{"bekendtgoerelseNoegle":{"noticeId":{"value":"0479d785-0f7f-4874-aefe-2014d4b01d8a"},"noticeVersion":{"value":"01"},"noticePublicationNumber":{"value":"00500706-2026"}},"htmlDA":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Køber</span><section>1.1&nbsp;<span class=\"label\">Køber</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Energinet Gastransmission A/S</span></section>\n            <section><span class=\"label\">Køberens retlige status</span><span class=\"text\">: </span><span class=\"dynamic-label\">Offentlig virksomhed</span></section>\n            <section><span class=\"label\">Den ordregivende enheds aktiviteter</span><span class=\"text\">: </span><span class=\"dynamic-label\">Produktion, transport eller distribution af gas eller varme</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Market Dialogue on Three Core Processes for Future Market System at Energinet</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">As hydrogen infrastructure is expected to be established in Denmark, there is a need\n                  for a market system that can support three key market management processes. At the\n                  same time, the existing methane infrastructure will need to be supported by a new\n                  system solution.<br/><br/>Nomination – The shipper informs Energinet of the desired\n                  transportation quantity for a given time period as the basis for matching and balancing.\n                  Nominations and renominations are expected to be submitted at 15-minute intervals.<br/><br/>Matching\n                  – Ensuring that transported quantities are aligned between two system operators with\n                  corresponding opposite values.<br/><br/>Allocation – Ensuring correct allocation of\n                  physical measurements and the commercial outcome of matching as the basis for balance\n                  calculation and system management.<br/><br/>A similar need exists for methane, as\n                  the intention is to harmonize the systems for methane and hydrogen.<br/><br/>The purpose\n                  of this Request for Information (RFI) is to identify available software solutions\n                  in the market that can support the processes described above. Energinet wishes to\n                  explore whether standard systems are available that can be configured to support both\n                  methane and hydrogen in separate instances with different configurations.<br/><br/>The\n                  solution is expected to comply with applicable EU rules for the transportation of\n                  methane and hydrogen. At present, the following regulations and network codes are\n                  relevant:<br/><br/>The Danish Gas Supply Act and EU Regulation 2024/1789<br/><br/>Balancing\n                  NC | ENTSOG (https://www.entsog.eu/balancing-nc)<br/><br/>Interoperability and Data\n                  Exchange NC | ENTSOG (https://www.entsog.eu/interoperability-and-data-exchange-nc)<br/><br/>Timeline:<br/><br/>RFI\n                  to be issued in mid-July<br/><br/>Deadline for questions: 31 August<br/><br/>RFI expected\n                  to be completed by 7 September<br/><br/>Deadline for questions: 31 August<br/><br/>Deadline\n                  for answers to questions: 7 September<br/><br/>The market dialogue is expected to\n                  begin in week 37 via Microsoft Teams. The expected meeting duration is two hours.<br/><br/>Implementation\n                  and go-live must be completed by the end of June 2029.<br/><br/>Description of the\n                  procurement:<br/><br/>Energinet is exploring the possibility of procuring a market\n                  system that can support key business processes related to the operation and development\n                  of a hydrogen market. The system must also support the existing methane market. It\n                  is expected to handle and support market processes such as nomination, matching and\n                  allocation, as well as data exchange between relevant market participants and internal\n                  and external systems.<br/><br/>The procurement is expected to cover an overall solution\n                  capable of supporting both functional and technical needs, including configuration,\n                  integration, testing, implementation, documentation, operations, support and ongoing\n                  maintenance. It has not yet been determined whether the solution should be based on\n                  a standard solution, a configurable platform, custom development or a combination\n                  of these. Energinet’s preference is to make maximum use of standard and configurable\n                  functionality.<br/><br/>Through the market dialogue, Energinet wishes to obtain market\n                  input on possible solution models, delivery approaches, implementation processes,\n                  dependencies, risks and commercial conditions. This input will be used to qualify\n                  the further work on requirements, scope, timeline and a potential tender strategy.<br/><br/>After\n                  7 September, Energinet expects to select 3-5 suppliers to be invited to participate\n                  in dialogue meetings starting in week 37.<br/><br/>Energinet would appreciate receiving\n                  answers to the following questions by 31 August:<br/><br/>1.Product maturity<br/><br/>•Are\n                  genuine standard solutions available for nomination, matching and allocation?<br/><br/>•Which\n                  TSOs or markets currently use the solution?<br/><br/>2.Adaptation to Danish conditions<br/><br/>•To\n                  what extent can configuration be carried out without code changes?<br/><br/>•What\n                  level of adaptation is expected in relation to Danish market rules and the balancing\n                  model?<br/><br/>•Which parts of the solution are typically customer-specific?<br/><br/>3.Changes\n                  to market rules<br/><br/>•How are changes to market rules handled after go-live?<br/><br/>•Can\n                  such changes be handled through configuration, or do they require development?<br/><br/>•What\n                  are the typical implementation timelines for rule changes?<br/><br/>4.Architecture\n                  and critical logic<br/><br/>•Where is the logic for balancing, cut-off, validation\n                  and allocation located?<br/><br/>•Can critical logic be separated from the standard\n                  system?<br/><br/>5.Implementation and timeline<br/><br/>•What would be a realistic\n                  implementation period for a solution of this type?<br/><br/>•What are considered the\n                  greatest risks to achieving go-live in July 2029?<br/><br/>6.Deployment and platform<br/><br/>•Can\n                  the solution run on-premises?<br/><br/>•Can the solution run in a private cloud?<br/><br/>•Can\n                  the solution run in a public cloud?<br/><br/>•Are there any functional differences\n                  between the deployment models?<br/><br/>7.Hydrogen and methane<br/><br/>•Does the\n                  solution support both hydrogen and methane?<br/><br/>•Can different market rules for\n                  hydrogen and methane be handled through configuration?<br/><br/>•Can a single installation\n                  support both gas types simultaneously?<br/><br/>•How are diverging regulatory frameworks\n                  for hydrogen and methane markets handled?<br/><br/>Energinet would appreciate receiving\n                  your available time slots for participation in a Teams meeting in week 37, 38 or 39\n                  (7 to 25 September)<br/><br/>Please communicate via the tender platform Comdia</span></section>\n            <section><span class=\"label\">Intern ID</span><span class=\"text\">: </span><span class=\"value\">763547</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tjenesteydelser</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">72000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">It-tjenester: rådgivning, programmeludvikling, internet og support</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">48100000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Branchespecifik programpakke</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">72210000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Programmeringsservice i forbindelse med programmelpakker</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n               <section><span class=\"dynamic-label\">Hvor som helst i det pågældende land</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Retsgrundlag</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Direktiv 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>3&nbsp;<span class=\"label\">Del</span><section>3.1&nbsp;<span class=\"label\">Del</span><span class=\"text\">: </span><span class=\"value\">PAR-0000</span><section><span class=\"label\">Titel</span><span class=\"text\">: </span><span class=\"value\">Market Dialogue on Three Core Processes for Future Market System at Energinet</span></section>\n            <section><span class=\"label\">Beskrivelse</span><span class=\"text\">: </span><span class=\"value\">As hydrogen infrastructure is expected to be established in Denmark, there is a need\n                  for a market system that can support three key market management processes. At the\n                  same time, the existing methane infrastructure will need to be supported by a new\n                  system solution.<br/><br/>Nomination – The shipper informs Energinet of the desired\n                  transportation quantity for a given time period as the basis for matching and balancing.\n                  Nominations and renominations are expected to be submitted at 15-minute intervals.<br/><br/>Matching\n                  – Ensuring that transported quantities are aligned between two system operators with\n                  corresponding opposite values.<br/><br/>Allocation – Ensuring correct allocation of\n                  physical measurements and the commercial outcome of matching as the basis for balance\n                  calculation and system management.<br/><br/>A similar need exists for methane, as\n                  the intention is to harmonize the systems for methane and hydrogen.<br/><br/>The purpose\n                  of this Request for Information (RFI) is to identify available software solutions\n                  in the market that can support the processes described above. Energinet wishes to\n                  explore whether standard systems are available that can be configured to support both\n                  methane and hydrogen in separate instances with different configurations.<br/><br/>The\n                  solution is expected to comply with applicable EU rules for the transportation of\n                  methane and hydrogen. At present, the following regulations and network codes are\n                  relevant:<br/><br/>The Danish Gas Supply Act and EU Regulation 2024/1789<br/><br/>Balancing\n                  NC | ENTSOG (https://www.entsog.eu/balancing-nc)<br/><br/>Interoperability and Data\n                  Exchange NC | ENTSOG (https://www.entsog.eu/interoperability-and-data-exchange-nc)<br/><br/>Timeline:<br/><br/>RFI\n                  to be issued in mid-July<br/><br/>Deadline for questions: 31 August<br/><br/>RFI expected\n                  to be completed by 7 September<br/><br/>Deadline for questions: 31 August<br/><br/>Deadline\n                  for answers to questions: 7 September<br/><br/>The market dialogue is expected to\n                  begin in week 37 via Microsoft Teams. The expected meeting duration is two hours.<br/><br/>Implementation\n                  and go-live must be completed by the end of June 2029.<br/><br/>Description of the\n                  procurement:<br/><br/>Energinet is exploring the possibility of procuring a market\n                  system that can support key business processes related to the operation and development\n                  of a hydrogen market. The system must also support the existing methane market. It\n                  is expected to handle and support market processes such as nomination, matching and\n                  allocation, as well as data exchange between relevant market participants and internal\n                  and external systems.<br/><br/>The procurement is expected to cover an overall solution\n                  capable of supporting both functional and technical needs, including configuration,\n                  integration, testing, implementation, documentation, operations, support and ongoing\n                  maintenance. It has not yet been determined whether the solution should be based on\n                  a standard solution, a configurable platform, custom development or a combination\n                  of these. Energinet’s preference is to make maximum use of standard and configurable\n                  functionality.<br/><br/>Through the market dialogue, Energinet wishes to obtain market\n                  input on possible solution models, delivery approaches, implementation processes,\n                  dependencies, risks and commercial conditions. This input will be used to qualify\n                  the further work on requirements, scope, timeline and a potential tender strategy.<br/><br/>After\n                  7 September, Energinet expects to select 3-5 suppliers to be invited to participate\n                  in dialogue meetings starting in week 37.<br/><br/>Energinet would appreciate receiving\n                  answers to the following questions by 31 August:<br/><br/>1.Product maturity<br/><br/>•Are\n                  genuine standard solutions available for nomination, matching and allocation?<br/><br/>•Which\n                  TSOs or markets currently use the solution?<br/><br/>2.Adaptation to Danish conditions<br/><br/>•To\n                  what extent can configuration be carried out without code changes?<br/><br/>•What\n                  level of adaptation is expected in relation to Danish market rules and the balancing\n                  model?<br/><br/>•Which parts of the solution are typically customer-specific?<br/><br/>3.Changes\n                  to market rules<br/><br/>•How are changes to market rules handled after go-live?<br/><br/>•Can\n                  such changes be handled through configuration, or do they require development?<br/><br/>•What\n                  are the typical implementation timelines for rule changes?<br/><br/>4.Architecture\n                  and critical logic<br/><br/>•Where is the logic for balancing, cut-off, validation\n                  and allocation located?<br/><br/>•Can critical logic be separated from the standard\n                  system?<br/><br/>5.Implementation and timeline<br/><br/>•What would be a realistic\n                  implementation period for a solution of this type?<br/><br/>•What are considered the\n                  greatest risks to achieving go-live in July 2029?<br/><br/>6.Deployment and platform<br/><br/>•Can\n                  the solution run on-premises?<br/><br/>•Can the solution run in a private cloud?<br/><br/>•Can\n                  the solution run in a public cloud?<br/><br/>•Are there any functional differences\n                  between the deployment models?<br/><br/>7.Hydrogen and methane<br/><br/>•Does the\n                  solution support both hydrogen and methane?<br/><br/>•Can different market rules for\n                  hydrogen and methane be handled through configuration?<br/><br/>•Can a single installation\n                  support both gas types simultaneously?<br/><br/>•How are diverging regulatory frameworks\n                  for hydrogen and methane markets handled?<br/><br/>Energinet would appreciate receiving\n                  your available time slots for participation in a Teams meeting in week 37, 38 or 39\n                  (7 to 25 September)<br/><br/>Please communicate via the tender platform Comdia</span></section>\n            <section><span class=\"label\">Intern ID</span><span class=\"text\">: </span><span class=\"value\">763547</span></section>\n            <section>3.1.1&nbsp;<span class=\"label\">Formål</span><section><span class=\"label\">Kontraktens hovedformål</span><span class=\"text\">: </span><span class=\"dynamic-label\">Tjenesteydelser</span></section>\n               <section><span class=\"label\">Primær klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">72000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">It-tjenester: rådgivning, programmeludvikling, internet og support</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">48100000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Branchespecifik programpakke</span></section>\n               <section><span class=\"label\">Supplerende klassifikation</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">72210000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Programmeringsservice i forbindelse med programmelpakker</span></section>\n            </section>\n            <section>3.1.2&nbsp;<span class=\"label\">Udførelsessted</span><section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n               <section><span class=\"dynamic-label\">Hvor som helst i det pågældende land</span></section>\n            </section>\n            <section>3.1.3&nbsp;<span class=\"label\">Varighed</span><section><span class=\"label\">Startdato</span><span class=\"text\">: </span><span class=\"value\">17-07-2026</span></section>\n               <section><span class=\"label\">Varigheds slutdato</span><span class=\"text\">: </span><span class=\"value\">30-09-2026</span></section>\n            </section>\n            <section>3.1.5&nbsp;<span class=\"label\">Generelle oplysninger</span><section><span class=\"label\">Reserveret deltagelse</span><span class=\"text\">: </span><span class=\"dynamic-label\">Deltagelse uden forbehold.</span></section>\n               <section><span class=\"label\">Udbuddet er omfattet af aftalen om offentlige udbud (GPA)</span><span class=\"text\">: </span><span class=\"label\">ja</span></section>\n            </section>\n            <section>3.1.6&nbsp;<span class=\"label\">Tilbudsdokumenter</span><section><span class=\"label\">Adresse på udbudsdokumenterne</span><span class=\"text\">: </span><span class=\"value\">https://www.comdia.com/energinet/md/market_dialogue_on_three_core_processes_for_future_market_system_at_energinet\n                     , </span></section>\n            </section>\n            <section>3.1.7&nbsp;<span class=\"label\">Tilbudsvilkår</span><section><span class=\"label\">Udførelsen af kontrakten skal ske inden for rammerne af programmer for beskyttet beskæftigelse</span><span class=\"text\">: </span><span class=\"dynamic-label\">Nej</span></section>\n            </section>\n            <section>3.1.8&nbsp;<span class=\"label\">Teknikker</span><section><span class=\"label\">Rammeaftale</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Ingen rammeaftale</span></section>\n               </section>\n               <section><span class=\"label\">Oplysninger om det dynamiske indkøbssystem</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">Intet dynamisk indkøbssystem</span></section>\n               </section>\n            </section>\n            <section>3.1.9&nbsp;<span class=\"label\">Yderligere oplysninger, mægling og gennemgang</span><section><span class=\"label\">Organisation med ansvar for klager</span><span class=\"text\">: </span><span class=\"value\">Danish Complaints Board for Public Procurement</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation, der leverer supplerende oplysninger om udbudsproceduren</span><span class=\"text\">: </span><span class=\"value\">Energinet Gastransmission A/S</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation, der leverer yderligere oplysninger om klageprocedurerne</span><span class=\"text\">: </span><span class=\"value\">Danish Competition and Consumer Authority</span><span class=\"value\"></span></section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisationer</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Energinet Gastransmission A/S</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">39315084</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Tonne Kjærsvej 65</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Fredericia</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">7000</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">Enhed</span><span class=\"text\">: </span><span class=\"value\">Kirsten Ebstrup</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">procurement@energinet.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">70102244</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://energinet.dk/</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Køber</span></section>\n               <section><span class=\"label\">Organisation, der leverer supplerende oplysninger om udbudsproceduren</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1000</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Comdia ApS</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">33501404</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Lindvedvej 71</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Odense S</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">5260</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Fyn</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK031</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">support@comdia.com</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 7199 3672</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://www.comdia.com/</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1001</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Danish Complaints Board for Public Procurement</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Danish Appeals Boards Authority, Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vestjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK041</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">klfu@naevneneshus.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 7240 5600</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">http://www.klfu.dk</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation med ansvar for klager</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1002</span><section><span class=\"label\">Officielt navn</span><span class=\"text\">: </span><span class=\"value\">Danish Competition and Consumer Authority</span></section>\n            <section><span class=\"label\">Registreringsnummer</span><span class=\"text\">: </span><span class=\"value\">10294819</span></section>\n            <section><span class=\"label\">Postadresse</span><span class=\"text\">: </span><span class=\"value\">Carl Jacobsens Vej 35</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">By</span><span class=\"text\">: </span><span class=\"value\">Valby</span></section>\n            <section><span class=\"label\">Postnummer</span><span class=\"text\">: </span><span class=\"value\">2500</span></section>\n            <section><span class=\"label\">Landsdel (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Land</span><span class=\"text\">: </span><span class=\"dynamic-label\">Danmark</span></section>\n            <section><span class=\"label\">E-mail</span><span class=\"text\">: </span><span class=\"value\">kfst@kfst.dk</span></section>\n            <section><span class=\"label\">Telefon</span><span class=\"text\">: </span><span class=\"value\">+45 4171 5000</span></section>\n            <section><span class=\"label\">Internetadresse</span><span class=\"text\">: </span><span class=\"value\">https://www.kfst.dk/</span></section>\n            <section><span class=\"label\">Denne organisations roller</span><span class=\"text\">:</span><section><span class=\"label\">Organisation, der leverer yderligere oplysninger om klageprocedurerne</span></section>\n            </section>\n         </section>\n      </section>\n      <section><span class=\"label\">Oplysninger om bekendtgørelsen</span><section><span class=\"label\">Bekendtgørelsens ID</span><span class=\"text\">: </span><span class=\"value\">0479d785-0f7f-4874-aefe-2014d4b01d8a</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n         <section><span class=\"label\">Formulartype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Planlægning</span></section>\n         <section><span class=\"label\">Bekendtgørelsestype</span><span class=\"text\">: </span><span class=\"dynamic-label\">Forhåndsmeddelelse eller vejledende periodisk bekendtgørelse, der kun er anvendt til informationsformål</span></section>\n         <section><span class=\"label\">Afsendelsesdato for bekendtgørelsen</span><span class=\"text\">: </span><span class=\"value\">17-07-2026</span><span class=\"text\"> </span><span class=\"value\">14:39 +02:00</span></section>\n         <section><span class=\"label\">Bekendtgørelsens officielle sprog</span><span class=\"text\">: </span><span class=\"dynamic-label\">engelsk</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         <section><span class=\"label\">Bekendtgørelsesnummer</span><span class=\"text\">: </span><span class=\"value\">00500706-2026</span></section>\n         <section><span class=\"label\">EUT-S-nummer</span><span class=\"text\">: </span><span class=\"value\">137/2026</span></section>\n         <section><span class=\"label\">Offentliggørelsesdato</span><span class=\"text\">: </span><span class=\"value\">20-07-2026</span></section>\n      </section>\n   </body>\n</html>","htmlEN":"<!DOCTYPE HTML>\n<html xmlns:cac=\"urn:oasis:names:specification:ubl:schema:xsd:CommonAggregateComponents-2\" xmlns:cbc=\"urn:oasis:names:specification:ubl:schema:xsd:CommonBasicComponents-2\" xmlns:efac=\"http://data.europa.eu/p27/eforms-ubl-extension-aggregate-components/1\" xmlns:efbc=\"http://data.europa.eu/p27/eforms-ubl-extension-basic-components/1\" xmlns:efext=\"http://data.europa.eu/p27/eforms-ubl-extensions/1\" xmlns:ext=\"urn:oasis:names:specification:ubl:schema:xsd:CommonExtensionComponents-2\" xmlns:fn=\"http://www.w3.org/2005/xpath-functions\" xmlns:xs=\"http://www.w3.org/2001/XMLSchema\">\n   <body>\n      <section>1&nbsp;<span class=\"label\">Buyer</span><section>1.1&nbsp;<span class=\"label\">Buyer</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Energinet Gastransmission A/S</span></section>\n            <section><span class=\"label\">Legal type of the buyer</span><span class=\"text\">: </span><span class=\"dynamic-label\">Public undertaking</span></section>\n            <section><span class=\"label\">Activity of the contracting entity</span><span class=\"text\">: </span><span class=\"dynamic-label\">Production, transport or distribution of gas or heat</span></section>\n         </section>\n      </section>\n      <section>2&nbsp;<span class=\"label\">Procedure</span><section>2.1&nbsp;<span class=\"label\">Procedure</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Market Dialogue on Three Core Processes for Future Market System at Energinet</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">As hydrogen infrastructure is expected to be established in Denmark, there is a need\n                  for a market system that can support three key market management processes. At the\n                  same time, the existing methane infrastructure will need to be supported by a new\n                  system solution.<br/><br/>Nomination – The shipper informs Energinet of the desired\n                  transportation quantity for a given time period as the basis for matching and balancing.\n                  Nominations and renominations are expected to be submitted at 15-minute intervals.<br/><br/>Matching\n                  – Ensuring that transported quantities are aligned between two system operators with\n                  corresponding opposite values.<br/><br/>Allocation – Ensuring correct allocation of\n                  physical measurements and the commercial outcome of matching as the basis for balance\n                  calculation and system management.<br/><br/>A similar need exists for methane, as\n                  the intention is to harmonize the systems for methane and hydrogen.<br/><br/>The purpose\n                  of this Request for Information (RFI) is to identify available software solutions\n                  in the market that can support the processes described above. Energinet wishes to\n                  explore whether standard systems are available that can be configured to support both\n                  methane and hydrogen in separate instances with different configurations.<br/><br/>The\n                  solution is expected to comply with applicable EU rules for the transportation of\n                  methane and hydrogen. At present, the following regulations and network codes are\n                  relevant:<br/><br/>The Danish Gas Supply Act and EU Regulation 2024/1789<br/><br/>Balancing\n                  NC | ENTSOG (https://www.entsog.eu/balancing-nc)<br/><br/>Interoperability and Data\n                  Exchange NC | ENTSOG (https://www.entsog.eu/interoperability-and-data-exchange-nc)<br/><br/>Timeline:<br/><br/>RFI\n                  to be issued in mid-July<br/><br/>Deadline for questions: 31 August<br/><br/>RFI expected\n                  to be completed by 7 September<br/><br/>Deadline for questions: 31 August<br/><br/>Deadline\n                  for answers to questions: 7 September<br/><br/>The market dialogue is expected to\n                  begin in week 37 via Microsoft Teams. The expected meeting duration is two hours.<br/><br/>Implementation\n                  and go-live must be completed by the end of June 2029.<br/><br/>Description of the\n                  procurement:<br/><br/>Energinet is exploring the possibility of procuring a market\n                  system that can support key business processes related to the operation and development\n                  of a hydrogen market. The system must also support the existing methane market. It\n                  is expected to handle and support market processes such as nomination, matching and\n                  allocation, as well as data exchange between relevant market participants and internal\n                  and external systems.<br/><br/>The procurement is expected to cover an overall solution\n                  capable of supporting both functional and technical needs, including configuration,\n                  integration, testing, implementation, documentation, operations, support and ongoing\n                  maintenance. It has not yet been determined whether the solution should be based on\n                  a standard solution, a configurable platform, custom development or a combination\n                  of these. Energinet’s preference is to make maximum use of standard and configurable\n                  functionality.<br/><br/>Through the market dialogue, Energinet wishes to obtain market\n                  input on possible solution models, delivery approaches, implementation processes,\n                  dependencies, risks and commercial conditions. This input will be used to qualify\n                  the further work on requirements, scope, timeline and a potential tender strategy.<br/><br/>After\n                  7 September, Energinet expects to select 3-5 suppliers to be invited to participate\n                  in dialogue meetings starting in week 37.<br/><br/>Energinet would appreciate receiving\n                  answers to the following questions by 31 August:<br/><br/>1.Product maturity<br/><br/>•Are\n                  genuine standard solutions available for nomination, matching and allocation?<br/><br/>•Which\n                  TSOs or markets currently use the solution?<br/><br/>2.Adaptation to Danish conditions<br/><br/>•To\n                  what extent can configuration be carried out without code changes?<br/><br/>•What\n                  level of adaptation is expected in relation to Danish market rules and the balancing\n                  model?<br/><br/>•Which parts of the solution are typically customer-specific?<br/><br/>3.Changes\n                  to market rules<br/><br/>•How are changes to market rules handled after go-live?<br/><br/>•Can\n                  such changes be handled through configuration, or do they require development?<br/><br/>•What\n                  are the typical implementation timelines for rule changes?<br/><br/>4.Architecture\n                  and critical logic<br/><br/>•Where is the logic for balancing, cut-off, validation\n                  and allocation located?<br/><br/>•Can critical logic be separated from the standard\n                  system?<br/><br/>5.Implementation and timeline<br/><br/>•What would be a realistic\n                  implementation period for a solution of this type?<br/><br/>•What are considered the\n                  greatest risks to achieving go-live in July 2029?<br/><br/>6.Deployment and platform<br/><br/>•Can\n                  the solution run on-premises?<br/><br/>•Can the solution run in a private cloud?<br/><br/>•Can\n                  the solution run in a public cloud?<br/><br/>•Are there any functional differences\n                  between the deployment models?<br/><br/>7.Hydrogen and methane<br/><br/>•Does the\n                  solution support both hydrogen and methane?<br/><br/>•Can different market rules for\n                  hydrogen and methane be handled through configuration?<br/><br/>•Can a single installation\n                  support both gas types simultaneously?<br/><br/>•How are diverging regulatory frameworks\n                  for hydrogen and methane markets handled?<br/><br/>Energinet would appreciate receiving\n                  your available time slots for participation in a Teams meeting in week 37, 38 or 39\n                  (7 to 25 September)<br/><br/>Please communicate via the tender platform Comdia</span></section>\n            <section><span class=\"label\">Internal identifier</span><span class=\"text\">: </span><span class=\"value\">763547</span></section>\n            <section>2.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Services</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">72000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">IT services: consulting, software development, Internet and support</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">48100000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Industry specific software package</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">72210000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Programming services of packaged software products</span></section>\n            </section>\n            <section>2.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n               <section><span class=\"dynamic-label\">Anywhere in the given country</span></section>\n            </section>\n            <section>2.1.4&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Legal basis</span><span class=\"text\">:</span></section>\n               <section><span class=\"dynamic-label\">Directive 2014/25/EU</span></section>\n            </section>\n         </section>\n      </section>\n      <section>3&nbsp;<span class=\"label\">Part</span><section>3.1&nbsp;<span class=\"label\">Part</span><span class=\"text\">: </span><span class=\"value\">PAR-0000</span><section><span class=\"label\">Title</span><span class=\"text\">: </span><span class=\"value\">Market Dialogue on Three Core Processes for Future Market System at Energinet</span></section>\n            <section><span class=\"label\">Description</span><span class=\"text\">: </span><span class=\"value\">As hydrogen infrastructure is expected to be established in Denmark, there is a need\n                  for a market system that can support three key market management processes. At the\n                  same time, the existing methane infrastructure will need to be supported by a new\n                  system solution.<br/><br/>Nomination – The shipper informs Energinet of the desired\n                  transportation quantity for a given time period as the basis for matching and balancing.\n                  Nominations and renominations are expected to be submitted at 15-minute intervals.<br/><br/>Matching\n                  – Ensuring that transported quantities are aligned between two system operators with\n                  corresponding opposite values.<br/><br/>Allocation – Ensuring correct allocation of\n                  physical measurements and the commercial outcome of matching as the basis for balance\n                  calculation and system management.<br/><br/>A similar need exists for methane, as\n                  the intention is to harmonize the systems for methane and hydrogen.<br/><br/>The purpose\n                  of this Request for Information (RFI) is to identify available software solutions\n                  in the market that can support the processes described above. Energinet wishes to\n                  explore whether standard systems are available that can be configured to support both\n                  methane and hydrogen in separate instances with different configurations.<br/><br/>The\n                  solution is expected to comply with applicable EU rules for the transportation of\n                  methane and hydrogen. At present, the following regulations and network codes are\n                  relevant:<br/><br/>The Danish Gas Supply Act and EU Regulation 2024/1789<br/><br/>Balancing\n                  NC | ENTSOG (https://www.entsog.eu/balancing-nc)<br/><br/>Interoperability and Data\n                  Exchange NC | ENTSOG (https://www.entsog.eu/interoperability-and-data-exchange-nc)<br/><br/>Timeline:<br/><br/>RFI\n                  to be issued in mid-July<br/><br/>Deadline for questions: 31 August<br/><br/>RFI expected\n                  to be completed by 7 September<br/><br/>Deadline for questions: 31 August<br/><br/>Deadline\n                  for answers to questions: 7 September<br/><br/>The market dialogue is expected to\n                  begin in week 37 via Microsoft Teams. The expected meeting duration is two hours.<br/><br/>Implementation\n                  and go-live must be completed by the end of June 2029.<br/><br/>Description of the\n                  procurement:<br/><br/>Energinet is exploring the possibility of procuring a market\n                  system that can support key business processes related to the operation and development\n                  of a hydrogen market. The system must also support the existing methane market. It\n                  is expected to handle and support market processes such as nomination, matching and\n                  allocation, as well as data exchange between relevant market participants and internal\n                  and external systems.<br/><br/>The procurement is expected to cover an overall solution\n                  capable of supporting both functional and technical needs, including configuration,\n                  integration, testing, implementation, documentation, operations, support and ongoing\n                  maintenance. It has not yet been determined whether the solution should be based on\n                  a standard solution, a configurable platform, custom development or a combination\n                  of these. Energinet’s preference is to make maximum use of standard and configurable\n                  functionality.<br/><br/>Through the market dialogue, Energinet wishes to obtain market\n                  input on possible solution models, delivery approaches, implementation processes,\n                  dependencies, risks and commercial conditions. This input will be used to qualify\n                  the further work on requirements, scope, timeline and a potential tender strategy.<br/><br/>After\n                  7 September, Energinet expects to select 3-5 suppliers to be invited to participate\n                  in dialogue meetings starting in week 37.<br/><br/>Energinet would appreciate receiving\n                  answers to the following questions by 31 August:<br/><br/>1.Product maturity<br/><br/>•Are\n                  genuine standard solutions available for nomination, matching and allocation?<br/><br/>•Which\n                  TSOs or markets currently use the solution?<br/><br/>2.Adaptation to Danish conditions<br/><br/>•To\n                  what extent can configuration be carried out without code changes?<br/><br/>•What\n                  level of adaptation is expected in relation to Danish market rules and the balancing\n                  model?<br/><br/>•Which parts of the solution are typically customer-specific?<br/><br/>3.Changes\n                  to market rules<br/><br/>•How are changes to market rules handled after go-live?<br/><br/>•Can\n                  such changes be handled through configuration, or do they require development?<br/><br/>•What\n                  are the typical implementation timelines for rule changes?<br/><br/>4.Architecture\n                  and critical logic<br/><br/>•Where is the logic for balancing, cut-off, validation\n                  and allocation located?<br/><br/>•Can critical logic be separated from the standard\n                  system?<br/><br/>5.Implementation and timeline<br/><br/>•What would be a realistic\n                  implementation period for a solution of this type?<br/><br/>•What are considered the\n                  greatest risks to achieving go-live in July 2029?<br/><br/>6.Deployment and platform<br/><br/>•Can\n                  the solution run on-premises?<br/><br/>•Can the solution run in a private cloud?<br/><br/>•Can\n                  the solution run in a public cloud?<br/><br/>•Are there any functional differences\n                  between the deployment models?<br/><br/>7.Hydrogen and methane<br/><br/>•Does the\n                  solution support both hydrogen and methane?<br/><br/>•Can different market rules for\n                  hydrogen and methane be handled through configuration?<br/><br/>•Can a single installation\n                  support both gas types simultaneously?<br/><br/>•How are diverging regulatory frameworks\n                  for hydrogen and methane markets handled?<br/><br/>Energinet would appreciate receiving\n                  your available time slots for participation in a Teams meeting in week 37, 38 or 39\n                  (7 to 25 September)<br/><br/>Please communicate via the tender platform Comdia</span></section>\n            <section><span class=\"label\">Internal identifier</span><span class=\"text\">: </span><span class=\"value\">763547</span></section>\n            <section>3.1.1&nbsp;<span class=\"label\">Purpose</span><section><span class=\"label\">Main nature of the contract</span><span class=\"text\">: </span><span class=\"dynamic-label\">Services</span></section>\n               <section><span class=\"label\">Main classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">72000000</span><span class=\"text\"> </span><span class=\"dynamic-label\">IT services: consulting, software development, Internet and support</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">48100000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Industry specific software package</span></section>\n               <section><span class=\"label\">Additional classification</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">cpv</span><span class=\"text\">): </span><span class=\"value\">72210000</span><span class=\"text\"> </span><span class=\"dynamic-label\">Programming services of packaged software products</span></section>\n            </section>\n            <section>3.1.2&nbsp;<span class=\"label\">Place of performance</span><section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n               <section><span class=\"dynamic-label\">Anywhere in the given country</span></section>\n            </section>\n            <section>3.1.3&nbsp;<span class=\"label\">Duration</span><section><span class=\"label\">Start date</span><span class=\"text\">: </span><span class=\"value\">17-07-2026</span></section>\n               <section><span class=\"label\">Duration end date</span><span class=\"text\">: </span><span class=\"value\">30-09-2026</span></section>\n            </section>\n            <section>3.1.5&nbsp;<span class=\"label\">General information</span><section><span class=\"label\">Reserved participation</span><span class=\"text\">: </span><span class=\"dynamic-label\">Participation is not reserved.</span></section>\n               <section><span class=\"label\">The procurement is covered by the Government Procurement Agreement (GPA)</span><span class=\"text\">: </span><span class=\"label\">yes</span></section>\n            </section>\n            <section>3.1.6&nbsp;<span class=\"label\">Procurement documents</span><section><span class=\"label\">Address of the procurement documents</span><span class=\"text\">: </span><span class=\"value\">https://www.comdia.com/energinet/md/market_dialogue_on_three_core_processes_for_future_market_system_at_energinet\n                     , </span></section>\n            </section>\n            <section>3.1.7&nbsp;<span class=\"label\">Terms of procurement</span><section><span class=\"label\">The execution of the contract must be performed within the framework of sheltered employment programmes</span><span class=\"text\">: </span><span class=\"dynamic-label\">No</span></section>\n            </section>\n            <section>3.1.8&nbsp;<span class=\"label\">Techniques</span><section><span class=\"label\">Framework agreement</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No framework agreement</span></section>\n               </section>\n               <section><span class=\"label\">Information about the dynamic purchasing system</span><span class=\"text\">:</span><section><span class=\"dynamic-label\">No dynamic purchase system</span></section>\n               </section>\n            </section>\n            <section>3.1.9&nbsp;<span class=\"label\">Further information, mediation and review</span><section><span class=\"label\">Review organisation</span><span class=\"text\">: </span><span class=\"value\">Danish Complaints Board for Public Procurement</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation providing additional information about the procurement procedure</span><span class=\"text\">: </span><span class=\"value\">Energinet Gastransmission A/S</span><span class=\"value\"></span></section>\n               <section><span class=\"label\">Organisation providing more information on the review procedures</span><span class=\"text\">: </span><span class=\"value\">Danish Competition and Consumer Authority</span><span class=\"value\"></span></section>\n            </section>\n         </section>\n      </section>\n      <section>8&nbsp;<span class=\"label\">Organisations</span><section>8.1&nbsp;<span class=\"value\">ORG-0001</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Energinet Gastransmission A/S</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">39315084</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Tonne Kjærsvej 65</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Fredericia</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">7000</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Sydjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK032</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Contact point</span><span class=\"text\">: </span><span class=\"value\">Kirsten Ebstrup</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">procurement@energinet.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">70102244</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://energinet.dk/</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Buyer</span></section>\n               <section><span class=\"label\">Organisation providing additional information about the procurement procedure</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1000</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Comdia ApS</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">33501404</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Lindvedvej 71</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Odense S</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">5260</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Fyn</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK031</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">support@comdia.com</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 7199 3672</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://www.comdia.com/</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">TED eSender</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1001</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Danish Complaints Board for Public Procurement</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">37795526</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Danish Appeals Boards Authority, Toldboden 2</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Viborg</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">8800</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Vestjylland</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK041</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">klfu@naevneneshus.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 7240 5600</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">http://www.klfu.dk</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Review organisation</span></section>\n            </section>\n         </section>\n         <section>8.1&nbsp;<span class=\"value\">ORG-1002</span><section><span class=\"label\">Official name</span><span class=\"text\">: </span><span class=\"value\">Danish Competition and Consumer Authority</span></section>\n            <section><span class=\"label\">Registration number</span><span class=\"text\">: </span><span class=\"value\">10294819</span></section>\n            <section><span class=\"label\">Postal address</span><span class=\"text\">: </span><span class=\"value\">Carl Jacobsens Vej 35</span><span class=\"text\"> </span><span class=\"value\"></span><span class=\"text\"> </span><span class=\"value\"></span></section>\n            <section><span class=\"label\">Town</span><span class=\"text\">: </span><span class=\"value\">Valby</span></section>\n            <section><span class=\"label\">Postcode</span><span class=\"text\">: </span><span class=\"value\">2500</span></section>\n            <section><span class=\"label\">Country subdivision (NUTS)</span><span class=\"text\">: </span><span class=\"dynamic-label\">Byen København</span><span class=\"text\"> </span><span class=\"text\">(</span><span class=\"value\">DK011</span><span class=\"text\">)</span></section>\n            <section><span class=\"label\">Country</span><span class=\"text\">: </span><span class=\"dynamic-label\">Denmark</span></section>\n            <section><span class=\"label\">Email</span><span class=\"text\">: </span><span class=\"value\">kfst@kfst.dk</span></section>\n            <section><span class=\"label\">Telephone</span><span class=\"text\">: </span><span class=\"value\">+45 4171 5000</span></section>\n            <section><span class=\"label\">Internet address</span><span class=\"text\">: </span><span class=\"value\">https://www.kfst.dk/</span></section>\n            <section><span class=\"label\">Roles of this organisation</span><span class=\"text\">:</span><section><span class=\"label\">Organisation providing more information on the review procedures</span></section>\n            </section>\n         </section>\n      </section>\n      <section><span class=\"label\">Notice information</span><section><span class=\"label\">Notice identifier/version</span><span class=\"text\">: </span><span class=\"value\">0479d785-0f7f-4874-aefe-2014d4b01d8a</span><span class=\"text\"> </span><span class=\"text\">- </span><span class=\"value\">01</span></section>\n         <section><span class=\"label\">Form type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Planning</span></section>\n         <section><span class=\"label\">Notice type</span><span class=\"text\">: </span><span class=\"dynamic-label\">Prior information notice or a periodic indicative notice used only for information</span></section>\n         <section><span class=\"label\">Notice dispatch date</span><span class=\"text\">: </span><span class=\"value\">17-07-2026</span><span class=\"text\"> </span><span class=\"value\">14:39 +02:00</span></section>\n         <section><span class=\"label\">Languages in which this notice is officially available</span><span class=\"text\">: </span><span class=\"dynamic-label\">English</span><span class=\"text\"> </span><span class=\"dynamic-label\"></span></section>\n         <section><span class=\"label\">Notice publication number</span><span class=\"text\">: </span><span class=\"value\">00500706-2026</span></section>\n         <section><span class=\"label\">OJ S issue number</span><span class=\"text\">: </span><span class=\"value\">137/2026</span></section>\n         <section><span class=\"label\">Publication date</span><span class=\"text\">: </span><span class=\"value\">20-07-2026</span></section>\n      </section>\n   </body>\n</html>","opsummeringDA":{"card":{"titel":"Market Dialogue on Three Core Processes for Future Market System at Energinet","ordregiver":"Energinet Gastransmission A/S","ordregiverId":"39 31 50 84","ordregiverIdDatavasket":"39315084","publiceringsdato":"2026-07-20+02:00","cpvKode":"72000000","cpvTitel":"It-tjenester: rådgivning, programmeludvikling, internet og support","formulartype":"Planlægning","formulartypeKode":"planning","tidsfrister":[],"alleOrdregivere":["Energinet Gastransmission A/S"],"beskrivelse":"As hydrogen infrastructure is expected to be established in Denmark, there is a need for a market system that can support three key market management processes. At the same time, the existing methane infrastructure will need to be supported by a new system solution.\n\nNomination – The shipper informs Energinet of the desired transportation quantity for a given time period as the basis for matching and balancing. Nominations and renominations are expected to be submitted at 15-minute intervals.\n\nMatching – Ensuring that transported quantities are aligned between two system operators with corresponding opposite values.\n\nAllocation – Ensuring correct allocation of physical measurements and the commercial outcome of matching as the basis for balance calculation and system management.\n\nA similar need exists for methane, as the intention is to harmonize the systems for methane and hydrogen.\n\nThe purpose of this Request for Information (RFI) is to identify available software solutions in the market that can support the processes described above. Energinet wishes to explore whether standard systems are available that can be configured to support both methane and hydrogen in separate instances with different configurations.\n\nThe solution is expected to comply with applicable EU rules for the transportation of methane and hydrogen. At present, the following regulations and network codes are relevant:\n\nThe Danish Gas Supply Act and EU Regulation 2024/1789\n\nBalancing NC | ENTSOG (https://www.entsog.eu/balancing-nc)\n\nInteroperability and Data Exchange NC | ENTSOG (https://www.entsog.eu/interoperability-and-data-exchange-nc)\n\nTimeline:\n\nRFI to be issued in mid-July\n\nDeadline for questions: 31 August\n\nRFI expected to be completed by 7 September\n\nDeadline for questions: 31 August\n\nDeadline for answers to questions: 7 September\n\nThe market dialogue is expected to begin in week 37 via Microsoft Teams. The expected meeting duration is two hours.\n\nImplementation and go-live must be completed by the end of June 2029.\n\nDescription of the procurement:\n\nEnerginet is exploring the possibility of procuring a market system that can support key business processes related to the operation and development of a hydrogen market. The system must also support the existing methane market. It is expected to handle and support market processes such as nomination, matching and allocation, as well as data exchange between relevant market participants and internal and external systems.\n\nThe procurement is expected to cover an overall solution capable of supporting both functional and technical needs, including configuration, integration, testing, implementation, documentation, operations, support and ongoing maintenance. It has not yet been determined whether the solution should be based on a standard solution, a configurable platform, custom development or a combination of these. Energinet’s preference is to make maximum use of standard and configurable functionality.\n\nThrough the market dialogue, Energinet wishes to obtain market input on possible solution models, delivery approaches, implementation processes, dependencies, risks and commercial conditions. This input will be used to qualify the further work on requirements, scope, timeline and a potential tender strategy.\n\nAfter 7 September, Energinet expects to select 3-5 suppliers to be invited to participate in dialogue meetings starting in week 37.\n\nEnerginet would appreciate receiving answers to the following questions by 31 August:\n\n1.Product maturity\n\n•Are genuine standard solutions available for nomination, matching and allocation?\n\n•Which TSOs or markets currently use the solution?\n\n2.Adaptation to Danish conditions\n\n•To what extent can configuration be carried out without code changes?\n\n•What level of adaptation is expected in relation to Danish market rules and the balancing model?\n\n•Which parts of the solution are typically customer-specific?\n\n3.Changes to market rules\n\n•How are changes to market rules handled after go-live?\n\n•Can such changes be handled through configuration, or do they require development?\n\n•What are the typical implementation timelines for rule changes?\n\n4.Architecture and critical logic\n\n•Where is the logic for balancing, cut-off, validation and allocation located?\n\n•Can critical logic be separated from the standard system?\n\n5.Implementation and timeline\n\n•What would be a realistic implementation period for a solution of this type?\n\n•What are considered the greatest risks to achieving go-live in July 2029?\n\n6.Deployment and platform\n\n•Can the solution run on-premises?\n\n•Can the solution run in a private cloud?\n\n•Can the solution run in a public cloud?\n\n•Are there any functional differences between the deployment models?\n\n7.Hydrogen and methane\n\n•Does the solution support both hydrogen and methane?\n\n•Can different market rules for hydrogen and methane be handled through configuration?\n\n•Can a single installation support both gas types simultaneously?\n\n•How are diverging regulatory frameworks for hydrogen and methane markets handled?\n\nEnerginet would appreciate receiving your available time slots for participation in a Teams meeting in week 37, 38 or 39 (7 to 25 September)\n\nPlease communicate via the tender platform Comdia","bkSubTypeKode":"5","bkSubType":"Vejledende periodisk bekendtgørelse kun anvendt til informationsformål – sektordirektivet","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":[],"udforelsesstedSubLand":[],"udforelsesstedLand":["Danmark"],"udforelsesstedBy":[],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"svarfrister":[],"antalParts":1,"antalLots":0,"udbudsDokumenter":["https://www.comdia.com/energinet/md/market_dialogue_on_three_core_processes_for_future_market_system_at_energinet"]},"opsummeringEN":{"card":{"titel":"Market Dialogue on Three Core Processes for Future Market System at Energinet","ordregiver":"Energinet Gastransmission A/S","ordregiverId":"39 31 50 84","ordregiverIdDatavasket":"39315084","publiceringsdato":"2026-07-20+02:00","cpvKode":"72000000","cpvTitel":"IT services: consulting, software development, Internet and support","formulartype":"Planning","formulartypeKode":"planning","tidsfrister":[],"alleOrdregivere":["Energinet Gastransmission A/S"],"beskrivelse":"As hydrogen infrastructure is expected to be established in Denmark, there is a need for a market system that can support three key market management processes. At the same time, the existing methane infrastructure will need to be supported by a new system solution.\n\nNomination – The shipper informs Energinet of the desired transportation quantity for a given time period as the basis for matching and balancing. Nominations and renominations are expected to be submitted at 15-minute intervals.\n\nMatching – Ensuring that transported quantities are aligned between two system operators with corresponding opposite values.\n\nAllocation – Ensuring correct allocation of physical measurements and the commercial outcome of matching as the basis for balance calculation and system management.\n\nA similar need exists for methane, as the intention is to harmonize the systems for methane and hydrogen.\n\nThe purpose of this Request for Information (RFI) is to identify available software solutions in the market that can support the processes described above. Energinet wishes to explore whether standard systems are available that can be configured to support both methane and hydrogen in separate instances with different configurations.\n\nThe solution is expected to comply with applicable EU rules for the transportation of methane and hydrogen. At present, the following regulations and network codes are relevant:\n\nThe Danish Gas Supply Act and EU Regulation 2024/1789\n\nBalancing NC | ENTSOG (https://www.entsog.eu/balancing-nc)\n\nInteroperability and Data Exchange NC | ENTSOG (https://www.entsog.eu/interoperability-and-data-exchange-nc)\n\nTimeline:\n\nRFI to be issued in mid-July\n\nDeadline for questions: 31 August\n\nRFI expected to be completed by 7 September\n\nDeadline for questions: 31 August\n\nDeadline for answers to questions: 7 September\n\nThe market dialogue is expected to begin in week 37 via Microsoft Teams. The expected meeting duration is two hours.\n\nImplementation and go-live must be completed by the end of June 2029.\n\nDescription of the procurement:\n\nEnerginet is exploring the possibility of procuring a market system that can support key business processes related to the operation and development of a hydrogen market. The system must also support the existing methane market. It is expected to handle and support market processes such as nomination, matching and allocation, as well as data exchange between relevant market participants and internal and external systems.\n\nThe procurement is expected to cover an overall solution capable of supporting both functional and technical needs, including configuration, integration, testing, implementation, documentation, operations, support and ongoing maintenance. It has not yet been determined whether the solution should be based on a standard solution, a configurable platform, custom development or a combination of these. Energinet’s preference is to make maximum use of standard and configurable functionality.\n\nThrough the market dialogue, Energinet wishes to obtain market input on possible solution models, delivery approaches, implementation processes, dependencies, risks and commercial conditions. This input will be used to qualify the further work on requirements, scope, timeline and a potential tender strategy.\n\nAfter 7 September, Energinet expects to select 3-5 suppliers to be invited to participate in dialogue meetings starting in week 37.\n\nEnerginet would appreciate receiving answers to the following questions by 31 August:\n\n1.Product maturity\n\n•Are genuine standard solutions available for nomination, matching and allocation?\n\n•Which TSOs or markets currently use the solution?\n\n2.Adaptation to Danish conditions\n\n•To what extent can configuration be carried out without code changes?\n\n•What level of adaptation is expected in relation to Danish market rules and the balancing model?\n\n•Which parts of the solution are typically customer-specific?\n\n3.Changes to market rules\n\n•How are changes to market rules handled after go-live?\n\n•Can such changes be handled through configuration, or do they require development?\n\n•What are the typical implementation timelines for rule changes?\n\n4.Architecture and critical logic\n\n•Where is the logic for balancing, cut-off, validation and allocation located?\n\n•Can critical logic be separated from the standard system?\n\n5.Implementation and timeline\n\n•What would be a realistic implementation period for a solution of this type?\n\n•What are considered the greatest risks to achieving go-live in July 2029?\n\n6.Deployment and platform\n\n•Can the solution run on-premises?\n\n•Can the solution run in a private cloud?\n\n•Can the solution run in a public cloud?\n\n•Are there any functional differences between the deployment models?\n\n7.Hydrogen and methane\n\n•Does the solution support both hydrogen and methane?\n\n•Can different market rules for hydrogen and methane be handled through configuration?\n\n•Can a single installation support both gas types simultaneously?\n\n•How are diverging regulatory frameworks for hydrogen and methane markets handled?\n\nEnerginet would appreciate receiving your available time slots for participation in a Teams meeting in week 37, 38 or 39 (7 to 25 September)\n\nPlease communicate via the tender platform Comdia","bkSubTypeKode":"5","bkSubType":"Periodic indicative notice used only for information – sectoral directive","erAendring":false},"indholdsType":"HENTET_FRA_TED","sekundaereOrdregivere":[],"udforelsesstedNutsCode":[],"udforelsesstedSubLand":[],"udforelsesstedLand":["Denmark"],"udforelsesstedBy":[],"tilbudsfrister":[],"intressentfrister":[],"deltagelsefrister":[],"svarfrister":[],"antalParts":1,"antalLots":0,"udbudsDokumenter":["https://www.comdia.com/energinet/md/market_dialogue_on_three_core_processes_for_future_market_system_at_energinet"]}}