{"bekendtgoerelseNoegle":{"noticeId":{"value":"3e9b5981-843a-4a0e-82cf-f6e68e3c6513"},"noticeVersion":{"value":"01"},"noticePublicationNumber":{"value":"00602840-2026"}},"htmlDA":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Køber</span><section>1.1&nbsp;<span class=\"label\">Køber</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Energinet</span></section>\n            <section><span class=\"label\">Køberens retlige status</span><span class=\"text\">: </span><span class=\"dynamic-label\">Offentlig virksomhed</span></section>\n            <section><span class=\"label\">Den ordregivende enheds aktiviteter</span><span class=\"text\">: </span><span class=\"dynamic-label\">Elektricitetsrelaterede aktiviteter</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Market dialogue regarding Emergency Power Systems for Energinet’s stations - 26/14023</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Energinet is looking into procuring approximately 200 standardised Emergency Power\n                  Stations (EPS) for Energinet’s stations across Denmark. The solution is intended to\n                  ensure compliance with new regulatory requirements related to resilience and preparedness,\n                  while providing reliable emergency power supply at critical energy infrastructure.<br/><br/>Through\n                  this market dialogue, Energinet seeks input from the market regarding technical solutions,\n                  production and delivery capacity, lead times, pricing, sustainability aspects, and\n                  contractual considerations related to a large-scale deployment of standardised emergency\n                  power stations.<br/><br/>The purpose of the market dialogue is to engage with potential\n                  suppliers, gather market insights, understand available technologies and delivery\n                  models, assess implementation capabilities, and ensure compliance.<br/><br/><br/>Energinet\n                  welcomes participation from manufacturers, system integrators, and service providers\n                  with relevant experience in emergency power generation, containerized energy solutions\n                  (e-houses), monitoring and control systems, commissioning and lifecycle support services.<br/><br/><br/>The\n                  investment is established due to requirements from the Danish Executive Order on Resilience\n                  and Preparedness in the Energy Sector (Executive Order No. 260 of 6 March 2025), which\n                  establishes enhanced obligations for emergency power supply at critical energy infrastructure\n                  sites.<br/><br/><br/>The regulation requires operators to ensure continuous emergency\n                  power availability until normal grid supply has been restored.<br/><br/><br/>To meet\n                  these regulatory requirements, Energinet is planning a large-scale tender of standardized\n                  emergency power stations (EPS).<br/><br/><br/>Based on both technical and economic\n                  considerations, Energinet has identified diesel-powered emergency generator systems\n                  as a baseline solution capable of providing reliable emergency power for extended\n                  and undefined outage durations.<br/><br/><br/>The EPS shall be delivered in a single\n                  compact technical building, divided into a generator room and a control room. All\n                  associated equipment and components shall be integrated within the building and arranged\n                  to ensure safe and efficient operation and maintenance in accordance with Energinet's\n                  standards and requirements. This will be specified in the final upcoming tender.<br/><br/><br/>The\n                  currently reference solution consists of a standardized module including:<br/><br/>•\n                  A complete compact station that must be smaller than 30m2 and lower than 3m<br/><br/>•\n                  125 kVA diesel generator<br/><br/>• LV-switch board for, Automatic transfer functionality<br/><br/>•\n                  Remote monitoring capabilities<br/><br/>• Hard wire communication and SCADA-integration<br/><br/>•\n                  Fuel storage sufficient for more than 72 hours at 75% load of continuous operation<br/><br/>•\n                  Ventilation<br/><br/>• Maximum noise level 35db 3 meters from the e-house<br/><br/>•\n                  Security Class RS3/RS4<br/><br/>• Plug and play solution<br/><br/>• Marine graded<br/><br/><br/>The\n                  scope and the technical solution should be based on a set of detailed minimum functional\n                  requirements and must comply with the applicable legislation, regulations, and relevant\n                  industry standards. Energinet is interested in optimized and innovative approaches.<br/><br/><br/>The\n                  solution shall be designed to provide a robust, scalable, and standardized approach\n                  that can be deployed consistently across a large number of sites without modifications\n                  or the use of individually components.<br/><br/><br/>Expected timeframe:<br/><br/>Tender\n                  published End of 2026<br/><br/>Contract signing Q2, 2027<br/><br/>Delivery at site\n                  Q3 and Q4, 2027 and in 2028<br/><br/><br/>Participation in the market dialogue is\n                  voluntary and does not oblige suppliers to submit a tender in any subsequent tender\n                  procedure.<br/><br/>The process for the market dialogue is as follows:<br/><br/>1.\n                  Energinet requests an overall and concise written response to the market dialogue.\n                  Suppliers are kindly asked to complete Market dialogue Emergency Power Systems - Questions\n                  and answers (please see instructions in the document “Market dialogue regarding Emergency\n                  Power Systems for Energinet’s stations). Please respond to as many questions as possible.\n                  The submitted responses will not be shared with other potential suppliers and will\n                  be used solely by Energinet.<br/><br/>2. Energinet may decide to conduct a more in\n                  depth market dialogue in the form of meetings, which may be held either physically\n                  or via Microsoft Teams. Energinet reserves the right to select which suppliers will\n                  be invited to such meetings.<br/><br/>3. Any clarifying questions must be submitted\n                  via Comdia.<br/><br/>4. Written responses must be submitted in English via Comdia\n                  no later than 16th September 2026 at 13:00 (CET).<br/><br/>Energinet thanks you in\n                  advance for your participation in the market dialogue.<br/><br/>Energinet wishes to\n                  assure participating suppliers that all responses will be treated confidentially and\n                  used exclusively for Energinet’s internal purposes in connection with the preparation\n                  of potential future EU tender procedures concerning the relevant services.</span></section>\n            <section><span class=\"label\">Intern ID</span><span class=\"text\">: </span><span class=\"value\">790538</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Varer</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31127000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Nødstrømsanlæg</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31682500</span><span class=\"text\"> </span><span class=\"dynamic-label\">Elektrisk nødudstyr</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31122000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Generatoranlæg</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n               <section><span class=\"dynamic-label\">Hvor som helst i det pågældende land</span></section>\n               <section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\">Denmark</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Retsgrundlag</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Direktiv 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>3&nbsp;<span class=\"label\">Del</span><section>3.1&nbsp;<span class=\"label\">Del</span><span class=\"text\">: </span><span class=\"value\">PAR-0000</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Market dialogue regarding Emergency Power Systems for Energinet’s stations - 26/14023</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Energinet is looking into procuring approximately 200 standardised Emergency Power\n                  Stations (EPS) for Energinet’s stations across Denmark. The solution is intended to\n                  ensure compliance with new regulatory requirements related to resilience and preparedness,\n                  while providing reliable emergency power supply at critical energy infrastructure.<br/><br/>Through\n                  this market dialogue, Energinet seeks input from the market regarding technical solutions,\n                  production and delivery capacity, lead times, pricing, sustainability aspects, and\n                  contractual considerations related to a large-scale deployment of standardised emergency\n                  power stations.<br/><br/>The purpose of the market dialogue is to engage with potential\n                  suppliers, gather market insights, understand available technologies and delivery\n                  models, assess implementation capabilities, and ensure compliance.<br/><br/><br/>Energinet\n                  welcomes participation from manufacturers, system integrators, and service providers\n                  with relevant experience in emergency power generation, containerized energy solutions\n                  (e-houses), monitoring and control systems, commissioning and lifecycle support services.<br/><br/><br/>The\n                  investment is established due to requirements from the Danish Executive Order on Resilience\n                  and Preparedness in the Energy Sector (Executive Order No. 260 of 6 March 2025), which\n                  establishes enhanced obligations for emergency power supply at critical energy infrastructure\n                  sites.<br/><br/><br/>The regulation requires operators to ensure continuous emergency\n                  power availability until normal grid supply has been restored.<br/><br/><br/>To meet\n                  these regulatory requirements, Energinet is planning a large-scale tender of standardized\n                  emergency power stations (EPS).<br/><br/><br/>Based on both technical and economic\n                  considerations, Energinet has identified diesel-powered emergency generator systems\n                  as a baseline solution capable of providing reliable emergency power for extended\n                  and undefined outage durations.<br/><br/><br/>The EPS shall be delivered in a single\n                  compact technical building, divided into a generator room and a control room. All\n                  associated equipment and components shall be integrated within the building and arranged\n                  to ensure safe and efficient operation and maintenance in accordance with Energinet's\n                  standards and requirements. This will be specified in the final upcoming tender.<br/><br/><br/>The\n                  currently reference solution consists of a standardized module including:<br/><br/>•\n                  A complete compact station that must be smaller than 30m2 and lower than 3m<br/><br/>•\n                  125 kVA diesel generator<br/><br/>• LV-switch board for, Automatic transfer functionality<br/><br/>•\n                  Remote monitoring capabilities<br/><br/>• Hard wire communication and SCADA-integration<br/><br/>•\n                  Fuel storage sufficient for more than 72 hours at 75% load of continuous operation<br/><br/>•\n                  Ventilation<br/><br/>• Maximum noise level 35db 3 meters from the e-house<br/><br/>•\n                  Security Class RS3/RS4<br/><br/>• Plug and play solution<br/><br/>• Marine graded<br/><br/><br/>The\n                  scope and the technical solution should be based on a set of detailed minimum functional\n                  requirements and must comply with the applicable legislation, regulations, and relevant\n                  industry standards. Energinet is interested in optimized and innovative approaches.<br/><br/><br/>The\n                  solution shall be designed to provide a robust, scalable, and standardized approach\n                  that can be deployed consistently across a large number of sites without modifications\n                  or the use of individually components.<br/><br/><br/>Expected timeframe:<br/><br/>Tender\n                  published End of 2026<br/><br/>Contract signing Q2, 2027<br/><br/>Delivery at site\n                  Q3 and Q4, 2027 and in 2028<br/><br/><br/>Participation in the market dialogue is\n                  voluntary and does not oblige suppliers to submit a tender in any subsequent tender\n                  procedure.<br/><br/>The process for the market dialogue is as follows:<br/><br/>1.\n                  Energinet requests an overall and concise written response to the market dialogue.\n                  Suppliers are kindly asked to complete Market dialogue Emergency Power Systems - Questions\n                  and answers (please see instructions in the document “Market dialogue regarding Emergency\n                  Power Systems for Energinet’s stations). Please respond to as many questions as possible.\n                  The submitted responses will not be shared with other potential suppliers and will\n                  be used solely by Energinet.<br/><br/>2. Energinet may decide to conduct a more in\n                  depth market dialogue in the form of meetings, which may be held either physically\n                  or via Microsoft Teams. Energinet reserves the right to select which suppliers will\n                  be invited to such meetings.<br/><br/>3. Any clarifying questions must be submitted\n                  via Comdia.<br/><br/>4. Written responses must be submitted in English via Comdia\n                  no later than 16th September 2026 at 13:00 (CET).<br/><br/>Energinet thanks you in\n                  advance for your participation in the market dialogue.<br/><br/>Energinet wishes to\n                  assure participating suppliers that all responses will be treated confidentially and\n                  used exclusively for Energinet’s internal purposes in connection with the preparation\n                  of potential future EU tender procedures concerning the relevant services.</span></section>\n            <section><span class=\"label\">Intern ID</span><span class=\"text\">: </span><span class=\"value\">790538</span></section>\n            <section>3.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Varer</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31127000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Nødstrømsanlæg</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31682500</span><span class=\"text\"> </span><span class=\"dynamic-label\">Elektrisk nødudstyr</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31122000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Generatoranlæg</span></section>\n            </section>\n            <section>3.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n               <section><span class=\"dynamic-label\">Hvor som helst i det pågældende land</span></section>\n               <section><span class=\"label\">Yderligere oplysninger</span><span class=\"text\">: </span><span class=\"value\">Denmark</span></section>\n            </section>\n            <section>3.1.3&nbsp;<span class=\"label\">Varighed</span><section><span class=\"label\">Startdato</span><span class=\"text\">: </span><span class=\"value\">01-09-2026</span></section>\n               <section><span class=\"label\">Varigheds slutdato</span><span class=\"text\">: </span><span class=\"value\">16-09-2026</span></section>\n            </section>\n            <section>3.1.5&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Reserveret deltagelse</span><span class=\"text\">: </span><span class=\"dynamic-label\">Deltagelse uden forbehold.</span></section>\n               <section><span class=\"label\">Udbuddet er omfattet af aftalen om offentlige udbud (GPA)</span><span class=\"text\">: </span><span class=\"label\">ja</span></section>\n            </section>\n            <section>3.1.6&nbsp;<span class=\"label\">Tilbudsdokumenter</span><section><span class=\"label\">Adresse på udbudsdokumenterne</span><span class=\"text\">: </span><span class=\"value\">https://www.comdia.com/energinet/md/market_dialogue_regarding_emergency_power_systems_for_energinets_stations_-_2614023\n                     , </span></section>\n            </section>\n            <section>3.1.7&nbsp;<span class=\"label\">Tilbudsvilkår</span><section><span class=\"label\">Udførelsen af kontrakten skal ske inden for rammerne af programmer for beskyttet beskæftigelse</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nej</span></section>\n            </section>\n            <section>3.1.8&nbsp;<span class=\"label\">Teknikker</span><section><span class=\"label\">Rammeaftale</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Ingen rammeaftale</span></section>\n               </section>\n               <section><span class=\"label\">Oplysninger om det dynamiske indkøbssystem</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Intet dynamisk indkøbssystem</span></section>\n               </section>\n            </section>\n            <section>3.1.9&nbsp;<span class=\"label\">Yderligere oplysninger, mægling og gennemgang</span><section><span class=\"label\">Organisation med ansvar for klager</span><span class=\"text\">: </span><span class=\"value\">Danish Complaints Board for Public Procurement</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation, der leverer supplerende oplysninger om udbudsproceduren</span><span class=\"text\">: </span><span class=\"value\">Energinet</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation, der leverer yderligere oplysninger om klageprocedurerne</span><span class=\"text\">: </span><span class=\"value\">Danish Competition and Consumer Authority</span><span class=\"value\"></span></section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisationer</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Energinet</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">28980671</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Tonne Kjærsvej 65</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Fredericia</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">7000</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Enhed</span><span class=\"text\">: </span><span class=\"value\">Kirsten Ebstrup</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">procurement@energinet.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">70102244</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://energinet.dk/</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Køber</span></section>\n               <section><span class=\"label\">Organisation, der leverer supplerende oplysninger om udbudsproceduren</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1000</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Comdia ApS</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">33501404</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Lindvedvej 71</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Odense S</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">5260</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Fyn</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK031</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">support@comdia.com</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 7199 3672</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://www.comdia.com/</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1001</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Danish Complaints Board for Public Procurement</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Danish Appeals Boards Authority, Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vestjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK041</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">klfu@naevneneshus.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 7240 5600</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">http://www.klfu.dk</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation med ansvar for klager</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1002</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Danish Competition and Consumer Authority</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">10294819</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Carl Jacobsens Vej 35</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Valby</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2500</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">kfst@kfst.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 4171 5000</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://www.kfst.dk/</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation, der leverer yderligere oplysninger om klageprocedurerne</span></section>\n            </section>\n         </section>\n      </section>\n      <section><span class=\"label\">Oplysninger om bekendtgørelsen</span><section><span class=\"label\">Bekendtgørelsens ID</span><span class=\"text\">: </span><span class=\"value\">3e9b5981-843a-4a0e-82cf-f6e68e3c6513</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n         <section><span class=\"label\">Formulartype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Planlægning</span></section>\n         <section><span class=\"label\">Bekendtgørelsestype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Forhåndsmeddelelse eller vejledende periodisk bekendtgørelse, der kun er anvendt til informationsformål</span></section>\n         <section><span class=\"label\">Afsendelsesdato for bekendtgørelsen</span><span class=\"text\">: </span><span class=\"value\">01-09-2026</span><span class=\"text\"> </span><span class=\"value\">13:05 +02:00</span></section>\n         <section><span class=\"label\">Bekendtgørelsens officielle sprog</span><span class=\"text\">: </span><span class=\"dynamic-label\">engelsk</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         <section><span class=\"label\">Bekendtgørelsesnummer</span><span class=\"text\">: </span><span class=\"value\">00602840-2026</span></section>\n         <section><span class=\"label\">EUT-S-nummer</span><span class=\"text\">: </span><span class=\"value\">169/2026</span></section>\n         <section><span class=\"label\">Offentliggørelsesdato</span><span class=\"text\">: </span><span class=\"value\">02-09-2026</span></section>\n      </section>\n   </body>\n</html>","htmlEN":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Buyer</span><section>1.1&nbsp;<span class=\"label\">Buyer</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Energinet</span></section>\n            <section><span class=\"label\">Legal type of the buyer</span><span class=\"text\">: </span><span class=\"dynamic-label\">Public undertaking</span></section>\n            <section><span class=\"label\">Activity of the contracting entity</span><span class=\"text\">: </span><span class=\"dynamic-label\">Electricity-related activities</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Market dialogue regarding Emergency Power Systems for Energinet’s stations - 26/14023</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Energinet is looking into procuring approximately 200 standardised Emergency Power\n                  Stations (EPS) for Energinet’s stations across Denmark. The solution is intended to\n                  ensure compliance with new regulatory requirements related to resilience and preparedness,\n                  while providing reliable emergency power supply at critical energy infrastructure.<br/><br/>Through\n                  this market dialogue, Energinet seeks input from the market regarding technical solutions,\n                  production and delivery capacity, lead times, pricing, sustainability aspects, and\n                  contractual considerations related to a large-scale deployment of standardised emergency\n                  power stations.<br/><br/>The purpose of the market dialogue is to engage with potential\n                  suppliers, gather market insights, understand available technologies and delivery\n                  models, assess implementation capabilities, and ensure compliance.<br/><br/><br/>Energinet\n                  welcomes participation from manufacturers, system integrators, and service providers\n                  with relevant experience in emergency power generation, containerized energy solutions\n                  (e-houses), monitoring and control systems, commissioning and lifecycle support services.<br/><br/><br/>The\n                  investment is established due to requirements from the Danish Executive Order on Resilience\n                  and Preparedness in the Energy Sector (Executive Order No. 260 of 6 March 2025), which\n                  establishes enhanced obligations for emergency power supply at critical energy infrastructure\n                  sites.<br/><br/><br/>The regulation requires operators to ensure continuous emergency\n                  power availability until normal grid supply has been restored.<br/><br/><br/>To meet\n                  these regulatory requirements, Energinet is planning a large-scale tender of standardized\n                  emergency power stations (EPS).<br/><br/><br/>Based on both technical and economic\n                  considerations, Energinet has identified diesel-powered emergency generator systems\n                  as a baseline solution capable of providing reliable emergency power for extended\n                  and undefined outage durations.<br/><br/><br/>The EPS shall be delivered in a single\n                  compact technical building, divided into a generator room and a control room. All\n                  associated equipment and components shall be integrated within the building and arranged\n                  to ensure safe and efficient operation and maintenance in accordance with Energinet's\n                  standards and requirements. This will be specified in the final upcoming tender.<br/><br/><br/>The\n                  currently reference solution consists of a standardized module including:<br/><br/>•\n                  A complete compact station that must be smaller than 30m2 and lower than 3m<br/><br/>•\n                  125 kVA diesel generator<br/><br/>• LV-switch board for, Automatic transfer functionality<br/><br/>•\n                  Remote monitoring capabilities<br/><br/>• Hard wire communication and SCADA-integration<br/><br/>•\n                  Fuel storage sufficient for more than 72 hours at 75% load of continuous operation<br/><br/>•\n                  Ventilation<br/><br/>• Maximum noise level 35db 3 meters from the e-house<br/><br/>•\n                  Security Class RS3/RS4<br/><br/>• Plug and play solution<br/><br/>• Marine graded<br/><br/><br/>The\n                  scope and the technical solution should be based on a set of detailed minimum functional\n                  requirements and must comply with the applicable legislation, regulations, and relevant\n                  industry standards. Energinet is interested in optimized and innovative approaches.<br/><br/><br/>The\n                  solution shall be designed to provide a robust, scalable, and standardized approach\n                  that can be deployed consistently across a large number of sites without modifications\n                  or the use of individually components.<br/><br/><br/>Expected timeframe:<br/><br/>Tender\n                  published End of 2026<br/><br/>Contract signing Q2, 2027<br/><br/>Delivery at site\n                  Q3 and Q4, 2027 and in 2028<br/><br/><br/>Participation in the market dialogue is\n                  voluntary and does not oblige suppliers to submit a tender in any subsequent tender\n                  procedure.<br/><br/>The process for the market dialogue is as follows:<br/><br/>1.\n                  Energinet requests an overall and concise written response to the market dialogue.\n                  Suppliers are kindly asked to complete Market dialogue Emergency Power Systems - Questions\n                  and answers (please see instructions in the document “Market dialogue regarding Emergency\n                  Power Systems for Energinet’s stations). Please respond to as many questions as possible.\n                  The submitted responses will not be shared with other potential suppliers and will\n                  be used solely by Energinet.<br/><br/>2. Energinet may decide to conduct a more in\n                  depth market dialogue in the form of meetings, which may be held either physically\n                  or via Microsoft Teams. Energinet reserves the right to select which suppliers will\n                  be invited to such meetings.<br/><br/>3. Any clarifying questions must be submitted\n                  via Comdia.<br/><br/>4. Written responses must be submitted in English via Comdia\n                  no later than 16th September 2026 at 13:00 (CET).<br/><br/>Energinet thanks you in\n                  advance for your participation in the market dialogue.<br/><br/>Energinet wishes to\n                  assure participating suppliers that all responses will be treated confidentially and\n                  used exclusively for Energinet’s internal purposes in connection with the preparation\n                  of potential future EU tender procedures concerning the relevant services.</span></section>\n            <section><span class=\"label\">Internal identifier</span><span class=\"text\">: </span><span class=\"value\">790538</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Supplies</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31127000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Emergency generator</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31682500</span><span class=\"text\"> </span><span class=\"dynamic-label\">Emergency electricity equipment</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31122000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Generator units</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n               <section><span class=\"dynamic-label\">Anywhere in the given country</span></section>\n               <section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\">Denmark</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Legal basis</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Directive 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>3&nbsp;<span class=\"label\">Part</span><section>3.1&nbsp;<span class=\"label\">Part</span><span class=\"text\">: </span><span class=\"value\">PAR-0000</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Market dialogue regarding Emergency Power Systems for Energinet’s stations - 26/14023</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Energinet is looking into procuring approximately 200 standardised Emergency Power\n                  Stations (EPS) for Energinet’s stations across Denmark. The solution is intended to\n                  ensure compliance with new regulatory requirements related to resilience and preparedness,\n                  while providing reliable emergency power supply at critical energy infrastructure.<br/><br/>Through\n                  this market dialogue, Energinet seeks input from the market regarding technical solutions,\n                  production and delivery capacity, lead times, pricing, sustainability aspects, and\n                  contractual considerations related to a large-scale deployment of standardised emergency\n                  power stations.<br/><br/>The purpose of the market dialogue is to engage with potential\n                  suppliers, gather market insights, understand available technologies and delivery\n                  models, assess implementation capabilities, and ensure compliance.<br/><br/><br/>Energinet\n                  welcomes participation from manufacturers, system integrators, and service providers\n                  with relevant experience in emergency power generation, containerized energy solutions\n                  (e-houses), monitoring and control systems, commissioning and lifecycle support services.<br/><br/><br/>The\n                  investment is established due to requirements from the Danish Executive Order on Resilience\n                  and Preparedness in the Energy Sector (Executive Order No. 260 of 6 March 2025), which\n                  establishes enhanced obligations for emergency power supply at critical energy infrastructure\n                  sites.<br/><br/><br/>The regulation requires operators to ensure continuous emergency\n                  power availability until normal grid supply has been restored.<br/><br/><br/>To meet\n                  these regulatory requirements, Energinet is planning a large-scale tender of standardized\n                  emergency power stations (EPS).<br/><br/><br/>Based on both technical and economic\n                  considerations, Energinet has identified diesel-powered emergency generator systems\n                  as a baseline solution capable of providing reliable emergency power for extended\n                  and undefined outage durations.<br/><br/><br/>The EPS shall be delivered in a single\n                  compact technical building, divided into a generator room and a control room. All\n                  associated equipment and components shall be integrated within the building and arranged\n                  to ensure safe and efficient operation and maintenance in accordance with Energinet's\n                  standards and requirements. This will be specified in the final upcoming tender.<br/><br/><br/>The\n                  currently reference solution consists of a standardized module including:<br/><br/>•\n                  A complete compact station that must be smaller than 30m2 and lower than 3m<br/><br/>•\n                  125 kVA diesel generator<br/><br/>• LV-switch board for, Automatic transfer functionality<br/><br/>•\n                  Remote monitoring capabilities<br/><br/>• Hard wire communication and SCADA-integration<br/><br/>•\n                  Fuel storage sufficient for more than 72 hours at 75% load of continuous operation<br/><br/>•\n                  Ventilation<br/><br/>• Maximum noise level 35db 3 meters from the e-house<br/><br/>•\n                  Security Class RS3/RS4<br/><br/>• Plug and play solution<br/><br/>• Marine graded<br/><br/><br/>The\n                  scope and the technical solution should be based on a set of detailed minimum functional\n                  requirements and must comply with the applicable legislation, regulations, and relevant\n                  industry standards. Energinet is interested in optimized and innovative approaches.<br/><br/><br/>The\n                  solution shall be designed to provide a robust, scalable, and standardized approach\n                  that can be deployed consistently across a large number of sites without modifications\n                  or the use of individually components.<br/><br/><br/>Expected timeframe:<br/><br/>Tender\n                  published End of 2026<br/><br/>Contract signing Q2, 2027<br/><br/>Delivery at site\n                  Q3 and Q4, 2027 and in 2028<br/><br/><br/>Participation in the market dialogue is\n                  voluntary and does not oblige suppliers to submit a tender in any subsequent tender\n                  procedure.<br/><br/>The process for the market dialogue is as follows:<br/><br/>1.\n                  Energinet requests an overall and concise written response to the market dialogue.\n                  Suppliers are kindly asked to complete Market dialogue Emergency Power Systems - Questions\n                  and answers (please see instructions in the document “Market dialogue regarding Emergency\n                  Power Systems for Energinet’s stations). Please respond to as many questions as possible.\n                  The submitted responses will not be shared with other potential suppliers and will\n                  be used solely by Energinet.<br/><br/>2. Energinet may decide to conduct a more in\n                  depth market dialogue in the form of meetings, which may be held either physically\n                  or via Microsoft Teams. Energinet reserves the right to select which suppliers will\n                  be invited to such meetings.<br/><br/>3. Any clarifying questions must be submitted\n                  via Comdia.<br/><br/>4. Written responses must be submitted in English via Comdia\n                  no later than 16th September 2026 at 13:00 (CET).<br/><br/>Energinet thanks you in\n                  advance for your participation in the market dialogue.<br/><br/>Energinet wishes to\n                  assure participating suppliers that all responses will be treated confidentially and\n                  used exclusively for Energinet’s internal purposes in connection with the preparation\n                  of potential future EU tender procedures concerning the relevant services.</span></section>\n            <section><span class=\"label\">Internal identifier</span><span class=\"text\">: </span><span class=\"value\">790538</span></section>\n            <section>3.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Supplies</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31127000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Emergency generator</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31682500</span><span class=\"text\"> </span><span class=\"dynamic-label\">Emergency electricity equipment</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">31122000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Generator units</span></section>\n            </section>\n            <section>3.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n               <section><span class=\"dynamic-label\">Anywhere in the given country</span></section>\n               <section><span class=\"label\">Additional information</span><span class=\"text\">: </span><span class=\"value\">Denmark</span></section>\n            </section>\n            <section>3.1.3&nbsp;<span class=\"label\">Duration</span><section><span class=\"label\">Start date</span><span class=\"text\">: </span><span class=\"value\">01-09-2026</span></section>\n               <section><span class=\"label\">Duration end date</span><span class=\"text\">: </span><span class=\"value\">16-09-2026</span></section>\n            </section>\n            <section>3.1.5&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Reserved participation</span><span class=\"text\">: </span><span class=\"dynamic-label\">Participation is not reserved.</span></section>\n               <section><span class=\"label\">The procurement is covered by the Government Procurement Agreement (GPA)</span><span class=\"text\">: </span><span class=\"label\">yes</span></section>\n            </section>\n            <section>3.1.6&nbsp;<span class=\"label\">Procurement documents</span><section><span class=\"label\">Address of the procurement documents</span><span class=\"text\">: </span><span class=\"value\">https://www.comdia.com/energinet/md/market_dialogue_regarding_emergency_power_systems_for_energinets_stations_-_2614023\n                     , </span></section>\n            </section>\n            <section>3.1.7&nbsp;<span class=\"label\">Terms of procurement</span><section><span class=\"label\">The execution of the contract must be performed within the framework of sheltered employment programmes</span><span class=\"text\">: </span><span class=\"dynamic-label\">No</span></section>\n            </section>\n            <section>3.1.8&nbsp;<span class=\"label\">Techniques</span><section><span class=\"label\">Framework agreement</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No framework agreement</span></section>\n               </section>\n               <section><span class=\"label\">Information about the dynamic purchasing system</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No dynamic purchase system</span></section>\n               </section>\n            </section>\n            <section>3.1.9&nbsp;<span class=\"label\">Further information, mediation and review</span><section><span class=\"label\">Review organisation</span><span class=\"text\">: </span><span class=\"value\">Danish Complaints Board for Public Procurement</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation providing additional information about the procurement procedure</span><span class=\"text\">: </span><span class=\"value\">Energinet</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation providing more information on the review procedures</span><span class=\"text\">: </span><span class=\"value\">Danish Competition and Consumer Authority</span><span class=\"value\"></span></section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisations</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Energinet</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">28980671</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Tonne Kjærsvej 65</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Fredericia</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">7000</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Contact point</span><span class=\"text\">: </span><span class=\"value\">Kirsten Ebstrup</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">procurement@energinet.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">70102244</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://energinet.dk/</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Buyer</span></section>\n               <section><span class=\"label\">Organisation providing additional information about the procurement procedure</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1000</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Comdia ApS</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">33501404</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Lindvedvej 71</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Odense S</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">5260</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Fyn</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK031</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">support@comdia.com</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 7199 3672</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://www.comdia.com/</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1001</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Danish Complaints Board for Public Procurement</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Danish Appeals Boards Authority, Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vestjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK041</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">klfu@naevneneshus.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 7240 5600</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">http://www.klfu.dk</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Review organisation</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1002</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Danish Competition and Consumer Authority</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">10294819</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Carl Jacobsens Vej 35</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Valby</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2500</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">kfst@kfst.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 4171 5000</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://www.kfst.dk/</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Organisation providing more information on the review procedures</span></section>\n            </section>\n         </section>\n      </section>\n      <section><span class=\"label\">Notice information</span><section><span class=\"label\">Notice identifier/version</span><span class=\"text\">: </span><span class=\"value\">3e9b5981-843a-4a0e-82cf-f6e68e3c6513</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n         <section><span class=\"label\">Form type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Planning</span></section>\n         <section><span class=\"label\">Notice type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Prior information notice or a periodic indicative notice used only for information</span></section>\n         <section><span class=\"label\">Notice dispatch date</span><span class=\"text\">: </span><span class=\"value\">01-09-2026</span><span class=\"text\"> </span><span class=\"value\">13:05 +02:00</span></section>\n         <section><span class=\"label\">Languages in which this notice is officially available</span><span class=\"text\">: </span><span class=\"dynamic-label\">English</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         <section><span class=\"label\">Notice publication number</span><span class=\"text\">: </span><span class=\"value\">00602840-2026</span></section>\n         <section><span class=\"label\">OJ S issue number</span><span class=\"text\">: </span><span class=\"value\">169/2026</span></section>\n         <section><span class=\"label\">Publication date</span><span class=\"text\">: </span><span class=\"value\">02-09-2026</span></section>\n      </section>\n   </body>\n</html>","opsummeringDA":{"card":{"titel":"Market dialogue regarding Emergency Power Systems for Energinet’s stations - 26/14023","ordregiver":"Energinet","ordregiverId":"28980671","ordregiverIdDatavasket":"28980671","publiceringsdato":"2026-09-02+02:00","cpvKode":"31127000","cpvTitel":"Nødstrømsanlæg","formulartype":"Planlægning","formulartypeKode":"planning","tidsfrister":[],"alleOrdregivere":["Energinet"],"beskrivelse":"Energinet is looking into procuring approximately 200 standardised Emergency Power Stations (EPS) for Energinet’s stations across Denmark. The solution is intended to ensure compliance with new regulatory requirements related to resilience and preparedness, while providing reliable emergency power supply at critical energy infrastructure.\n\nThrough this market dialogue, Energinet seeks input from the market regarding technical solutions, production and delivery capacity, lead times, pricing, sustainability aspects, and contractual considerations related to a large-scale deployment of standardised emergency power stations.\n\nThe purpose of the market dialogue is to engage with potential suppliers, gather market insights, understand available technologies and delivery models, assess implementation capabilities, and ensure compliance.\n\n\nEnerginet welcomes participation from manufacturers, system integrators, and service providers with relevant experience in emergency power generation, containerized energy solutions (e-houses), monitoring and control systems, commissioning and lifecycle support services.\n\n\nThe investment is established due to requirements from the Danish Executive Order on Resilience and Preparedness in the Energy Sector (Executive Order No. 260 of 6 March 2025), which establishes enhanced obligations for emergency power supply at critical energy infrastructure sites.\n\n\nThe regulation requires operators to ensure continuous emergency power availability until normal grid supply has been restored.\n\n\nTo meet these regulatory requirements, Energinet is planning a large-scale tender of standardized emergency power stations (EPS).\n\n\nBased on both technical and economic considerations, Energinet has identified diesel-powered emergency generator systems as a baseline solution capable of providing reliable emergency power for extended and undefined outage durations.\n\n\nThe EPS shall be delivered in a single compact technical building, divided into a generator room and a control room. All associated equipment and components shall be integrated within the building and arranged to ensure safe and efficient operation and maintenance in accordance with Energinet's standards and requirements. This will be specified in the final upcoming tender.\n\n\nThe currently reference solution consists of a standardized module including:\n\n• A complete compact station that must be smaller than 30m2 and lower than 3m\n\n• 125 kVA diesel generator\n\n• LV-switch board for, Automatic transfer functionality\n\n• Remote monitoring capabilities\n\n• Hard wire communication and SCADA-integration\n\n• Fuel storage sufficient for more than 72 hours at 75% load of continuous operation\n\n• Ventilation\n\n• Maximum noise level 35db 3 meters from the e-house\n\n• Security Class RS3/RS4\n\n• Plug and play solution\n\n• Marine graded\n\n\nThe scope and the technical solution should be based on a set of detailed minimum functional requirements and must comply with the applicable legislation, regulations, and relevant industry standards. Energinet is interested in optimized and innovative approaches.\n\n\nThe solution shall be designed to provide a robust, scalable, and standardized approach that can be deployed consistently across a large number of sites without modifications or the use of individually components.\n\n\nExpected timeframe:\n\nTender published End of 2026\n\nContract signing Q2, 2027\n\nDelivery at site Q3 and Q4, 2027 and in 2028\n\n\nParticipation in the market dialogue is voluntary and does not oblige suppliers to submit a tender in any subsequent tender procedure.\n\nThe process for the market dialogue is as follows:\n\n1. Energinet requests an overall and concise written response to the market dialogue. Suppliers are kindly asked to complete Market dialogue Emergency Power Systems - Questions and answers (please see instructions in the document “Market dialogue regarding Emergency Power Systems for Energinet’s stations). Please respond to as many questions as possible. The submitted responses will not be shared with other potential suppliers and will be used solely by Energinet.\n\n2. Energinet may decide to conduct a more in depth market dialogue in the form of meetings, which may be held either physically or via Microsoft Teams. Energinet reserves the right to select which suppliers will be invited to such meetings.\n\n3. Any clarifying questions must be submitted via Comdia.\n\n4. Written responses must be submitted in English via Comdia no later than 16th September 2026 at 13:00 (CET).\n\nEnerginet thanks you in advance for your participation in the market dialogue.\n\nEnerginet wishes to assure participating suppliers that all responses will be treated confidentially and used exclusively for Energinet’s internal purposes in connection with the preparation of potential future EU tender procedures concerning the relevant services.","bkSubTypeKode":"5","bkSubType":"Vejledende periodisk bekendtgørelse kun anvendt til informationsformål – sektordirektivet","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":[],"udforelsesstedSubLand":[],"udforelsesstedLand":["Danmark"],"udforelsesstedBy":[],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"svarfrister":[],"antalParts":1,"antalLots":0,"udbudsDokumenter":["https://www.comdia.com/energinet/md/market_dialogue_regarding_emergency_power_systems_for_energinets_stations_-_2614023"]},"opsummeringEN":{"card":{"titel":"Market dialogue regarding Emergency Power Systems for Energinet’s stations - 26/14023","ordregiver":"Energinet","ordregiverId":"28980671","ordregiverIdDatavasket":"28980671","publiceringsdato":"2026-09-02+02:00","cpvKode":"31127000","cpvTitel":"Emergency generator","formulartype":"Planning","formulartypeKode":"planning","tidsfrister":[],"alleOrdregivere":["Energinet"],"beskrivelse":"Energinet is looking into procuring approximately 200 standardised Emergency Power Stations (EPS) for Energinet’s stations across Denmark. The solution is intended to ensure compliance with new regulatory requirements related to resilience and preparedness, while providing reliable emergency power supply at critical energy infrastructure.\n\nThrough this market dialogue, Energinet seeks input from the market regarding technical solutions, production and delivery capacity, lead times, pricing, sustainability aspects, and contractual considerations related to a large-scale deployment of standardised emergency power stations.\n\nThe purpose of the market dialogue is to engage with potential suppliers, gather market insights, understand available technologies and delivery models, assess implementation capabilities, and ensure compliance.\n\n\nEnerginet welcomes participation from manufacturers, system integrators, and service providers with relevant experience in emergency power generation, containerized energy solutions (e-houses), monitoring and control systems, commissioning and lifecycle support services.\n\n\nThe investment is established due to requirements from the Danish Executive Order on Resilience and Preparedness in the Energy Sector (Executive Order No. 260 of 6 March 2025), which establishes enhanced obligations for emergency power supply at critical energy infrastructure sites.\n\n\nThe regulation requires operators to ensure continuous emergency power availability until normal grid supply has been restored.\n\n\nTo meet these regulatory requirements, Energinet is planning a large-scale tender of standardized emergency power stations (EPS).\n\n\nBased on both technical and economic considerations, Energinet has identified diesel-powered emergency generator systems as a baseline solution capable of providing reliable emergency power for extended and undefined outage durations.\n\n\nThe EPS shall be delivered in a single compact technical building, divided into a generator room and a control room. All associated equipment and components shall be integrated within the building and arranged to ensure safe and efficient operation and maintenance in accordance with Energinet's standards and requirements. This will be specified in the final upcoming tender.\n\n\nThe currently reference solution consists of a standardized module including:\n\n• A complete compact station that must be smaller than 30m2 and lower than 3m\n\n• 125 kVA diesel generator\n\n• LV-switch board for, Automatic transfer functionality\n\n• Remote monitoring capabilities\n\n• Hard wire communication and SCADA-integration\n\n• Fuel storage sufficient for more than 72 hours at 75% load of continuous operation\n\n• Ventilation\n\n• Maximum noise level 35db 3 meters from the e-house\n\n• Security Class RS3/RS4\n\n• Plug and play solution\n\n• Marine graded\n\n\nThe scope and the technical solution should be based on a set of detailed minimum functional requirements and must comply with the applicable legislation, regulations, and relevant industry standards. Energinet is interested in optimized and innovative approaches.\n\n\nThe solution shall be designed to provide a robust, scalable, and standardized approach that can be deployed consistently across a large number of sites without modifications or the use of individually components.\n\n\nExpected timeframe:\n\nTender published End of 2026\n\nContract signing Q2, 2027\n\nDelivery at site Q3 and Q4, 2027 and in 2028\n\n\nParticipation in the market dialogue is voluntary and does not oblige suppliers to submit a tender in any subsequent tender procedure.\n\nThe process for the market dialogue is as follows:\n\n1. Energinet requests an overall and concise written response to the market dialogue. Suppliers are kindly asked to complete Market dialogue Emergency Power Systems - Questions and answers (please see instructions in the document “Market dialogue regarding Emergency Power Systems for Energinet’s stations). Please respond to as many questions as possible. The submitted responses will not be shared with other potential suppliers and will be used solely by Energinet.\n\n2. Energinet may decide to conduct a more in depth market dialogue in the form of meetings, which may be held either physically or via Microsoft Teams. Energinet reserves the right to select which suppliers will be invited to such meetings.\n\n3. Any clarifying questions must be submitted via Comdia.\n\n4. Written responses must be submitted in English via Comdia no later than 16th September 2026 at 13:00 (CET).\n\nEnerginet thanks you in advance for your participation in the market dialogue.\n\nEnerginet wishes to assure participating suppliers that all responses will be treated confidentially and used exclusively for Energinet’s internal purposes in connection with the preparation of potential future EU tender procedures concerning the relevant services.","bkSubTypeKode":"5","bkSubType":"Periodic indicative notice used only for information – sectoral directive","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":[],"udforelsesstedSubLand":[],"udforelsesstedLand":["Denmark"],"udforelsesstedBy":[],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"svarfrister":[],"antalParts":1,"antalLots":0,"udbudsDokumenter":["https://www.comdia.com/energinet/md/market_dialogue_regarding_emergency_power_systems_for_energinets_stations_-_2614023"]}}