the contractor´s knowledge and experiences with the construction industry. Metroselskabet\n                  has Page 1/13 74244-2025assessed that to achieve the reduction of the climate footprint\n                  it is necessary for Metroselskabet and the contractor to work very closely together\n                  by bringing in the contractor and his design team (Integrated Works Contractor) at\n                  a very early stage of the project. Thus, Metroselskabet has decided to procure the\n                  CRNHE as an Early Contractor Involvement (ECI) project. After the designing of the\n                  metro line, Metroselskabet will enter into a Design and Build contract (based on ABT18)\n                  with the Integrated Works Contractor (IWC) The project is divided into two main phases\n                  with underlying stages and gate stages: Phase 1: Collaboration Phase – A phase where\n                  the project will be designed and developed in close collaboration between Metroselskabet,\n                  the Integrated Works Contractor. The collaboration Phase is contractually regulated\n                  by a collaboration agreement, Collaboration Terms and Conditions, doc. id. CR-MSGEN=NHE-CG-CON-SPE-000002-ATT14\n                  and a conditional Design and Build contract (ABT18). doc. id CR-MS-GEN=NHE-CG-CON-SPE-000002.\n                  The collaboration agreement can be terminated by the Integrated Works Contractor and/or\n                  Metroselskabet at convenience. The conditioned ABT18 contract will enter into force\n                  if the pre-requisites, are met. Please Refer to the Design and Build Contract, doc\n                  id: CR-MS-GEN=NHE-CG-CON-SPE-000002, section 1.1. In the collaboration phase the Integrated\n                  Works Contractor is liable for the design as well as the time schedule, pricing and\n                  constructability of the project. Also, the contractor should focus on ensuring a close\n                  collaboration with the Transportation System contractor, EIA consultant, the Areas\n                  and Rights consultant and possible early works contractors. The engineers and the\n                  architects of the Integrated Works Contractor are expected to focus on the development\n                  of the design, reducing carbon emissions and improving passenger experience. Phase\n                  2: Construction Phase – After signing the ABT18 contract, the project moves into the\n                  construction phase. The Construction consists of a detailed design stage and a construction\n                  stage. In the construction phase the Integrated Works Contractor is expected (among\n                  other things) to keep focus on collaborating closely with Metroselskabet and the Transportation\n                  System contractor, reducing the carbon footprint, time, costs and quality during construction\n                  The applicant should apply for prequalification with a design team - both architects\n                  and engineering discipline consultants. Metroselskabet will focus on the architectural\n                  appearance and materiality proposed for the two new stations. The architecture should\n                  comply with the ambition of significantly reducing the carbon footprint. Metroselskabet\n                  would like to be challenged by the architects of the two new stations and the possibility\n                  for development under /over the viaduct. The applicant is encouraged to include an\n                  architect with substantial experience with similar complex and onerous functional\n                  type projects, yet providing creative and innovative architectural solutions, while\n                  maintaining high level of functional clarity in the design.</span></section>\n            <section>5.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Works</span></section>\n               <section><span class=\"label\">Additional nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Services</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45230000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork</span></section>\n            </section>\n            <section>5.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">København</span></section>\n               <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n               <section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\"></span></section>\n            </section>\n            <section>5.1.3&nbsp;<span class=\"label\">Estimated duration</span><section><span class=\"label\">Start date</span><span class=\"text\">: </span><span class=\"value\">30-09-2025</span></section>\n               <section><span class=\"label\">Duration</span><span class=\"text\">: </span><span class=\"value\">6</span><span class=\"text\"> </span><span class=\"label\">Year</span></section>\n            </section>\n            <section>5.1.6&nbsp;<span class=\"label\">General information</span><section><span class=\"dynamic-label\">Procurement Project not financed with EU Funds.</span></section>\n               <section><span class=\"label\">The procurement is covered by the Government Procurement Agreement (GPA)</span><span class=\"text\">: </span><span class=\"label\">yes</span></section>\n               <section><span class=\"label\">Information about previous notices</span><span class=\"text\">:</span><section><span class=\"label\">Identifier of the previous notice</span><span class=\"text\">: </span><span class=\"value\">74244-2025</span></section>\n               </section>\n            </section>\n            <section>5.1.10&nbsp;<span class=\"label\">Award criteria</span><section><span class=\"label\">Criterion</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Quality</span></section>\n                  <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Collaboration</span></section>\n               </section>\n               <section><span class=\"label\">Criterion</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Quality</span></section>\n                  <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Processes</span></section>\n               </section>\n               <section><span class=\"label\">Criterion</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Quality</span></section>\n                  <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Key personnel and Organisation</span></section>\n               </section>\n               <section><span class=\"label\">Criterion</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Price</span></section>\n                  <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Hourly Rates</span></section>\n               </section>\n               <section><span class=\"label\">Criterion</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Price</span></section>\n                  <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Overhead and Profit</span></section>\n               </section>\n               <section><span class=\"label\">Criterion</span><span class=\"text\">:</span><section><span class=\"label\">Type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Price</span></section>\n                  <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Schedule of Prices</span></section>\n               </section>\n            </section>\n            <section>5.1.15&nbsp;<span class=\"label\">Techniques</span><section><span class=\"label\">Framework agreement</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No framework agreement</span></section>\n               </section>\n               <section><span class=\"label\">Information about the dynamic purchasing system</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No dynamic purchase system</span></section>\n               </section>\n            </section>\n            <section>5.1.16&nbsp;<span class=\"label\">Further information, mediation and review</span><section><span class=\"label\">Review organisation</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for udbud</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Information about review deadlines</span><span class=\"text\">: </span><span class=\"value\">In accordance with Act no 492 of 12 May 2010 with subsequent<br/>amendments appeals\n                     regarding failure to become pre-qualified shall be submitted to the<br/>Complaint\n                     Board for Public Procurements within 20 calendar days, counting from the date<br/>after\n                     issue of notification to applicants regarding which applicants have been prequalified,\n                     cf.<br/>section 7, subsection 1 of the Act of the Act, if this notification includes\n                     a brief account of the<br/>relevant reasons for the decision. Other appeals must be\n                     submitted to the Complaint Board for<br/>Public Procurement within 45 calendar days\n                     after publication of announcements on a<br/>concluded contract in the Official Journal\n                     of the European Union.<br/></span></section>\n               <section><span class=\"label\">Organisation providing additional information about the procurement procedure</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation providing more information on the review procedures</span><span class=\"text\">: </span><span class=\"value\">Konkurrence og Forbrugerstyrelsen</span><span class=\"value\"></span></section>\n            </section>\n         </section>\n      </section>\n      <section>6&nbsp;<span class=\"label\">Results</span><section><span class=\"label\">Value of all contracts awarded in this notice</span><span class=\"text\">: </span><span class=\"value\">900.000.000</span><span class=\"text\"> </span><span class=\"label\">Danish krone</span></section>\n         <section>6.1&nbsp;<span class=\"label\">Result lot identifier</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span><section><span class=\"dynamic-label\">At least one winner was chosen.</span></section>\n            <section>6.1.2&nbsp;<span class=\"label\">Information about winners</span><section><span class=\"label\">Winner</span><span class=\"text\">:</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">MT Højgaard Danmark A/S</span></section>\n                  <section><span class=\"label\">Tender</span><span class=\"text\">:</span></section>\n                  <section><span class=\"label\">Tender identifier</span><span class=\"text\">: </span><span class=\"value\">Cityringen Extension Nordhavn - Early Contractor Involvement</span></section>\n                  <section><span class=\"label\">Identifier of lot or group of lots</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span></section>\n                  <section><span class=\"label\">Value of the tender</span><span class=\"text\">: </span><span class=\"value\">900.000.000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Danish krone</span></section>\n                  <section><span class=\"label\">The tender is a variant</span><span class=\"text\">: </span><span class=\"label\">no</span></section>\n                  <section><span class=\"label\">Subcontracting</span><span class=\"text\">: </span><span class=\"dynamic-label\">No</span></section>\n                  <section><span class=\"label\">Contract information</span><span class=\"text\">:</span><section><span class=\"label\">Identifier of the contract</span><span class=\"text\">: </span><span class=\"value\">Cityringen Extension Nordhavn - Early Contractor Involvement</span></section>\n                     <section><span class=\"label\">Date of the conclusion of the contract</span><span class=\"text\">: </span><span class=\"value\">30-09-2025</span></section>\n                  </section>\n               </section>\n            </section>\n            <section>6.1.4&nbsp;<span class=\"label\">Statistical information</span><section><span class=\"label\">Received tenders or requests to participate</span><span class=\"text\">:</span><section><span class=\"label\">Type of received submissions</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tenders</span><section><span class=\"label\">Number of tenders or requests to participate received</span><span class=\"text\">: </span><span class=\"value\">3</span></section>\n                  </section>\n               </section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisations</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">30823699</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Contact point</span><span class=\"text\">: </span><span class=\"value\">Vibeke Jessen</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">vij@m.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">72424802</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">www.m.dk</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Buyer</span></section>\n               <section><span class=\"label\">Organisation providing additional information about the procurement procedure</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0005</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for udbud</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nordjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK050</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">klfu@naevneneshus.dk</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">www.m.dk</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Review organisation</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0007</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Konkurrence og Forbrugerstyrelsen</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">10294819</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Carl Jakobsensvej 35</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Valby</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2500</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">www.kfst.dk</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Organisation providing more information on the review procedures</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0008</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">MT Højgaard Danmark A/S</span></section>\n            <section><span class=\"label\">Size of the economic operator</span><span class=\"text\">: </span><span class=\"label\">Large</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">12562233</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Knud Højgaards Vej 7</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Søborg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2860</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">www.mth.dk</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Tenderer</span></section>\n               <section><span class=\"label\">Winner of these lots</span><span class=\"text\">: </span><span class=\"value\">LOT-0001</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0000</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Publications Office of the European Union</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">PUBL</span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Luxembourg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2417</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">LU000</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">ted@publications.europa.eu</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+352 29291</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://op.europa.eu</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n      </section>\n      <section><span class=\"label\">Notice information</span><section><span class=\"label\">Notice identifier/version</span><span class=\"text\">: </span><span class=\"value\">661d9a4d-d0be-448f-ac58-ebdefe947e83</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n         <section><span class=\"label\">Form type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Result</span></section>\n         <section><span class=\"label\">Notice type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Contract or concession award notice – standard regime</span></section>\n         <section><span class=\"label\">Notice dispatch date</span><span class=\"text\">: </span><span class=\"value\">30-01-2026</span><span class=\"text\"> </span><span class=\"value\">11:58 +00:00</span></section>\n         <section><span class=\"label\">Languages in which this notice is officially available</span><span class=\"text\">: </span><span class=\"dynamic-label\">English</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         <section><span class=\"label\">Notice publication number</span><span class=\"text\">: </span><span class=\"value\">00072502-2026</span></section>\n         <section><span class=\"label\">OJ S issue number</span><span class=\"text\">: </span><span class=\"value\">22/2026</span></section>\n         <section><span class=\"label\">Publication date</span><span class=\"text\">: </span><span class=\"value\">02-02-2026</span></section>\n      </section>\n   </body>\n</html>","opsummeringDA":{"card":{"titel":"Cityring Extension Nordhavn Early Contractor Involvement","ordregiver":"Metroselskabet I/S ","ordregiverId":"30823699","ordregiverIdDatavasket":"30823699","publiceringsdato":"2026-02-02+01:00","cpvKode":"45000000","cpvTitel":"Bygge- og anlægsarbejder","formulartype":"Resultater","formulartypeKode":"result","tidsfrister":[],"alleOrdregivere":["Metroselskabet I/S "],"anslaaetVaerdi":"900000000","anslaaetVaerdiValuta":"DKK","beskrivelse":"Metroselskabet is tendering for an extension of the Cityringen M4 metro to Nordhavn (CRNHE). CRNHE will consists of two metro-stations from Orientkaj to outer Nordhavn. CRNHE is planned as an elevated line. The metro line will be crossing Skudeløbet in Nordhavn. The extension is expected to ready to open in 2030. The existing M4 line in Nordhavn is an attractive and function part of the network, but the CRNHE project aims to improve in terms of sustainability, passenger experience and operation. The project is divided into two major contracts: Integrated Works Contract (IWC Contract) – This contract overall covers design, civil works, permanent way and access control and is procured by this contract notice. For further details on the services and works included in the contract see below and for at detailed description please refer to: Scope of Works, doc id.CR-MS-GEN=NHE-CG-CONSPE-000004. Transportation System Contract (TS-contractor) - all other transportation systems. Besides the two major contracts Metroselskabet will be entering into contract with different consultants on other parts of the project, such as Areas and Rights, Environmental Impact Assessment consultancy etc. The IWC contract covers the following disciplines: Viaducts & elevated structures, including sub-structure Elevated Stations Temporary works for completion of the permanent works. Architectural Finishes Sustainability & Carbon Initiatives Alignment & Permanent way Noise screens, noise & vibration monitoring and mitigation Geology & Hydrogeology Technical Buildings & installations Electrical Works & Power Supply for stations and elevated structures Mechanical Works for stations and elevated structures Access Control Traction Power (3rd rail) Interface to SCADA Preparatory Works Technical Safety (Jernbanesikkerhed) Technical Interfaces Finishing Works Worksites Identification & planning for utility relocation Climate Protection Strategy Environmental Management Risk Management Interfaces with city development, Østlig Ringvej. Construction Programming Construction Budgeting The IWC might also be asked to do some early works, such as diversion of utilities and public road diversions, certain utility diversions, demolition or other tasks identified as part of the collaboration phase. CRNHE is one of the first larger projects where Metroselskabet´s ambitions of reducing the climate impact by 50% will be a significant factor impacting the solution of the project. And Metroselskabet would like to benefit from the contractor´s knowledge and experiences with the construction industry. Metroselskabet has Page 1/13 74244-2025assessed that to achieve the reduction of the climate footprint it is necessary for Metroselskabet and the contractor to work very closely together by bringing in the contractor and his design team (Integrated Works Contractor) at a very early stage of the project. Thus, Metroselskabet has decided to procure the CRNHE as an Early Contractor Involvement (ECI) project. After the designing of the metro line, Metroselskabet will enter into a Design and Build contract (based on ABT18) with the Integrated Works Contractor (IWC) The project is divided into two main phases with underlying stages and gate stages: Phase 1: Collaboration Phase – A phase where the project will be designed and developed in close collaboration between Metroselskabet, the Integrated Works Contractor. The collaboration Phase is contractually regulated by a collaboration agreement, Collaboration Terms and Conditions, doc. id. CR-MSGEN=NHE-CG-CON-SPE-000002-ATT14 and a conditional Design and Build contract (ABT18). doc. id CR-MS-GEN=NHE-CG-CON-SPE-000002. The collaboration agreement can be terminated by the Integrated Works Contractor and/or Metroselskabet at convenience. The conditioned ABT18 contract will enter into force if the pre-requisites, are met. Please Refer to the Design and Build Contract, doc id: CR-MS-GEN=NHE-CG-CON-SPE-000002, section 1.1. In the collaboration phase the Integrated Works Contractor is liable for the design as well as the time schedule, pricing and constructability of the project. Also, the contractor should focus on ensuring a close collaboration with the Transportation System contractor, EIA consultant, the Areas and Rights consultant and possible early works contractors. The engineers and the architects of the Integrated Works Contractor are expected to focus on the development of the design, reducing carbon emissions and improving passenger experience. Phase 2: Construction Phase – After signing the ABT18 contract, the project moves into the construction phase. The Construction consists of a detailed design stage and a construction stage. In the construction phase the Integrated Works Contractor is expected (among other things) to keep focus on collaborating closely with Metroselskabet and the Transportation System contractor, reducing the carbon footprint, time, costs and quality during construction The applicant should apply for prequalification with a design team - both architects and engineering discipline consultants. Metroselskabet will focus on the architectural appearance and materiality proposed for the two new stations. The architecture should comply with the ambition of significantly reducing the carbon footprint. Metroselskabet would like to be challenged by the architects of the two new stations and the possibility for development under /over the viaduct. The applicant is encouraged to include an architect with substantial experience with similar complex and onerous functional type projects, yet providing creative and innovative architectural solutions, while maintaining high level of functional clarity in the design.","bkSubTypeKode":"30","bkSubType":"Bekendtgørelse om indgåede kontrakter – sektordirektivet, standardordningen","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":["DK011"],"udforelsesstedSubLand":["Byen København"],"udforelsesstedLand":["Danmark"],"udforelsesstedBy":["København S"],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"svarfrister":[],"antalParts":0,"antalLots":1,"udbudsDokumenter":[]},"opsummeringEN":{"card":{"titel":"Cityring Extension Nordhavn Early Contractor Involvement","ordregiver":"Metroselskabet I/S ","ordregiverId":"30823699","ordregiverIdDatavasket":"30823699","publiceringsdato":"2026-02-02+01:00","cpvKode":"45000000","cpvTitel":"Construction work","formulartype":"Result","formulartypeKode":"result","tidsfrister":[],"alleOrdregivere":["Metroselskabet I/S "],"anslaaetVaerdi":"900000000","anslaaetVaerdiValuta":"DKK","beskrivelse":"Metroselskabet is tendering for an extension of the Cityringen M4 metro to Nordhavn (CRNHE). CRNHE will consists of two metro-stations from Orientkaj to outer Nordhavn. CRNHE is planned as an elevated line. The metro line will be crossing Skudeløbet in Nordhavn. The extension is expected to ready to open in 2030. The existing M4 line in Nordhavn is an attractive and function part of the network, but the CRNHE project aims to improve in terms of sustainability, passenger experience and operation. The project is divided into two major contracts: Integrated Works Contract (IWC Contract) – This contract overall covers design, civil works, permanent way and access control and is procured by this contract notice. For further details on the services and works included in the contract see below and for at detailed description please refer to: Scope of Works, doc id.CR-MS-GEN=NHE-CG-CONSPE-000004. Transportation System Contract (TS-contractor) - all other transportation systems. Besides the two major contracts Metroselskabet will be entering into contract with different consultants on other parts of the project, such as Areas and Rights, Environmental Impact Assessment consultancy etc. The IWC contract covers the following disciplines: Viaducts & elevated structures, including sub-structure Elevated Stations Temporary works for completion of the permanent works. Architectural Finishes Sustainability & Carbon Initiatives Alignment & Permanent way Noise screens, noise & vibration monitoring and mitigation Geology & Hydrogeology Technical Buildings & installations Electrical Works & Power Supply for stations and elevated structures Mechanical Works for stations and elevated structures Access Control Traction Power (3rd rail) Interface to SCADA Preparatory Works Technical Safety (Jernbanesikkerhed) Technical Interfaces Finishing Works Worksites Identification & planning for utility relocation Climate Protection Strategy Environmental Management Risk Management Interfaces with city development, Østlig Ringvej. Construction Programming Construction Budgeting The IWC might also be asked to do some early works, such as diversion of utilities and public road diversions, certain utility diversions, demolition or other tasks identified as part of the collaboration phase. CRNHE is one of the first larger projects where Metroselskabet´s ambitions of reducing the climate impact by 50% will be a significant factor impacting the solution of the project. And Metroselskabet would like to benefit from the contractor´s knowledge and experiences with the construction industry. Metroselskabet has Page 1/13 74244-2025assessed that to achieve the reduction of the climate footprint it is necessary for Metroselskabet and the contractor to work very closely together by bringing in the contractor and his design team (Integrated Works Contractor) at a very early stage of the project. Thus, Metroselskabet has decided to procure the CRNHE as an Early Contractor Involvement (ECI) project. After the designing of the metro line, Metroselskabet will enter into a Design and Build contract (based on ABT18) with the Integrated Works Contractor (IWC) The project is divided into two main phases with underlying stages and gate stages: Phase 1: Collaboration Phase – A phase where the project will be designed and developed in close collaboration between Metroselskabet, the Integrated Works Contractor. The collaboration Phase is contractually regulated by a collaboration agreement, Collaboration Terms and Conditions, doc. id. CR-MSGEN=NHE-CG-CON-SPE-000002-ATT14 and a conditional Design and Build contract (ABT18). doc. id CR-MS-GEN=NHE-CG-CON-SPE-000002. The collaboration agreement can be terminated by the Integrated Works Contractor and/or Metroselskabet at convenience. The conditioned ABT18 contract will enter into force if the pre-requisites, are met. Please Refer to the Design and Build Contract, doc id: CR-MS-GEN=NHE-CG-CON-SPE-000002, section 1.1. In the collaboration phase the Integrated Works Contractor is liable for the design as well as the time schedule, pricing and constructability of the project. Also, the contractor should focus on ensuring a close collaboration with the Transportation System contractor, EIA consultant, the Areas and Rights consultant and possible early works contractors. The engineers and the architects of the Integrated Works Contractor are expected to focus on the development of the design, reducing carbon emissions and improving passenger experience. Phase 2: Construction Phase – After signing the ABT18 contract, the project moves into the construction phase. The Construction consists of a detailed design stage and a construction stage. In the construction phase the Integrated Works Contractor is expected (among other things) to keep focus on collaborating closely with Metroselskabet and the Transportation System contractor, reducing the carbon footprint, time, costs and quality during construction The applicant should apply for prequalification with a design team - both architects and engineering discipline consultants. Metroselskabet will focus on the architectural appearance and materiality proposed for the two new stations. The architecture should comply with the ambition of significantly reducing the carbon footprint. Metroselskabet would like to be challenged by the architects of the two new stations and the possibility for development under /over the viaduct. The applicant is encouraged to include an architect with substantial experience with similar complex and onerous functional type projects, yet providing creative and innovative architectural solutions, while maintaining high level of functional clarity in the design.","bkSubTypeKode":"30","bkSubType":"Contract award notice – sectoral directive, standard regime","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":["DK011"],"udforelsesstedSubLand":["Byen København"],"udforelsesstedLand":["Denmark"],"udforelsesstedBy":["København S"],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"svarfrister":[],"antalParts":0,"antalLots":1,"udbudsDokumenter":[]}}