Udførelse af elektriske installationer 2020/S 135-331480

Kort beskrivelse

The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 19 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires design, procurement and building/installation, testing and commissioning and maintenance of a Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) system for the tunnel that delivers a high level of reliability, availability, maintainability and safety.

The objective of the tunnel MEICA System is to enable Femern A/S to efficiently manage the operation, maintenance, safety and security of the tunnel through an integrated set of electrical and mechanical systems. This should be achieved while observing Femern A/S' CSR policies.

Læs mere
Ordregiver Femern A/S
Annonceret 15-07-2020 kl. 00.00
Sidst ændret 15-07-2020 kl. 10.00
Deadline
Udbudstype EU-udbud
Udbudsdetaljer http://ted.europa.eu/udl?uri=TED:NOTICE:331480-2020:TEXT:EN:HTML
Leveringssted Sjælland, SCHLESWIG-HOLSTEIN
Dokumenttype Forhåndsmeddelelse