{"bekendtgoerelseNoegle":{"noticeId":{"value":"28a6c1fc-9e55-47ee-a7bd-f91def26110e"},"noticeVersion":{"value":"01"},"noticePublicationNumber":{"value":"00731155-2024"}},"htmlDA":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Køber</span><section>1.1&nbsp;<span class=\"label\">Køber</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span></section>\n            <section><span class=\"label\">Den ordregivende enheds aktiviteter</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bytransport med jernbane, sporvogn, trolleybus eller bus</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Early Contractor Involvement, extension of Cityringen to Nordhavn</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Nordhavn is currently Copenhagen’s fastest growing locality. The Nordhavn area is\n                  planned to grow to approximately 35.000 residents and 28.000 working places by 2050.\n                  Well-functioning public transportation is a crucial part of the growth of Nordhavn,\n                  and the M4 Cityringen metroline is therfore planned to be extended from the existing\n                  Orientkaj Station to outer Nordhavn with 2 new stations. The customers of the Copenhagen\n                  Metro expect a high level of service with functional and attractive infrastructure.\n                  The extension will be an integrated part of the existing M4 line called Cityringen\n                  Nordhavn Extension (CRNHE). The Nordhavn Extension shall be a fully elevated line\n                  of approximately 1,6 km with two stations; until further called v./Levantkaj and v./Nordhavn\n                  C. Metroselskabet have high ambitions for the extension to Nordhavn and to accommodate\n                  the need for lowered CO2-emissions see a need to rethink design processes and constructions.\n                  On that background Metroselskabet is aiming to sign a contract with a contractor who\n                  have a team of capable and experienced consultants, able to challenge our current\n                  understanding of the architecture of the stations and viaducts as well as methods\n                  of designing and constructing a metro. Metroselskabet is committed to delivering world-class\n                  sustainable transportation and aims to achieve this through the adoption of new ideas\n                  and innovative solutions. Metroselskabet have identified the following areas that\n                  will be of high priority during the CRNHE project: • Collaboration To accommodate\n                  the need for renewing the processes surrounding the project, Metroselskabet plans\n                  to work very closely with the contractor and the team to develop the project (see\n                  below). • Passengers The existing Copenhagen metro is a high-quality public transport\n                  service that provides robust and resilient operation in addition to a good, efficient\n                  and intuitive experience for all passengers. The extension is to provide the best\n                  possible passenger experience by making use of lessons from the existing metro in\n                  operation, which shall be an integrated part of the design process from the beginning.\n                  • Carbon footprint In terms of carbon footprint, Metroselskabet has an ambition to\n                  halve the carbon footprint from the construction phase of new Metro projects compared\n                  to the existing Metro at Orientkaj. The ambition shall be obtained mainly via design\n                  optimizations, new construction methods and material choices. • Emission free non-road\n                  machinery Metroselskabet has together with other partners defined and signed a declaration\n                  of intent, to integrate emission free non-road machinery on projects, please refer\n                  to this article describing the declaration of intent (in Danish): \"Public construction\n                  clients sign declaration of intent\". • Circular resource use Metroselskabet has a\n                  focus on applying the principles of circular economy in the way resources are being\n                  consumed. Metroselskabet will focus on reducing the consumption of natural resources\n                  and increase recirculation and recycling of materials and waste in constructing new\n                  Metro. • Metroselskabet is part of the City of Copenhagen’s partnership agreement\n                  for biodiversity together with 18 other landowners working to preserve and create\n                  new urban nature in the city. • Digital The goal of our digital ambition is to ensure\n                  that the project use digital solutions for innovation, sustainability, and to support\n                  efficient infrastructure solution that meets requirements for high quality, environmental\n                  considerations and advanced operations throughout the entire project lifecycle. Currently,\n                  Metroselskabet is finalizing documentation for the tender. The project will be tendered\n                  out as a design and build contract (ABT18) with an in-built close collaboration phase,\n                  where Metroselskabet together with the contractor and the contractor´s consultants\n                  will develop the design for the viaducts and the architecture of the stations. The\n                  tender documentation will have a very strong focus on the collaboration between the\n                  parties to achieve our ambitious goals for the project. Metroselskabet expects the\n                  contractor to bring consultants which are capable of executing the project but also\n                  consultants &amp; architects to challenge the current perception of the architecture of\n                  the stations without compromising the passenger experience. Metroselskabet intends\n                  to use competitive dialogue as the procurement procedure as Metroselskabet intends\n                  to develop the final tender documentation with inputs from the tenderers. The tender\n                  is expected to be released early 2025. Metroselskabet would like to invite all interested\n                  parties to an information meeting on 2024.12.16 at 14:30-16:30 (local Danish time).\n                  The information meeting will be held at: Metroselskabet, Metrovej 5, 2300 Copenhagen\n                  S. Please, register for the meeting by emailing cafr@m.dk and let us know the number\n                  of participants. In order to ease the registration of the participants at the information\n                  meeting please indicate the names of the participants in your registration for the\n                  meeting. Due to the size of the venue for the meeting, Metroselskabet need to limit\n                  the number of participants per interested party to a maximum of 3. The information\n                  meeting is for physical attendees only. If you prefer a digital meeting, please let\n                  us know that as well. If there is sufficient interest for a digital meeting (via TEAMS)\n                  Metroselskabet will repeat the information meeting digitally.</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bygge og anlæg</span></section>\n               <section><span class=\"label\">Supplerende kontrakttype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tjenesteydelser</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejder</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">71000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Arkitekt-, konstruktions-, ingeniør- og inspektionsvirksomhed</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n               <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n               <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n               <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Retsgrundlag</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Direktiv 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>3&nbsp;<span class=\"label\">Del</span><section>3.1&nbsp;<span class=\"label\">Teknisk ID for delen</span><span class=\"text\">: </span><span class=\"value\">PAR-0001</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Early Contractor Involvement, extension of Cityringen to Nordhavn</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">Nordhavn is currently Copenhagen’s fastest growing locality. The Nordhavn area is\n                  planned to grow to approximately 35.000 residents and 28.000 working places by 2050.\n                  Well-functioning public transportation is a crucial part of the growth of Nordhavn,\n                  and the M4 Cityringen metroline is therfore planned to be extended from the existing\n                  Orientkaj Station to outer Nordhavn with 2 new stations. The customers of the Copenhagen\n                  Metro expect a high level of service with functional and attractive infrastructure.\n                  The extension will be an integrated part of the existing M4 line called Cityringen\n                  Nordhavn Extension (CRNHE). The Nordhavn Extension shall be a fully elevated line\n                  of approximately 1,6 km with two stations; until further called v./Levantkaj and v./Nordhavn\n                  C. Metroselskabet have high ambitions for the extension to Nordhavn and to accommodate\n                  the need for lowered CO2-emissions see a need to rethink design processes and constructions.\n                  On that background Metroselskabet is aiming to sign a contract with a contractor who\n                  have a team of capable and experienced consultants, able to challenge our current\n                  understanding of the architecture of the stations and viaducts as well as methods\n                  of designing and constructing a metro. Metroselskabet is committed to delivering world-class\n                  sustainable transportation and aims to achieve this through the adoption of new ideas\n                  and innovative solutions. Metroselskabet have identified the following areas that\n                  will be of high priority during the CRNHE project: • Collaboration To accommodate\n                  the need for renewing the processes surrounding the project, Metroselskabet plans\n                  to work very closely with the contractor and the team to develop the project (see\n                  below). • Passengers The existing Copenhagen metro is a high-quality public transport\n                  service that provides robust and resilient operation in addition to a good, efficient\n                  and intuitive experience for all passengers. The extension is to provide the best\n                  possible passenger experience by making use of lessons from the existing metro in\n                  operation, which shall be an integrated part of the design process from the beginning.\n                  • Carbon footprint In terms of carbon footprint, Metroselskabet has an ambition to\n                  halve the carbon footprint from the construction phase of new Metro projects compared\n                  to the existing Metro at Orientkaj. The ambition shall be obtained mainly via design\n                  optimizations, new construction methods and material choices. • Emission free non-road\n                  machinery Metroselskabet has together with other partners defined and signed a declaration\n                  of intent, to integrate emission free non-road machinery on projects, please refer\n                  to this article describing the declaration of intent (in Danish): \"Public construction\n                  clients sign declaration of intent\". • Circular resource use Metroselskabet has a\n                  focus on applying the principles of circular economy in the way resources are being\n                  consumed. Metroselskabet will focus on reducing the consumption of natural resources\n                  and increase recirculation and recycling of materials and waste in constructing new\n                  Metro. • Metroselskabet is part of the City of Copenhagen’s partnership agreement\n                  for biodiversity together with 18 other landowners working to preserve and create\n                  new urban nature in the city. • Digital The goal of our digital ambition is to ensure\n                  that the project use digital solutions for innovation, sustainability, and to support\n                  efficient infrastructure solution that meets requirements for high quality, environmental\n                  considerations and advanced operations throughout the entire project lifecycle. Currently,\n                  Metroselskabet is finalizing documentation for the tender. The project will be tendered\n                  out as a design and build contract (ABT18) with an in-built close collaboration phase,\n                  where Metroselskabet together with the contractor and the contractor´s consultants\n                  will develop the design for the viaducts and the architecture of the stations. The\n                  tender documentation will have a very strong focus on the collaboration between the\n                  parties to achieve our ambitious goals for the project. Metroselskabet expects the\n                  contractor to bring consultants which are capable of executing the project but also\n                  consultants &amp; architects to challenge the current perception of the architecture of\n                  the stations without compromising the passenger experience. Metroselskabet intends\n                  to use competitive dialogue as the procurement procedure as Metroselskabet intends\n                  to develop the final tender documentation with inputs from the tenderers. The tender\n                  is expected to be released early 2025. Metroselskabet would like to invite all interested\n                  parties to an information meeting on 2024.12.16 at 14:30-16:30 (local Danish time).\n                  The information meeting will be held at: Metroselskabet, Metrovej 5, 2300 Copenhagen\n                  S. Please, register for the meeting by emailing cafr@m.dk and let us know the number\n                  of participants. In order to ease the registration of the participants at the information\n                  meeting please indicate the names of the participants in your registration for the\n                  meeting. Due to the size of the venue for the meeting, Metroselskabet need to limit\n                  the number of participants per interested party to a maximum of 3. The information\n                  meeting is for physical attendees only. If you prefer a digital meeting, please let\n                  us know that as well. If there is sufficient interest for a digital meeting (via TEAMS)\n                  Metroselskabet will repeat the information meeting digitally.</span></section>\n            <section>3.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Bygge og anlæg</span></section>\n               <section><span class=\"label\">Supplerende kontrakttype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tjenesteydelser</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Bygge- og anlægsarbejder</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">71000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Arkitekt-, konstruktions-, ingeniør- og inspektionsvirksomhed</span></section>\n            </section>\n            <section>3.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n               <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n               <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n               <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            </section>\n            <section>3.1.8&nbsp;<span class=\"label\">Teknikker</span><section><span class=\"label\">Rammeaftale</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Ingen rammeaftale</span></section>\n               </section>\n            </section>\n            <section>3.1.9&nbsp;<span class=\"label\">Yderligere oplysninger, mægling og gennemgang</span><section><span class=\"label\">Organisation med ansvar for klager</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for udbud</span></section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisationer</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">30823699</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Enhed</span><span class=\"text\">: </span><span class=\"value\">Camilla Frost Janns</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">cafr@m.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">72424573</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">www.m.dk</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Køber</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0002</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for udbud</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vestjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK041</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation med ansvar for klager</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0000</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Publications Office of the European Union</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">PUBL</span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Luxembourg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2417</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">LU000</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">ted@publications.europa.eu</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+352 29291</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://op.europa.eu</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n      </section>\n      <section>11&nbsp;<span class=\"label\">Oplysninger om bekendtgørelsen</span><section>11.1&nbsp;<span class=\"label\">Oplysninger om bekendtgørelsen</span><section><span class=\"label\">Bekendtgørelsens ID</span><span class=\"text\">: </span><span class=\"value\">28a6c1fc-9e55-47ee-a7bd-f91def26110e</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n            <section><span class=\"label\">Formulartype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Planlægning</span></section>\n            <section><span class=\"label\">Bekendtgørelsestype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Forhåndsmeddelelse eller vejledende periodisk bekendtgørelse, der kun er anvendt til informationsformål</span></section>\n            <section><span class=\"label\">Afsendelsesdato for bekendtgørelsen</span><span class=\"text\">: </span><span class=\"value\">28-11-2024</span><span class=\"text\"> </span><span class=\"value\">12:46 +00:00</span></section>\n            <section><span class=\"label\">Bekendtgørelsens officielle sprog</span><span class=\"text\">: </span><span class=\"dynamic-label\">engelsk</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         </section>\n         <section>11.2&nbsp;<span class=\"label\">Oplysninger om offentliggørelsen</span><section><span class=\"label\">Bekendtgørelsesnummer</span><span class=\"text\">: </span><span class=\"value\">00731155-2024</span></section>\n            <section><span class=\"label\">EUT-S-nummer</span><span class=\"text\">: </span><span class=\"value\">233/2024</span></section>\n            <section><span class=\"label\">Offentliggørelsesdato</span><span class=\"text\">: </span><span class=\"value\">29-11-2024</span></section>\n         </section>\n      </section>\n   </body>\n</html>","htmlEN":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Buyer</span><section>1.1&nbsp;<span class=\"label\">Buyer</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span></section>\n            <section><span class=\"label\">Activity of the contracting entity</span><span class=\"text\">: </span><span class=\"dynamic-label\">Urban railway, tramway, trolleybus or bus services</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Early Contractor Involvement, extension of Cityringen to Nordhavn</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Nordhavn is currently Copenhagen’s fastest growing locality. The Nordhavn area is\n                  planned to grow to approximately 35.000 residents and 28.000 working places by 2050.\n                  Well-functioning public transportation is a crucial part of the growth of Nordhavn,\n                  and the M4 Cityringen metroline is therfore planned to be extended from the existing\n                  Orientkaj Station to outer Nordhavn with 2 new stations. The customers of the Copenhagen\n                  Metro expect a high level of service with functional and attractive infrastructure.\n                  The extension will be an integrated part of the existing M4 line called Cityringen\n                  Nordhavn Extension (CRNHE). The Nordhavn Extension shall be a fully elevated line\n                  of approximately 1,6 km with two stations; until further called v./Levantkaj and v./Nordhavn\n                  C. Metroselskabet have high ambitions for the extension to Nordhavn and to accommodate\n                  the need for lowered CO2-emissions see a need to rethink design processes and constructions.\n                  On that background Metroselskabet is aiming to sign a contract with a contractor who\n                  have a team of capable and experienced consultants, able to challenge our current\n                  understanding of the architecture of the stations and viaducts as well as methods\n                  of designing and constructing a metro. Metroselskabet is committed to delivering world-class\n                  sustainable transportation and aims to achieve this through the adoption of new ideas\n                  and innovative solutions. Metroselskabet have identified the following areas that\n                  will be of high priority during the CRNHE project: • Collaboration To accommodate\n                  the need for renewing the processes surrounding the project, Metroselskabet plans\n                  to work very closely with the contractor and the team to develop the project (see\n                  below). • Passengers The existing Copenhagen metro is a high-quality public transport\n                  service that provides robust and resilient operation in addition to a good, efficient\n                  and intuitive experience for all passengers. The extension is to provide the best\n                  possible passenger experience by making use of lessons from the existing metro in\n                  operation, which shall be an integrated part of the design process from the beginning.\n                  • Carbon footprint In terms of carbon footprint, Metroselskabet has an ambition to\n                  halve the carbon footprint from the construction phase of new Metro projects compared\n                  to the existing Metro at Orientkaj. The ambition shall be obtained mainly via design\n                  optimizations, new construction methods and material choices. • Emission free non-road\n                  machinery Metroselskabet has together with other partners defined and signed a declaration\n                  of intent, to integrate emission free non-road machinery on projects, please refer\n                  to this article describing the declaration of intent (in Danish): \"Public construction\n                  clients sign declaration of intent\". • Circular resource use Metroselskabet has a\n                  focus on applying the principles of circular economy in the way resources are being\n                  consumed. Metroselskabet will focus on reducing the consumption of natural resources\n                  and increase recirculation and recycling of materials and waste in constructing new\n                  Metro. • Metroselskabet is part of the City of Copenhagen’s partnership agreement\n                  for biodiversity together with 18 other landowners working to preserve and create\n                  new urban nature in the city. • Digital The goal of our digital ambition is to ensure\n                  that the project use digital solutions for innovation, sustainability, and to support\n                  efficient infrastructure solution that meets requirements for high quality, environmental\n                  considerations and advanced operations throughout the entire project lifecycle. Currently,\n                  Metroselskabet is finalizing documentation for the tender. The project will be tendered\n                  out as a design and build contract (ABT18) with an in-built close collaboration phase,\n                  where Metroselskabet together with the contractor and the contractor´s consultants\n                  will develop the design for the viaducts and the architecture of the stations. The\n                  tender documentation will have a very strong focus on the collaboration between the\n                  parties to achieve our ambitious goals for the project. Metroselskabet expects the\n                  contractor to bring consultants which are capable of executing the project but also\n                  consultants &amp; architects to challenge the current perception of the architecture of\n                  the stations without compromising the passenger experience. Metroselskabet intends\n                  to use competitive dialogue as the procurement procedure as Metroselskabet intends\n                  to develop the final tender documentation with inputs from the tenderers. The tender\n                  is expected to be released early 2025. Metroselskabet would like to invite all interested\n                  parties to an information meeting on 2024.12.16 at 14:30-16:30 (local Danish time).\n                  The information meeting will be held at: Metroselskabet, Metrovej 5, 2300 Copenhagen\n                  S. Please, register for the meeting by emailing cafr@m.dk and let us know the number\n                  of participants. In order to ease the registration of the participants at the information\n                  meeting please indicate the names of the participants in your registration for the\n                  meeting. Due to the size of the venue for the meeting, Metroselskabet need to limit\n                  the number of participants per interested party to a maximum of 3. The information\n                  meeting is for physical attendees only. If you prefer a digital meeting, please let\n                  us know that as well. If there is sufficient interest for a digital meeting (via TEAMS)\n                  Metroselskabet will repeat the information meeting digitally.</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Works</span></section>\n               <section><span class=\"label\">Additional nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Services</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">71000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Architectural, construction, engineering and inspection services</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n               <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n               <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Legal basis</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Directive 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>3&nbsp;<span class=\"label\">Part</span><section>3.1&nbsp;<span class=\"label\">Part technical ID</span><span class=\"text\">: </span><span class=\"value\">PAR-0001</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Early Contractor Involvement, extension of Cityringen to Nordhavn</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">Nordhavn is currently Copenhagen’s fastest growing locality. The Nordhavn area is\n                  planned to grow to approximately 35.000 residents and 28.000 working places by 2050.\n                  Well-functioning public transportation is a crucial part of the growth of Nordhavn,\n                  and the M4 Cityringen metroline is therfore planned to be extended from the existing\n                  Orientkaj Station to outer Nordhavn with 2 new stations. The customers of the Copenhagen\n                  Metro expect a high level of service with functional and attractive infrastructure.\n                  The extension will be an integrated part of the existing M4 line called Cityringen\n                  Nordhavn Extension (CRNHE). The Nordhavn Extension shall be a fully elevated line\n                  of approximately 1,6 km with two stations; until further called v./Levantkaj and v./Nordhavn\n                  C. Metroselskabet have high ambitions for the extension to Nordhavn and to accommodate\n                  the need for lowered CO2-emissions see a need to rethink design processes and constructions.\n                  On that background Metroselskabet is aiming to sign a contract with a contractor who\n                  have a team of capable and experienced consultants, able to challenge our current\n                  understanding of the architecture of the stations and viaducts as well as methods\n                  of designing and constructing a metro. Metroselskabet is committed to delivering world-class\n                  sustainable transportation and aims to achieve this through the adoption of new ideas\n                  and innovative solutions. Metroselskabet have identified the following areas that\n                  will be of high priority during the CRNHE project: • Collaboration To accommodate\n                  the need for renewing the processes surrounding the project, Metroselskabet plans\n                  to work very closely with the contractor and the team to develop the project (see\n                  below). • Passengers The existing Copenhagen metro is a high-quality public transport\n                  service that provides robust and resilient operation in addition to a good, efficient\n                  and intuitive experience for all passengers. The extension is to provide the best\n                  possible passenger experience by making use of lessons from the existing metro in\n                  operation, which shall be an integrated part of the design process from the beginning.\n                  • Carbon footprint In terms of carbon footprint, Metroselskabet has an ambition to\n                  halve the carbon footprint from the construction phase of new Metro projects compared\n                  to the existing Metro at Orientkaj. The ambition shall be obtained mainly via design\n                  optimizations, new construction methods and material choices. • Emission free non-road\n                  machinery Metroselskabet has together with other partners defined and signed a declaration\n                  of intent, to integrate emission free non-road machinery on projects, please refer\n                  to this article describing the declaration of intent (in Danish): \"Public construction\n                  clients sign declaration of intent\". • Circular resource use Metroselskabet has a\n                  focus on applying the principles of circular economy in the way resources are being\n                  consumed. Metroselskabet will focus on reducing the consumption of natural resources\n                  and increase recirculation and recycling of materials and waste in constructing new\n                  Metro. • Metroselskabet is part of the City of Copenhagen’s partnership agreement\n                  for biodiversity together with 18 other landowners working to preserve and create\n                  new urban nature in the city. • Digital The goal of our digital ambition is to ensure\n                  that the project use digital solutions for innovation, sustainability, and to support\n                  efficient infrastructure solution that meets requirements for high quality, environmental\n                  considerations and advanced operations throughout the entire project lifecycle. Currently,\n                  Metroselskabet is finalizing documentation for the tender. The project will be tendered\n                  out as a design and build contract (ABT18) with an in-built close collaboration phase,\n                  where Metroselskabet together with the contractor and the contractor´s consultants\n                  will develop the design for the viaducts and the architecture of the stations. The\n                  tender documentation will have a very strong focus on the collaboration between the\n                  parties to achieve our ambitious goals for the project. Metroselskabet expects the\n                  contractor to bring consultants which are capable of executing the project but also\n                  consultants &amp; architects to challenge the current perception of the architecture of\n                  the stations without compromising the passenger experience. Metroselskabet intends\n                  to use competitive dialogue as the procurement procedure as Metroselskabet intends\n                  to develop the final tender documentation with inputs from the tenderers. The tender\n                  is expected to be released early 2025. Metroselskabet would like to invite all interested\n                  parties to an information meeting on 2024.12.16 at 14:30-16:30 (local Danish time).\n                  The information meeting will be held at: Metroselskabet, Metrovej 5, 2300 Copenhagen\n                  S. Please, register for the meeting by emailing cafr@m.dk and let us know the number\n                  of participants. In order to ease the registration of the participants at the information\n                  meeting please indicate the names of the participants in your registration for the\n                  meeting. Due to the size of the venue for the meeting, Metroselskabet need to limit\n                  the number of participants per interested party to a maximum of 3. The information\n                  meeting is for physical attendees only. If you prefer a digital meeting, please let\n                  us know that as well. If there is sufficient interest for a digital meeting (via TEAMS)\n                  Metroselskabet will repeat the information meeting digitally.</span></section>\n            <section>3.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Works</span></section>\n               <section><span class=\"label\">Additional nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Services</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">45000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Construction work</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">71000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Architectural, construction, engineering and inspection services</span></section>\n            </section>\n            <section>3.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n               <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n               <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n               <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            </section>\n            <section>3.1.8&nbsp;<span class=\"label\">Techniques</span><section><span class=\"label\">Framework agreement</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No framework agreement</span></section>\n               </section>\n            </section>\n            <section>3.1.9&nbsp;<span class=\"label\">Further information, mediation and review</span><section><span class=\"label\">Review organisation</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for udbud</span></section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisations</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Metroselskabet I/S</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">30823699</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Metrovej 5</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">København S</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2300</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Contact point</span><span class=\"text\">: </span><span class=\"value\">Camilla Frost Janns</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">cafr@m.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">72424573</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">www.m.dk</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Buyer</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0002</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Klagenævnet for udbud</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vestjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK041</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Review organisation</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-0000</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Publications Office of the European Union</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">PUBL</span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Luxembourg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2417</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">LU000</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Luxembourg</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">ted@publications.europa.eu</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+352 29291</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://op.europa.eu</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n      </section>\n      <section>11&nbsp;<span class=\"label\">Notice information</span><section>11.1&nbsp;<span class=\"label\">Notice information</span><section><span class=\"label\">Notice identifier/version</span><span class=\"text\">: </span><span class=\"value\">28a6c1fc-9e55-47ee-a7bd-f91def26110e</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n            <section><span class=\"label\">Form type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Planning</span></section>\n            <section><span class=\"label\">Notice type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Prior information notice or a periodic indicative notice used only for information</span></section>\n            <section><span class=\"label\">Notice dispatch date</span><span class=\"text\">: </span><span class=\"value\">28-11-2024</span><span class=\"text\"> </span><span class=\"value\">12:46 +00:00</span></section>\n            <section><span class=\"label\">Languages in which this notice is officially available</span><span class=\"text\">: </span><span class=\"dynamic-label\">English</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         </section>\n         <section>11.2&nbsp;<span class=\"label\">Publication information</span><section><span class=\"label\">Notice publication number</span><span class=\"text\">: </span><span class=\"value\">00731155-2024</span></section>\n            <section><span class=\"label\">OJ S issue number</span><span class=\"text\">: </span><span class=\"value\">233/2024</span></section>\n            <section><span class=\"label\">Publication date</span><span class=\"text\">: </span><span class=\"value\">29-11-2024</span></section>\n         </section>\n      </section>\n   </body>\n</html>","opsummeringDA":{"card":{"titel":"Early Contractor Involvement, extension of Cityringen to Nordhavn ","ordregiver":"Metroselskabet I/S ","ordregiverId":"30823699","ordregiverIdDatavasket":"30823699","publiceringsdato":"2024-11-29+01:00","cpvKode":"45000000","cpvTitel":"Bygge- og anlægsarbejder","formulartype":"Planlægning","formulartypeKode":"planning","tidsfrister":[],"alleOrdregivere":["Metroselskabet I/S "],"beskrivelse":"Nordhavn is currently Copenhagen’s fastest growing locality. The Nordhavn area is planned to grow to approximately 35.000 residents and 28.000 working places by 2050. Well-functioning public transportation is a crucial part of the growth of Nordhavn, and the M4 Cityringen metroline is therfore planned to be extended from the existing Orientkaj Station to outer Nordhavn with 2 new stations. The customers of the Copenhagen Metro expect a high level of service with functional and attractive infrastructure. The extension will be an integrated part of the existing M4 line called Cityringen Nordhavn Extension (CRNHE). \nThe Nordhavn Extension shall be a fully elevated line of approximately 1,6 km with two stations; until further called v./Levantkaj and v./Nordhavn C. \nMetroselskabet have high ambitions for the extension to Nordhavn and to accommodate the need for lowered CO2-emissions see a need to rethink design processes and constructions. On that background Metroselskabet is aiming to sign a contract with a contractor who have a team of capable and experienced consultants, able to challenge our current understanding of the architecture of the stations and viaducts as well as methods of designing and constructing a metro. \nMetroselskabet is committed to delivering world-class sustainable transportation and aims to achieve this through the adoption of new ideas and innovative solutions. Metroselskabet have identified the following areas that will be of high priority during the CRNHE project:\n•\tCollaboration\nTo accommodate the need for renewing the processes surrounding the project, Metroselskabet plans to work very closely with the contractor and the team to develop the project (see below).\n•\tPassengers\nThe existing Copenhagen metro is a high-quality public transport service that provides robust and resilient operation in addition to a good, efficient and intuitive experience for all passengers. The extension is to provide the best possible passenger experience by making use of lessons from the existing metro in operation, which shall be an integrated part of the design process from the beginning.\n•\tCarbon footprint\nIn terms of carbon footprint, Metroselskabet has an ambition to halve the carbon footprint from the construction phase of new Metro projects compared to the existing Metro at Orientkaj. The ambition shall be obtained mainly via design optimizations, new construction methods and material choices.\n•\tEmission free non-road machinery\nMetroselskabet has together with other partners defined and signed a declaration of intent, to integrate emission free non-road machinery on projects, please refer to this article describing the declaration of intent (in Danish): \"Public construction clients sign declaration of intent\".\n•\tCircular resource use\nMetroselskabet has a focus on applying the principles of circular economy in the way resources are being consumed. Metroselskabet will focus on reducing the consumption of natural resources and increase recirculation and recycling of materials and waste in constructing new Metro.\n•\tMetroselskabet is part of the City of Copenhagen’s partnership agreement for biodiversity together with 18 other landowners working to preserve and create new urban nature in the city. \n•\tDigital\nThe goal of our digital ambition is to ensure that the project use digital solutions for innovation, sustainability, and to support efficient infrastructure solution that meets requirements for high quality, environmental considerations and advanced operations throughout the entire project lifecycle.\nCurrently, Metroselskabet is finalizing documentation for the tender. The project will be tendered out as a design and build contract (ABT18) with an in-built close collaboration phase, where Metroselskabet together with the contractor and the contractor´s consultants will develop the design for the viaducts and the architecture of the stations. The tender documentation will have a very strong focus on the collaboration between the parties to achieve our ambitious goals for the project. Metroselskabet expects the contractor to bring consultants which are capable of executing the project but also consultants & architects to challenge the current perception of the architecture of the stations without compromising the passenger experience.\nMetroselskabet intends to use competitive dialogue as the procurement procedure as Metroselskabet intends to develop the final tender documentation with inputs from the tenderers. The tender is expected to be released early 2025. \nMetroselskabet would like to invite all interested parties to an information meeting on 2024.12.16 at 14:30-16:30 (local Danish time). The information meeting will be held at: Metroselskabet, Metrovej 5, 2300 Copenhagen S.  \nPlease, register for the meeting by emailing cafr@m.dk and let us know the number of participants. In order to ease the registration of the participants at the information meeting please indicate the names of the participants in your registration for the meeting. Due to the size of the venue for the meeting, Metroselskabet need to limit the number of participants per interested party to a maximum of 3.\nThe information meeting is for physical attendees only. If you prefer a digital meeting, please let us know that as well. If there is sufficient interest for a digital meeting (via TEAMS) Metroselskabet will repeat the information meeting digitally.\n","bkSubTypeKode":"5","bkSubType":"Vejledende periodisk bekendtgørelse kun anvendt til informationsformål – sektordirektivet","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":["DK011"],"udforelsesstedSubLand":["Byen København"],"udforelsesstedLand":["Danmark"],"udforelsesstedBy":["København S"],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"antalParts":1,"antalLots":0,"udbudsDokumenter":[]},"opsummeringEN":{"card":{"titel":"Early Contractor Involvement, extension of Cityringen to Nordhavn ","ordregiver":"Metroselskabet I/S ","ordregiverId":"30823699","ordregiverIdDatavasket":"30823699","publiceringsdato":"2024-11-29+01:00","cpvKode":"45000000","cpvTitel":"Construction work","formulartype":"Planning","formulartypeKode":"planning","tidsfrister":[],"alleOrdregivere":["Metroselskabet I/S "],"beskrivelse":"Nordhavn is currently Copenhagen’s fastest growing locality. The Nordhavn area is planned to grow to approximately 35.000 residents and 28.000 working places by 2050. Well-functioning public transportation is a crucial part of the growth of Nordhavn, and the M4 Cityringen metroline is therfore planned to be extended from the existing Orientkaj Station to outer Nordhavn with 2 new stations. The customers of the Copenhagen Metro expect a high level of service with functional and attractive infrastructure. The extension will be an integrated part of the existing M4 line called Cityringen Nordhavn Extension (CRNHE). \nThe Nordhavn Extension shall be a fully elevated line of approximately 1,6 km with two stations; until further called v./Levantkaj and v./Nordhavn C. \nMetroselskabet have high ambitions for the extension to Nordhavn and to accommodate the need for lowered CO2-emissions see a need to rethink design processes and constructions. On that background Metroselskabet is aiming to sign a contract with a contractor who have a team of capable and experienced consultants, able to challenge our current understanding of the architecture of the stations and viaducts as well as methods of designing and constructing a metro. \nMetroselskabet is committed to delivering world-class sustainable transportation and aims to achieve this through the adoption of new ideas and innovative solutions. Metroselskabet have identified the following areas that will be of high priority during the CRNHE project:\n•\tCollaboration\nTo accommodate the need for renewing the processes surrounding the project, Metroselskabet plans to work very closely with the contractor and the team to develop the project (see below).\n•\tPassengers\nThe existing Copenhagen metro is a high-quality public transport service that provides robust and resilient operation in addition to a good, efficient and intuitive experience for all passengers. The extension is to provide the best possible passenger experience by making use of lessons from the existing metro in operation, which shall be an integrated part of the design process from the beginning.\n•\tCarbon footprint\nIn terms of carbon footprint, Metroselskabet has an ambition to halve the carbon footprint from the construction phase of new Metro projects compared to the existing Metro at Orientkaj. The ambition shall be obtained mainly via design optimizations, new construction methods and material choices.\n•\tEmission free non-road machinery\nMetroselskabet has together with other partners defined and signed a declaration of intent, to integrate emission free non-road machinery on projects, please refer to this article describing the declaration of intent (in Danish): \"Public construction clients sign declaration of intent\".\n•\tCircular resource use\nMetroselskabet has a focus on applying the principles of circular economy in the way resources are being consumed. Metroselskabet will focus on reducing the consumption of natural resources and increase recirculation and recycling of materials and waste in constructing new Metro.\n•\tMetroselskabet is part of the City of Copenhagen’s partnership agreement for biodiversity together with 18 other landowners working to preserve and create new urban nature in the city. \n•\tDigital\nThe goal of our digital ambition is to ensure that the project use digital solutions for innovation, sustainability, and to support efficient infrastructure solution that meets requirements for high quality, environmental considerations and advanced operations throughout the entire project lifecycle.\nCurrently, Metroselskabet is finalizing documentation for the tender. The project will be tendered out as a design and build contract (ABT18) with an in-built close collaboration phase, where Metroselskabet together with the contractor and the contractor´s consultants will develop the design for the viaducts and the architecture of the stations. The tender documentation will have a very strong focus on the collaboration between the parties to achieve our ambitious goals for the project. Metroselskabet expects the contractor to bring consultants which are capable of executing the project but also consultants & architects to challenge the current perception of the architecture of the stations without compromising the passenger experience.\nMetroselskabet intends to use competitive dialogue as the procurement procedure as Metroselskabet intends to develop the final tender documentation with inputs from the tenderers. The tender is expected to be released early 2025. \nMetroselskabet would like to invite all interested parties to an information meeting on 2024.12.16 at 14:30-16:30 (local Danish time). The information meeting will be held at: Metroselskabet, Metrovej 5, 2300 Copenhagen S.  \nPlease, register for the meeting by emailing cafr@m.dk and let us know the number of participants. In order to ease the registration of the participants at the information meeting please indicate the names of the participants in your registration for the meeting. Due to the size of the venue for the meeting, Metroselskabet need to limit the number of participants per interested party to a maximum of 3.\nThe information meeting is for physical attendees only. If you prefer a digital meeting, please let us know that as well. If there is sufficient interest for a digital meeting (via TEAMS) Metroselskabet will repeat the information meeting digitally.\n","bkSubTypeKode":"5","bkSubType":"Periodic indicative notice used only for information – sectoral directive","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":["DK011"],"udforelsesstedSubLand":["Byen København"],"udforelsesstedLand":["Denmark"],"udforelsesstedBy":["København S"],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"antalParts":1,"antalLots":0,"udbudsDokumenter":[]}}